4 floors · 46 apartments · 41,798 sq ft · built 1930 · class C1 · owner of record: Aeb 9, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 41,798 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 14 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-17 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 11, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM NO ACCESS LOCKED DOOR AT BOILER ROOM | Sep 17, 2026 |
| Sep 10, 2026 | C | Apt B4 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT B4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 9, 2026 |
| Apr 23, 2026 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT BALCONY AT 1ST STACK FROM EAST AT NORTH AT FIRE ESCAPE, 3rd STORY | May 28, 2026 |
| Jul 10, 2025 | C | Apt B5 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THEN 10 SQUARE FEET AT THE CEILING IN THE BATHROOM LOCATED AT APT B5, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST ORIGINAL VIOLATION 17124562 ISSUED 15-JUL-24 HAS BEEN UPGRADED TO CLASS C P | Aug 5, 2025 |
| Jun 3, 2025 | C | 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, G | Jun 29, 2025 |
| May 20, 2025 | C | Apt A6 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT A6, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 3, 2025 |
| Mar 6, 2025 | B | Apt B21 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT B21, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''B'' ORIGINAL VIOLATION 17397448 ISSUED 04-NOV-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRAT | Apr 10, 2025 |
| Mar 5, 2025 | C | Apt B17 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT B17, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Mar 19, 2025 |
| Jan 16, 2025 | B | Apt A6 · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT A6, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Feb 20, 2025 |
| Jan 3, 2025 | C | Apt A6 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE FRAME-SWEEP IN THE ENTRANCE LOCATED AT APT A6, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 17, 2025 |
| Nov 13, 2024 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT B21, 4th STORY | Dec 7, 2024 |
| Nov 13, 2024 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT B21, 4th STORY, 2nd APARTMENT FROM SO | Dec 7, 2024 |
| Mar 13, 2024 | C | Apt B5 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH COUNTERBALANCE AT WINDOW AT EAST IN THE KITCHEN LOCATED AT APT B5, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Mar 19, 2024 |
| Mar 4, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Mar 10, 2024 |
| Feb 29, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT 1st CELLAR FROM NORTH AT WEST | Mar 6, 2024 |
| Feb 28, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Mar 5, 2024 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) BAS | Nov 23, 2023 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL, SOUTH WALL, EAST WALL, 1st WINDOW FRAME FROM E | Nov 23, 2023 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL, WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT B21, 4th STORY, 2nd APARTME | Nov 23, 2023 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM EAST AT SOUTH WALL, NORTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FRO | Nov 23, 2023 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) 2nd | Nov 23, 2023 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT A | Nov 23, 2023 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT 0.5MG/CM2 AND IS PRESUMED LEAD PAINT AS SET FORTH IN (28 RCNY §11-07(b)) AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE-USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(b)(2) CEI | Nov 23, 2023 |
| Oct 30, 2023 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM WEST AT NORTH WALL, WEST WALL IN THE BATHROOM LOCATED AT APT B21, | Nov 23, 2023 |
| Oct 30, 2023 | B | Apt B21 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 10 SQFT) EAST WALL IN THE BATHROOM LOCATED AT APT B21, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Dec 4, 2023 |
| Oct 30, 2023 | B | Apt B21 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 25 SQFT) CEILING IN THE BATHROOM LOCATED AT APT B21, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Dec 4, 2023 |
| Oct 30, 2023 | B | Apt B21 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT ( APPROXIMATELY 12 SQFT) SOUTH WALL IN THE BATHROOM LOCATED AT APT B21, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION ''WEST'' | Dec 4, 2023 |
| Aug 16, 2022 | B | Apt B18 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B18, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ' | Sep 20, 2022 |
| Aug 16, 2022 | B | Apt B9 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B9, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION '' | Sep 20, 2022 |
| Aug 15, 2022 | B | Apt A15 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A15, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ' | Sep 19, 2022 |
| Aug 15, 2022 | B | Apt A16 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A16, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 19, 2022 |
| Jul 28, 2022 | B | Apt A18 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A18, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ' | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt A12 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A12, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ' | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt B6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B6, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION '' | Sep 1, 2022 |
| Jul 28, 2022 | B | Apt B14 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B14, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ' | Sep 1, 2022 |
| Jul 7, 2022 | C | Apt B1 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 11, 2022 |
| Jul 7, 2022 | C | Apt B1 · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 11, 2022 |
| Jul 30, 2021 | B | Apt A15 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A15, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 3, 2021 |
| Jul 28, 2021 | B | Apt B10 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B10, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Sep 1, 2021 |
| Jul 28, 2021 | B | Apt B6 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B6, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 1, 2021 |
| Jun 30, 2021 | B | Apt B18 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B18, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 4, 2021 |
| Jun 30, 2021 | B | Apt B7 · § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B7, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 4, 2021 |
| Jun 30, 2021 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 4, 2021 |
| Jun 25, 2021 | C | Apt A2 · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jun 29, 2021 |
| Mar 3, 2021 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AT PUBLIC HALL, 1st STORY | Jun 6, 2021 |
| Oct 21, 2013 | C | Apt 5B · § 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER | Nov 18, 2013 |
| Sep 3, 2013 | C | Apt 5B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 5B, 1st STORY, 1st APARTMENT FROM | Oct 1, 2013 |
| Jun 3, 2011 | B | Apt B11 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRIC WIRES AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT B11, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jul 8, 2011 |
| Jan 3, 2011 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B | Feb 12, 2011 |
| Jan 3, 2011 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE KITCHEN LOCATED AT APT 3B, 1st STO | Feb 12, 2011 |
| Jan 3, 2011 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RISER FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST , 1 | Feb 12, 2011 |
| Jan 3, 2011 | C | Apt 3B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE BATHROOM LOCATED AT APT 3B, 1st STORY, 1st APARTMENT FROM SOUTH AT W | Feb 12, 2011 |
| Oct 1, 2008 | B | Apt A18 · § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ENTRANCE LOCATED AT APT A18, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION AT EAST | Nov 5, 2008 |
| Jan 29, 2008 | A | Apt B21 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE SPRING LOADED COUNTER BALANCES IN THE KITCHEN LOCATED AT APT B21, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 3, 2008 |
| Jan 29, 2008 | C | Apt B21 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) SOUTH WALL IN THE KITCHEN LOCATED AT APT B21, 4th STORY, 2nd APARTMENT FROM SOUTH AT W | Feb 24, 2008 |
| Nov 17, 1998 | C | Apt B1 · § 27-2013 ADM CODE REMOVE OR COVER IN A MANNER APPROVED BY THE DEPARTMENT THE PEELING LEAD PAINT WEST ROOM CEILING 1 STY NORTH APT B1 AT WEST SECTION RIVERA 437 2542 ER1 15989 , SECTION '' '' | Dec 7, 1998 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 11, 2026 | HPD C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM NO ACCESS LOCKED DOOR AT BOILER ROOM | Open |
| Sep 10, 2026 | HPD C | § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT B4, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 4:18 PM ET. BBL 3054180006.