Manhattan · Block 2115 · Lot 5 · 10032

3770 Broadway

10 floors · 74 apartments · 99,076 sq ft · built 1910 · class D7 · owner of record: 157 Broadway Associates,

19open violations
$5,000ECB/OATH penalties owed
3HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 70 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 86 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $336,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 122 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 99,076 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 191 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 191 days
Annual filing
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 435 days
Next cycle year 2027
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2115). Agency page

Dec 31, 2035
in 3357 days
Next due 2035
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-02 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $5,000 owed
IssuedViolationHearingBalance
Aug 26, 2026Construction CLASS - 1
FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39177464P ISSUED ON 02-17-2026 FOR WORK WITHOUT A PERMIT (NO PERMIT ON DOB FILE ), COMPLY WITH COMMISSIONER'S ORDER
#39201961N
Nov 5, 2026
PENDING
$2,500
Feb 17, 2026Construction CLASS - 1
DURING THE INSPECTION, IT WAS OBSERVED THAT THE AWNING'S STEEL FRAME HAD BEEN REMOVED, AND THERE WERE NO PERMANENT RECORDS OR PERMIT ON FILE FOR THE PLANNED REPLACEMENT WITH A DIFFERENT SIGN. THIS INDICATES WOR
#39177464P
May 21, 2026
IN VIOLATION
$0
Jan 13, 2026Elevators CLASS - 1
CEASE USE ITEMS: (1) DOOR ZONE RESTRICTOR INOPERATIVE. (2) ADJUST FLOOR STOPS AS NEEDED. REMEDY: RESTORE TO SERVICE IMMEDIATELY AND EMAIL THE ELEVATOR DIVISION AT EIR@BUILDINGS.NYC.GOV FOR A RE-INSPECTION. 97-X
#39173585N
Oct 13, 2026
$1,250
Nov 30, 2023Elevators CLASS - 1
ENTIRE DEVICE IS SHUT DOWN. NEED TO REPAIR AND RE-INSPECTION REQUIRED.
#39100449L
Feb 8, 2024
IN VIOLATION
$1,250
DOB (0)

None open.

DOB NOW Safety (2)
IssuedViolationStatus
Jul 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Report
Active
HPD (15) · C 3 · B 11 · A 1
IssuedClassViolationCorrect by
Sep 5, 2023BApt 24 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE BATHROOM FROM NORTH AT WEST LOCATED AT APT 24, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 10, 2023
Jan 9, 2023BApt 24 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTE LINE AT WASH BASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 24, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 13, 2023
Jan 9, 2023BApt 24 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE 3rd BATHROOM FROM EAST LOCATED AT APT 24, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 13, 2023
May 20, 2022AApt 24 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT HEAT RISER IN THE 4th ROOM FROM NORTH LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHAug 23, 2022
May 20, 2022BApt 24 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PORCELAIN ENAMEL FINISH BY METHOD OF REGLAZING AT WASH/BASIN IN THE 4th BATHROOM FROM NORTH LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 24, 2022
May 20, 2022BApt 24 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 24, 2022
May 20, 2022BApt 24 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 4th ROOM FROM NORTH LOCATED AT APT 24, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHJun 24, 2022
Jan 5, 2022BApt 26 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 26, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 9, 2022
Jan 5, 2022BApt 26 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 26, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTFeb 9, 2022
Jun 22, 2021CApt 40 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 40, 4th STORY, 5th APARTMENT FROM SOUTH AT WESTJul 18, 2021
Jun 22, 2021BApt 40 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE SPRING BALNCE AT LOWER SASH WINDOW IN THE 5th ROOM FROM EAST AT NORTH LOCATED AT APT 40, 4th STORY, 5th APARTMENT FROM SOUTH AT WESTJul 27, 2021
Jun 22, 2021CApt 40 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 40, 4th STORY, 5th APARTMENT FROM SOUTH AT WESTJul 18, 2021
Jun 22, 2021BApt 40 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 40, 4th STORY, 5th APARTMENT FROM SOUTH AT WESTJul 27, 2021
Mar 18, 2021CApt 40 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 40, 4th STORY, 5th APARTMENT FROM SOUTH AT WESTApr 13, 2021
Dec 10, 2020BApt 90 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING (APPROX 6 SQ.FT) NORTH WALL APPROX (2 SQ FT) AND WEST WALL (APPROX 4 SQ. FT.) IN THE 4th BATHROOM FROM NORTH LOCATED AT APT 90, 9th STORY, 5th APARTMENT FROM SOUTH AT WESTJan 14, 2021

Issued in the last 120 days

DateSourceWhatNow
Aug 26, 2026ECBConstruction: FAILURE TO SUBMIT CERTIFICATE OF CORRECTION OF VIOLATION #39177464P ISSUED ON 02-17-2026 FOR WORK WITHOUT A PERMIT (NO PERMIT ON DOB FILE ), COMPLY WITH COMMISSIONER'S ORDEROpen
Jul 30, 2026DOB SafetyAEUHAZ: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 2:08 PM ET. BBL 1021150005.

Look up another building