Brooklyn · Block 1330 · Lot 25 · 11225

380 Lefferts Avenue

7 floors · 46 apartments · 45,316 sq ft · built 2009 · class D7 · owner of record: Lefferts Property Llc

37open violations
$1,250ECB/OATH penalties owed
7HPD class C (immediately hazardous)
61dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 61 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 61 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 77 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 45,316 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 182 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 182 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 305 days
Registered through 2027-09-01
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $40,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 478 days
No Cycle 10 report on record yet

Open violations

ECB / OATH (1) · $1,250 owed
IssuedViolationHearingBalance
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #917821. REMEDY: SUBMIT ACCEPTABLE REQU
#37028124R
Oct 7, 2024
IN VIOLATION
$1,250
DOB (3)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00695
DOB VIOLATION - ACTIVE
Aug 2, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00622
DOB VIOLATION - ACTIVE
Jun 2, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00952
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Aug 2, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 2, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (30) · C 7 · B 17 · A 6
IssuedClassViolationCorrect by
Oct 8, 2026BApt 7B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 12, 2026
Oct 8, 2026BApt 7B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE WOOD FLOORING RAISED IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 12, 2026
Oct 8, 2026BApt 7B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 12, 2026
Oct 8, 2026AApt 7B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED IN CLOSET AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 11, 2027
Oct 8, 2026BApt 7B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH, AND EAST WALLS IN THE BATHROOM LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 12, 2026
Oct 8, 2026BApt 7B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER AT CEILING IN THE BATHROOM LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 12, 2026
Oct 5, 2026BApt APT7B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 9, 2026
Oct 5, 2026CApt APT7B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOct 11, 2026
Oct 5, 2026BApt APT7B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH, NORTH AND WEST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 9, 2026
Oct 5, 2026AApt APT7B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT CEILING AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHJan 8, 2027
Oct 5, 2026BApt APT7B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHNov 9, 2026
Aug 1, 2024CApt 3F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHAug 27, 2024
Dec 18, 2023AApt 4A · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT HEATING ELEMENT IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHMar 22, 2024
Oct 1, 2021B§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF AN UNACCEPTABLE ELECTROMAGNETIC LOCKING DEVICE INSTALL AT THE VESTIBULE DOOR AT PUBLIC HALL, 1st STORYNov 5, 2021
Jul 6, 2021AApt 2A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT NORTH WALL IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHOct 9, 2021
Dec 18, 2020C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF ELECTROMAGNETIC LOCKING DEVICE INSTALLED AT BUILDING VESTIBULE DOOR , 1st STORYDec 24, 2020
Oct 13, 2020BApt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHNov 17, 2020
Oct 13, 2020BApt 6C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHNov 17, 2020
Oct 13, 2020BApt 6C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHNov 17, 2020
Oct 13, 2020BApt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 6C, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTHNov 17, 2020
Mar 12, 2020BApt 1D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX. 2 SQ FT) IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 13442065 ISSUED 09-NOV-19 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.Apr 16, 2020
Nov 14, 2019A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT BASEMENTFeb 17, 2020
Nov 14, 2019C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLAR AT BOILER ROOMNov 22, 2019
Nov 14, 2019C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT BASEMENTNov 22, 2019
Nov 14, 2019C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT CELLARNov 22, 2019
Nov 13, 2019AApt 1D · § 27-2011 ADM CODE CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC TILES AT WEST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 16, 2020
Nov 13, 2019BApt 1D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 18, 2019
Nov 13, 2019BApt 1D · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 18, 2019
Nov 13, 2019BApt 1D · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 18, 2019
Nov 12, 2019CApt 1D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 10, 2019

Issued in the last 120 days

DateSourceWhatNow
Oct 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 8, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE COMPOSITE WOOD FLOORING RAISED IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 8, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED IN CLOSET AT WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH, AND EAST WALLS IN THE BATHROOM LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 8, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER AT CEILING IN THE BATHROOM LOCATED AT APT 7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 5, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE BATHROOM LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 5, 2026HPD C§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 5, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, SOUTH, NORTH AND WEST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 5, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET OBSERVED AT CEILING AND SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen
Oct 5, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, NORTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT APT7B, 7th STORY, 2nd APARTMENT FROM EAST AT SOUTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 6:56 PM ET. BBL 3013300025.

Look up another building