Queens · Block 5024 · Lot 7504 · 11354

38-22 147 Street

5 floors · 32 apartments · 23,223 sq ft · built 2001 · class RM · owner of record: Unavailable Owner

33open violations
$0ECB/OATH penalties owed
5HPD class C (immediately hazardous)
61dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 61 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 77 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 305 days
Registered through 2027-09-01
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1157 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-21 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
Oct 18, 2022Boilers CLASS - 3
BOILER KEY MUST BE AT SIGHT AT ALL TIMES AS PER 272033 CODE,CORRECT VIOLATION & SEND IN CERTIFICATE OF CORRECTION
#39072193L
Dec 6, 2022
ADMIT/IN-VIO
$0
Apr 5, 2021Boilers CLASS - 2
RELIEF VALVE INSTALLED IN WRONG POSITION, BACKFLOW PREVENTOR LEAKING, CORRECT ALL VIOLATING CONDITIONS AND SUBMIT A CERTIFICATE OF CORRECTION
#39038806X
May 25, 2021
ADMIT/IN-VIO
$0
DOB (5)
IssuedViolationStatus
Feb 2, 2020FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01039
DOB VIOLATION - ACTIVE
Nov 2, 2019FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01300
DOB VIOLATION - ACTIVE
Aug 2, 2019FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01894
DOB VIOLATION - ACTIVE
May 2, 2019FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#03425
DOB VIOLATION - ACTIVE
Jan 3, 2017(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
#08726
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Feb 2, 2020Benchmarking - LL84 FTF-EN-BENCH
Active
Nov 2, 2019Benchmarking - LL84 FTF-EN-BENCH
Active
Aug 2, 2019Benchmarking - LL84 FTF-EN-BENCH
Active
May 2, 2019Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (22) · C 5 · B 17 · A 0
IssuedClassViolationCorrect by
Feb 9, 2026BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, NORTH AND WEST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTMar 16, 2026
Oct 23, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING AT CLOSET IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 27, 2025
Oct 23, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 27, 2025
Oct 23, 2025BApt 6B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK EAST WALL IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 27, 2025
Oct 23, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 27, 2025
Oct 23, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 27, 2025
Oct 23, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING AT CLOSET IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 27, 2025
Jul 14, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK CEILING WITHIN CLOSET IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTAug 18, 2025
Jul 14, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING WITHIN CLOSET IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTAug 18, 2025
Jul 14, 2025BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING WITHIN CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTAug 18, 2025
Aug 21, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING COMPACTOR CLOSET AT PUBLIC HALL, 6th STORYSep 25, 2024
Jul 9, 2024C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH (LABELED AS 6TH STORY) AT COMPACTOR CLOSET, 5th STORYJul 23, 2024
Jul 9, 2024B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE AT DOOR (LABELED AS 6TH STORY) AT COMPACTOR CLOSET, 5th STORYAug 13, 2024
May 28, 2024BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTJul 2, 2024
May 28, 2024BApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 6th STORY, 2nd APARTMENT FROM NORTH AT EASTJul 2, 2024
Jan 25, 2024BApt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 2 SQUARE AT CEILING, APPROX 2 SQUARE AT EAST WALL AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16250880 ISSUED 25-SEP-23 HAS BEEN UPGRADEDFeb 29, 2024
Sep 27, 2023CApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 3, 2023
Sep 27, 2023CApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 3, 2023
Sep 27, 2023CApt 6B · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 3, 2023
Sep 27, 2023BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 1, 2023
Sep 27, 2023BApt 6B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTNov 1, 2023
Sep 27, 2023CApt 6B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 SQUARE FEET AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6B, 5th STORY, 2nd APARTMENT FROM NORTH AT EASTOct 23, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 9:07 AM ET. BBL 4050247504.

Look up another building