1 floors · 3,800 sq ft · built 1925 · class K1 · owner of record: Jgw Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 42 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 773 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 30, 2024 | Unknown CLASS - 1 DURING ELECTRICAL INSPECTION OF APP X00963204 THAT COVERS 6 OUTLETS, ON 3/22/24, IT WAS OBSERVED THAT A COMPLETE RENOVATION INCLUDING LIGHT FIXTURES, DEVICES, 50 AMP RECEPTACLES, NEW BRANCH CIRCUIT WIRING THROU #39110366P | Oct 11, 2024 DEFAULT | $8,000 |
| Issued | Violation | Status |
|---|---|---|
| Aug 21, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00089 | DOB VIOLATION - ACTIVE |
| Jul 9, 2024 | PLUMBING THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE THE PERMIT AND APPROVALS ISSUED IN CONNECTION TO JOB#X00981493-S1-PL DUE TO SUSPENSION OF THE MASTER PLUMBER LICENSE #2286. ALL PLUMBING WORK IN CONNECTION WITH THIS APPLICATION HAS BEEN ORDERED STOPPPED IMMEDIATELY. #24-01828 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Aug 21, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 19, 2026, 4:39 AM ET. BBL 2054350006.