5 floors · 10 apartments · 12,491 sq ft · built 2023 · class D7 · owner of record: 3802 White Plains Property Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 427 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 14, 2026 | Construction CLASS - 2 DURING MY INSPECTION OF A CLOSED 5-STORY NB. I OBSERVED INADEQUATE PEDESTRIAN PROTECTION EXPOSURE ONE SIDEWALK SHED IN PLACE, SHARP EDGES AT A LOW HEIGHT, UNCAPPED BOLTS, AND LOOSE DIAGONAL BRACING. ECB VIOLATI #39555471Z | Jan 29, 2027 PENDING | $2,400 |
| Jun 1, 2026 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF A 5-STORY NEW BUILDING, I OBSERVED A SIDEWALK SHED ERECTED EXP#1 AT BUILDING NOT MAINTAIN AS PER CODE 3307.6.4.10 MUDSILLS ROTTER/ BROKEN, SHARP EDGES NOT PROTECTED AS PER BC 330 #39554810J | Feb 5, 2027 PENDING | $2,400 |
| Jun 1, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF A 5-STORY NEW BUILDING, I OBSERVED SIDEWALK SHED IN PLACE, DURING MY INSPECTION I NOTICED SIDEWALK SHED HAS NO BUILDING INFORMATION PANEL. THIS CREATE A HAZARDOUS SITUATION FOR FIRS #39554809M | Feb 5, 2027 PENDING | $1,250 |
| Jun 1, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF A 5-STORY NEW BUILDING, I OBSERVED SUPPORTED SCAFFOLDING AT EXPOSURE #1-2 & 2-3 CORNER WITH LOOSE VERTICAL NETTING NOT MAINTAINED PER BC 3314.8.2 THIS CONDITION POSES AN IMMEDIATE H #39554811L | Feb 5, 2027 | $2,500 |
| Mar 31, 2026 | Construction CLASS - 2 OBSERVED NETTING AT EXPOSURES 1 AND 3 LOOSE, NOT SECURED, AND OPEN. NETTING NOT EFFECTIVE IN PREVENTING FALLING DEBRIS, CREATING A HAZARD TO THE PUBLIC. BC -3301.2 #39552432M | Jun 5, 2026 IN VIOLATION | $2,400 |
| Jun 18, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE EXPIRED PERMIT. AS NOTED: AT TIME OF INSPECTION SITE FOR A PROPOSED 5 STORY BUILDING ALREADY AT THEBULKHEAD LEVEL WAS CLOSED. OBSERVED CONSTRUCTION FENCE PERMIT HAD EXPI #35693925Y | Aug 29, 2025 DEFAULT | $3,125 |
| Feb 28, 2024 | Unknown CLASS - 2 BC3301.6 MANUFACTURER SPECIFICATIONS, DESIGN, AND CAPACITY- OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1 OF JOBSITE APPROX. 8FT IN HEIGHT WITH MAKESHIFT CONNECTIONS. UPON REQUEST FOR APPROVED DESIGN DRAWINGS #39525991P | May 2, 2025 IN VIOLATION | $2,500 |
| Feb 28, 2024 | Construction CLASS - 1 OBSERVED COLD FORM STEEL INSTALLED THROUGHOUT JOBSITE WITH MODIFIED/MAKESHIFT BLOCKING INSTALLED. UPON REVIEW OF APPROVED DRAWINGS NO DETAILS ARE SHOWN FOR THE MODIFIED BLOCKING, NO STRAPS & CLIP ANGELS ARE INS #39525987M | May 2, 2025 IN VIOLATION | $625 |
| Feb 28, 2024 | Unknown CLASS - 2 BC 3301.6.4 CAPACITY- OBSERVED SUPPORTED SCAFFOLD INSTALLED ON MAKESHIFT STEEL PLATFORM @ EXPO 3. CONNECTIONS TO SCAFFOLDING ARE TACK WELDED FROM THE STEEL PLATFORM TO THE SUPPORTED SCAFFOLD. UPON REQUEST FOR T #39525985Z | May 2, 2025 IN VIOLATION | $2,500 |
| Feb 28, 2024 | Construction CLASS - 2 BC3301.13.1 SITE SAFETY PLAN- OBSERVED ACTIVE 5 STORY TOPPED OFF JOBSITE WITH SIDEWALK SHED INSTALLED AT EXPOSURE 1. UPON REQUEST FOR THE SITE SAFETY PLAN, NONE WERE PROVIDED AT THE TIME OF INSPECTION. AS PER C #39525992R | May 2, 2025 IN VIOLATION | $1,250 |
| Feb 28, 2024 | Unknown CLASS - 1 OBSERVED ACTIVE 5 STORY TOPPED OF NEW BUILDING JOBSITE. @ EXPOSURE 4 CMU WALL HAS BEEN INSTALLED, NO PROTECTION HAS BEEN PROVIDED TO THE ADJACENT PROPERTY DURING CONSTRUCTION OPERATIONS. LARGE AMOUNTS OF CMU DE #39525986K | May 2, 2025 IN VIOLATION | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2026 | CONSTRUCTION BXCO ORDER TO STOP WORK IMMEDIATELY DUE TO CONSTRUCTION SUPERINTENDANT WITHDRAWAL APPLICATION # 220493883 STOP ALL WORK AND MAKE SITE SAFE. SWO #OP-71-25-01888 ISSUED. UNABLE TO VERIFY THE PERCENTAGE OF WORK COMPLETED #26-02286 | DOB VIOLATION - ACTIVE |
| Jul 27, 2026 | CONSTRUCTION BC STOP WORK ORDER DUE TO GENERAL CONTRACTOR WITHDRAWAL OF JOB # 220493883. PSWO #OP-71-25-01807 POSTED. UNABLE TO VEIFY THE PERCENTAGE OF WORK COMPLETED #26-01864 | DOB VIOLATION - ACTIVE |
| Jul 27, 2026 | CONSTRUCTION NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO CONSTRUCTION SUPERINTENDANT WITHDRAWAL. UNABLE TO VERIFY THE PERCENTAGE OF WORK COMPLETED. PSWO #OP-71-25-01806 POSTED #26-01863 | DOB VIOLATION - ACTIVE |
| May 15, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00085 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| May 15, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | DOB | CONSTRUCTION: BXCO ORDER TO STOP WORK IMMEDIATELY DUE TO CONSTRUCTION SUPERINTENDANT WITHDRAWAL APPLICATION # 220493883 STOP ALL WORK AND MAKE SITE SAFE. SWO #OP-71-25-01888 ISSUED. UNABLE TO VERIFY THE PERCENTAGE OF WORK COMPLETED | Open |
| Jul 27, 2026 | DOB | CONSTRUCTION: BC STOP WORK ORDER DUE TO GENERAL CONTRACTOR WITHDRAWAL OF JOB # 220493883. PSWO #OP-71-25-01807 POSTED. UNABLE TO VEIFY THE PERCENTAGE OF WORK COMPLETED | Open |
| Jul 27, 2026 | DOB | CONSTRUCTION: NOTICE OF ORDER TO STOP WORK IMMEDIATELY DUE TO CONSTRUCTION SUPERINTENDANT WITHDRAWAL. UNABLE TO VERIFY THE PERCENTAGE OF WORK COMPLETED. PSWO #OP-71-25-01806 POSTED | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 10:52 AM ET. BBL 2046670048.