Bronx · Block 5777 · Lot 772 · 10463

3800 Waldo Avenue

20 floors · 173 apartments · 154,640 sq ft · built 1966 · class D4 · owner of record: Waldo Gardens Inc

11open violations
$5,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 60 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 154,640 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 181 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 181 days
Annual filing
Energy audit and retro-commissioning (2027) Likely applies
Local Law 87 · Calendar year 2027
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5777). Agency page

Dec 31, 2027
in 425 days
Next due 2027
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $119,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 477 days
No Cycle 10 report on record yet
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-11 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (1) · $5,000 owed
IssuedViolationHearingBalance
Apr 9, 2026Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES.. AT TIME OF INSPECTION OBSERVED AT EXPOSURE'S 2(LEFT) & 4(RIGHT) 1-20TH FLOORS OBSERVED AT BOTTOM SIDES OF BALCONY'S SPALLING IN MULTIPLE AREAS THROUGHOUT
#39183872P
Jul 17, 2026
IN VIOLATION
$5,000
DOB (2)
IssuedViolationStatus
May 14, 2024CONSTRUCTION
EMERGENCY WORK ORDER DUE TO A BROKEN WELDING POINT AND DISLODGED CONNE CTION POINT ON THE METAL PARAPET RAILING ON THE NORTHWEST OF EXP4 NORT H ELEV AT ROOF LEVEL.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES TO SEC URE AND PROTECT THE PUBLIC.MAKE IMMEIDATE REPAIRS UNDER THE SUPERVISIO N OF A LICENSED
#FA20802JP
DOB VIOLATION - ACTIVE
Apr 8, 2011ELEVATOR

#9027/36782N
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Jul 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
HPD (5) · C 0 · B 3 · A 2
IssuedClassViolationCorrect by
Jun 8, 2026BApt 20H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING THE BATHTUB IN THE BATHROOM LOCATED AT APT 20H, 20th STORY, 2nd APARTMENT FROM EAST AT SOUTHJul 13, 2026
Nov 26, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR AT EAST EXTERIOR WALL , 2nd STORYDec 31, 2024
Mar 12, 2019BApt 1G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WODDEN FLOOR IN THE KITCHEN LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTApr 16, 2019
Mar 12, 2019AApt 1G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOODEN FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJun 15, 2019
Mar 12, 2019AApt 1G · § 27-2005 ADM CODE REFIT THE DOOR IN THE ENTRANCE LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJun 15, 2019

Issued in the last 120 days

DateSourceWhatNow
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Closed
Jul 30, 2026DOB SafetyAEUHAZ: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 11:25 AM ET. BBL 2057770772.

Look up another building