10 floors · 34,533 sq ft · built 2009 · class H3 · owner of record: Sterling Hospitality Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 34,533 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $431,250 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 481 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 795 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 22, 2026 | Unknown CLASS - 1 MISCELLANEOUS VIOLATION OF THE ELECTRICAL CODE TECHNICAL STANDARDS. AT TIME OF INSPECTION THAT WAS SCHEDULED THERE IS NO KEYS ON SITE TO ACCESS ALL THE MAIN UTILITIES FOR INSPECTION PROVIDED BY OWNER. UTILITES #39208878Y | Dec 29, 2026 PENDING | $1,600 |
| Oct 15, 2026 | Elevators CLASS - 1 CLASS 1 C/U: BOTH BRAKE SWITCHES INACTIVE, AS PER ASME A17.1 2.26.1.5. REMEDY: RESTORE OPERATION. PHASE I FIREFIGHTERS' SERVICE INOPERATIVE, AS PER ASME A17.1 2.27.3.1. REMEDY: REPAIR/RESTORE OPERATION. EMAIL E #39208022R | Dec 22, 2026 PENDING | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Feb 18, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #910839 | DOB VIOLATION - ACTIVE |
| Nov 19, 2019 | FACADE SAFETY PROGRAM UNSAFE REPORT FILED #HAZ88446 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Feb 18, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
| Nov 19, 2019 | Facades FISP UNSAFE REPORT FILED | Active |
| Jul 31, 2018 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 22, 2026 | ECB | Unknown: MISCELLANEOUS VIOLATION OF THE ELECTRICAL CODE TECHNICAL STANDARDS. AT TIME OF INSPECTION THAT WAS SCHEDULED THERE IS NO KEYS ON SITE TO ACCESS ALL THE MAIN UTILITIES FOR INSPECTION PROVIDED BY OWNER. UTILITES | Open |
| Oct 15, 2026 | ECB | Elevators: CLASS 1 C/U: BOTH BRAKE SWITCHES INACTIVE, AS PER ASME A17.1 2.26.1.5. REMEDY: RESTORE OPERATION. PHASE I FIREFIGHTERS' SERVICE INOPERATIVE, AS PER ASME A17.1 2.27.3.1. REMEDY: REPAIR/RESTORE OPERATION. EMAIL E | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 28, 2026, 8:23 AM ET. BBL 4003880023.