Queens · Block 312 · Lot 300 · 11101

38-34 Review Avenue

1 floors · 32,600 sq ft · built 2000 · class F9 · owner of record: Waste Management Of New York, L.L.C.

4open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
168dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 32,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Feb 23, 2010Construction CLASS - 1
FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.NOTED@ 1ST FLR APPROX 20 COLUMNS HAVE BEEN REMOVED THAT 2ND FLR 10 COLUMNS HAVE BBEN REMOVED W/O ANY TEMPORARY SUPPORTS IN PLACE
#34820945Y
Apr 20, 2010
WRITTEN OFF
$0
Feb 9, 2010Construction CLASS - 1
SEC. 28-307.1 BC 1001.3.1 OBSTRUCTION OF REQUIRED WORK PLACE EXITS. NOTED: AT TIME OF INSPECTION WOOD GATES INTO JOBSITE W/APPROX 6-8 MEN WORKING ON ROOF INSIDE. HAD GATES CHAINED & LOCKED FROM INSIDE SITE DENY
#34820934Z
Apr 6, 2010
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 9:05 AM ET. BBL 4003120300.

Look up another building