7 floors · 52 apartments · 45,375 sq ft · built 1964 · class D1 · owner of record: Inedependence Apts .
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 56 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 56 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 72 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 45,375 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 177 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 177 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 300 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $1,619,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 839 days | Filing window not open yet |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 9, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. AT TIME OF INSPECTIONOBSERVED OBJECTS ON SIDEWALK SHED BOCKING THE DROP LADDER DOWN/ALLOWING PEOPLE TO USE DURING A EMERGENCY PLYWOOD IS INSTALLED BY EXP #2 FIRE #35690087K | Jun 20, 2025 ADMIT/IN-VIO | $0 |
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AV ACCEPTABLE REQUIRED CYCLE 7C, 8C, AND 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #908127. AGG2 HISTORY OF NO #37034433L | Jul 18, 2025 DEFAULT | $10,000 |
| May 16, 2024 | Elevators CLASS - 1 RESPONDING TO A 311 ELEVATOR COMPLAINT, UPON INSPECTION OF SINGLE CAR IN THE BUILDING, A CEASE USE VIOLATION WAS ISSUED FOR TWO ITEMS. 1/ INTER LOCK ON LOBBY DOOR DEFECTIVE, WORK INTERMITTENTLY. 2/ CAR DOOR RES #39114534N | Aug 2, 2024 ADMIT/IN-VIO | $0 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 7C AND 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#808127.AGG2 HISTORY OF NONCOMPLI #37022825M | Jan 20, 2023 DEFAULT | $10,000 |
| Oct 14, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE/WALLS AND APPURTENANCES.AT THE TIME OF ISNPECTION OBSERVED AT EXPOSURE 1 EAST ELEVATION STEP CRACK ON PARAPET WALL AT NORTH WAST FACING.DAMAGED LINTELS AT MULTIPLE L #35577938P | Jan 7, 2022 DEFAULT | $6,250 |
| Jun 19, 2020 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCES.AT THE TIME OF INSPECTION OBSERVED AT EXPOSURE 1,A/C UNIT SUPPORT INDICATE.ROOF:MULTIPLE DAMAGED COPING STONE AT ALL EXPOSURE.DETORATION OF C #35538311J | Aug 21, 2020 DEFAULT | $6,250 |
| May 20, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 7C & 8C REPORT CRITICALEXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#808127. AGG2 HISTORY OF NONCOMPLIANCE ON #37018997R | Aug 21, 2020 DEFAULT | $10,000 |
| Feb 22, 2020 | Construction CLASS - 1 FAILURE TO TAKE REQUIRED MEASURES TO PROTECT PUBLIC FROM DOCUMENTED UNSAFE FACADE AS NOTED:A FISP 3 UNSAFE NOTIFICATION WAS SUBMITTED TO THEDEPARTMENT OF BUILDINGS ON 2/11/20 AND AS OF 2/22/20 NO SAFETY MEASURE #35458439Z | Aug 28, 2020 DEFAULT | $12,500 |
| Oct 28, 2019 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#808127. AGG2 HISTORY IF NONCOMPLIANCE ON 37009340H #37015932M | Feb 6, 2020 IN VIOLATION | $6,250 |
| Mar 7, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #708127.AGG2 HISTORY OF NONCOMPLIANCE ON 36023956 #37009340H | Jun 1, 2018 WRITTEN OFF | $0 |
| May 11, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG.*EAST ELEVATION,EXP#1 OBSERVED STEP CRACKS AND DETERIORATING IN PARAPET AND SHELF ANGLES;BENDING AND DETERIORATING IN LINTEL FACADE:METAL CANS UNDER A/C UNITS,BLOCKS OF WOOD ON #35253631J | Jun 30, 2017 WRITTEN OFF | $0 |
| May 11, 2016 | Elevators CLASS - 2 15M07,40O02,41D10,59U15,70O02,71L10 #38242524J | Jul 1, 2016 IN VIOLATION | $0 |
| Dec 7, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE WITH CODEPROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES ASREQUIRED BY ARTICLE 28.302 AND THE DEPT OF BUILDINGS RULES AND REGULAT #36023956K | May 6, 2016 WRITTEN OFF | $0 |
| Sep 4, 2015 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG EXP#1 W/STOP CRACK THROUGHOUT FACADEW/SOME BLDG BRICK-DETERIORATING MORTAR JOINTS. THERE IS NO REPORT FILED FOR THIS BLDG CYCLE 7 LL11 FACADE REPORT. REMEDY: PROVIDE PUBLIC #35160251P | Oct 30, 2015 WRITTEN OFF | $0 |
| Jan 5, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULAT #36027090R | May 29, 2015 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: OBSERVED THE FOLLOWING CONDITION: LONG VERTICAL CRACK AT EXPOSURE 2, EXTENDED FROM FOUNDATION WALL TO REGULAR BRICK. REMEDY: REPAIR AND/OR REPLACE #SR0803NS | DOB VIOLATION - ACTIVE |
| May 27, 2025 | CONSTRUCTION ADDITIONAL INFO.@WEST FOUNDATION WALL OBSERVED VERTICAL CRACKS&VOIDS SETTLED SLAB ON GRADE.ENGAGE NYSPE TO DO THE FOLLOWING:1.SET UP MONITORS,ETC,2.EVAL THE CNSTRCTN OF THE CAST IN PLACE #FEU20101XC | DOB VIOLATION - ACTIVE |
| May 27, 2025 | CONSTRUCTION FAILURE TO MAINTAIN.@THE REAR WALL THERE WERE VERTICAL CRACKS OBSERVED @FOUNDATION WALL.THE SLAB ON GRADE HAD CRACKED &SETTLED THROUGHOUT CRACK WERE ALSO NOTED@BOILER ROOM.OWNR TO ENGAGE NYSPE&CNTRCTR TO RPAIR UNDR PRMT.OBTAIN PRMT BY 8/31/2025.COMPLETE BY 9/31/25 #FEU20802XC | DOB VIOLATION - ACTIVE |
| Apr 9, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING CODE IN A COMPLIANT MANNER. NOTED DURING INSPECTION AT EXPOSURE #3 VERTICAL CRACKS FROM GROUND TO BRICK LEVEL IN MULTIPLE POINTS. REMEDY: REPAIR OR REPLACE #SR20803DO | DOB VIOLATION - ACTIVE |
| Jul 24, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00066 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00563 | DOB VIOLATION - ACTIVE |
| Dec 1, 2023 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2300841 | DOB VIOLATION - ACTIVE |
| Aug 2, 2022 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00211 | DOB VIOLATION - ACTIVE |
| Dec 1, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2101760 | DOB VIOLATION - ACTIVE |
| Nov 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00321 | DOB VIOLATION - ACTIVE |
| Jun 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00736 | DOB VIOLATION - ACTIVE |
| Apr 29, 2021 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2002385 | DOB VIOLATION - ACTIVE |
| Feb 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00274 | DOB VIOLATION - ACTIVE |
| Nov 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00359 | DOB VIOLATION - ACTIVE |
| Aug 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00661 | DOB VIOLATION - ACTIVE |
| May 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00661 | DOB VIOLATION - ACTIVE |
| Aug 2, 2019 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00795 | DOB VIOLATION - ACTIVE |
| Sep 15, 2017 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST #02037 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #04917 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #05519 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #05688 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #08930 | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #00986 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST #02293 | DOB VIOLATION - ACTIVE |
| Oct 1, 2005 | LOCAL LAW 10/81 - ELEVATOR #02564 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Active |
| Jun 24, 2026 | GHG Emissions - LL97 FTF-EN-LL97321 | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Jul 24, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Dec 1, 2023 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 2, 2022 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Dec 1, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Nov 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Feb 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2019 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Sep 15, 2017 | Elevators EVCAT1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Oct 1, 2005 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 9, 2026 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS PAPER SIGN | Jun 12, 2026 |
| Mar 9, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL | Jun 12, 2026 |
| Mar 9, 2026 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX PAPER SIGN AT PUBLIC HALL | Jun 12, 2026 |
| Mar 9, 2026 | B | § 27-2039 ADM CODE PROVIDE ADEQUATE LIGHT OF NOT LESS THAN 60 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION AT CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST | Apr 13, 2026 |
| Mar 9, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST | Jun 12, 2026 |
| Mar 9, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST | Apr 13, 2026 |
| Mar 9, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST | Apr 13, 2026 |
| Mar 9, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLYS AT DOOR AT PUBLIC HALL STAIRS, 6th STORY | Apr 13, 2026 |
| Mar 9, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR AT PUBLIC HALL STAIRS, 6th STORY | Mar 23, 2026 |
| Nov 24, 2025 | C | Apt 4H · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 20, 2025 |
| Nov 24, 2025 | C | Apt 4H · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 4H, 3rd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Nov 22, 2025 |
| Jun 16, 2023 | B | Apt LB · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR NORTH WALL IN THE KITCHEN LOCATED AT APT LB, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 21, 2023 |
| Jun 16, 2023 | B | Apt LB · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT LB, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 21, 2023 |
| Jun 16, 2023 | C | Apt LB · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE ENTRANCE LOCATED AT APT LB, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jun 30, 2023 |
| Jun 16, 2023 | B | Apt LB · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BASE METAL CABINET AT SINK IN THE KITCHEN LOCATED AT APT LB, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 21, 2023 |
| Jul 20, 2022 | C | Apt 2B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st CLOSET FROM EAST AT SOUTH WALL DOOR FRAME IN THE FOYER LOCATED AT APT 2B, 2nd STOR | Aug 13, 2022 |
| Nov 1, 2021 | A | Apt 3E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Feb 4, 2022 |
| Nov 1, 2021 | B | Apt 3E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 3E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 6, 2021 |
| Nov 1, 2021 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 6, 2021 |
| Nov 1, 2021 | B | Apt 3E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 3E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 6, 2021 |
| Nov 1, 2021 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 3E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Dec 6, 2021 |
| Oct 21, 2021 | B | Apt 3E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX.2 SQ.FT.), NORTH WALL (APPROX.2 SQFT.) & WEST WALL (APPROX.2 SQ.FT) IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 14400785 ISSUED 21-JUN-21 HAS | Nov 25, 2021 |
| Jun 23, 2021 | B | Apt 3E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING & WALLS IN THE BATHROOM LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Jul 28, 2021 |
| Jun 23, 2021 | A | Apt 3E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING & SOUTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 3E, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 26, 2021 |
| Jan 20, 2021 | C | Apt 5B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (5 SQFT) AT SOUTH WALL (5 SQ FT) AT EAST WALL (5 SQ FT) IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 13839901 ISSUED 29-SEP-20 HAS BEEN UPGRADED TO CLA | Feb 15, 2021 |
| Jan 19, 2021 | C | Apt 5B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APROX. 15 SQ. FT. AT CEILING APROX. 15 SQ.FT. AT EAST WALL APROX. 15 SQ. FT. AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 14, 2021 |
| Oct 6, 2020 | A | Apt 5B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE BATHROOM , THE 3rd ROOM FROM EAST AT CENTER LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 9, 2021 |
| Jan 20, 2017 | C | Apt 5F · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 5F, 5th STORY, 1st APARTMENT FROM | Feb 17, 2017 |
| Sep 12, 2016 | B | Apt 5F · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRIC BELL BUZZER / INTERCOM SYSTEM FROM ENTRANCE TO BUILDING TO APT IN THE ENTIRE APARTMENT LOCATED AT APT 5F, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Oct 17, 2016 |
| Jan 31, 2012 | B | Apt 5B · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ... IN THE ENTRANCE LOCATED AT APT 5B, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 6, 2012 |
| Jan 31, 2012 | A | Apt 5B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM EAST AT SOUTH, THE 3rd ROOM FROM EAST AT CENTER, THE 1st ROOM FROM EAST, THE BATHROOM , THE PRIVATE HALLWAY , THE FOYER LOCATED AT APT 5B, 5th STORY, 1st APARTMENT | May 5, 2012 |
| Jan 6, 2010 | C | Apt 3F · SECTION 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER | Feb 1, 2010 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | DOB Safety | GHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B). | Open |
| Jul 30, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: OBSERVED THE FOLLOWING CONDITION: LONG VERTICAL CRACK AT EXPOSURE 2, EXTENDED FROM FOUNDATION WALL TO REGULAR BRICK. REMEDY: REPAIR AND/OR REPLACE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 9:15 PM ET. BBL 2032630104.