10 floors · 42,473 sq ft · built 2008 · class H4 · owner of record: Priya Hospitality Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 42,473 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $120,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 848 days | Filing window not open yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 31, 2026 | Construction CLASS - 1 ATOI OBSERVED IN THE MAIN HOT WATER HEATER ROOM ON THE ROOF INSTALLED A NEW 80 GAL. HWH WITH NO PERMITS ON FILE CHECKED BIS/DOBNOW NO PERMITS ON FILE THE DIRECTOR ALSO SAID THEY WERE TOLD THEY DIDN'T NEED A PER #39202505Y | Nov 10, 2026 PENDING | $2,500 |
| Aug 25, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE- FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRE STOPPING PER BC 712.3 (2014 CODE); 27-345; BC 711.2.4 (2022 CODE. OBSERVED HOLE PENETRATIONS AT CELLAR LEVEL #39158267M | Aug 18, 2026 IN VIOLATION | $2,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 7, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | ECB | Construction: ATOI OBSERVED IN THE MAIN HOT WATER HEATER ROOM ON THE ROOF INSTALLED A NEW 80 GAL. HWH WITH NO PERMITS ON FILE CHECKED BIS/DOBNOW NO PERMITS ON FILE THE DIRECTOR ALSO SAID THEY WERE TOLD THEY DIDN'T NEED A PER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 1:56 PM ET. BBL 4004710702.