2 floors · 39,450 sq ft · built 1931 · class Q1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-17 (Accepted). Agency page | Dec 31, 2026 in 47 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,450 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 10, 2025 | Construction CLASS - 1 3 STORY ST. MARY'S RECREATION CENTER PARKS DEPARTMENT BUILDING OBSERVED SUPPORT OF EXCAVATION WORK AT EXP#3. EXCAVATED AREA MORE THAN 10 FEET IN DEPTH PILES LAGGING & SHORING. UPON RESEARCH ON BIS/DOB NOW & CRM #39542311R | Sep 19, 2025 ADMIT/IN-VIO | $0 |
| Jul 10, 2025 | Construction CLASS - 2 3 STORY ST. MARY'S RECREATION CENTER PARKS DEPARTMENT BUILDING OBSERVED SUPPORT OF EXCAVATION WORK AT EXP#3. CONSTRUCTION SUPER ONSITE SITE SAFETY JOBSITE PERMIT#X01206566. UPON REQUEST FOR SITE SAFETY PLANS ON #39542312Z | Sep 19, 2025 ADMIT/IN-VIO | $0 |
| Sep 16, 2022 | Unknown CLASS - 2 FAILURE TO PROVIDE SUPER LOGS FAILURE TO DESIGNATE COMPETENT PERSON #39506423N | Nov 4, 2022 ADMIT/IN-VIO | $0 |
| Oct 9, 2021 | Construction CLASS - 1 AN UNLAWFUL ACT-FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.FAILURE TO CORRECT AND CERTIFY SUMMONS NUMBERS#35360017N,35360018P,AND 35547840J.REMEDY:COMPLY WITH EC CODE. #35584094J | Jan 7, 2022 DEFAULT | $12,500 |
| May 5, 2021 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER. RECORD INDICATE NO APPLICATION WAS MADE TO CERTIFY AND CORRECT ECB #'S 35360018P & 35360017N. REMEDY: COMPLY WITH COMMISSIONERS ORDERS #35547840J | Jul 30, 2021 POP/IN-VIO | $0 |
| Nov 22, 2019 | Unknown CLASS - 1 UNAPPROVED,UNSAFE,UNSUITABLE ELECTRICAL EQUIPMENT APPARATUS,MATERIALS,DEVICES,OR WIRING IN USE.BASEMENT ELECTRICAL ROOM:DEFECTIVE ENTRANCE CONDUCTOR,WINDOW SERVICE,ENTRANCE THROUGH Q/M TEMPORARY WIRING AND NOT #35360017N | Feb 21, 2020 POP/IN-VIO | $0 |
| Nov 22, 2019 | Unknown CLASS - 1 FAILURE TO PROPERLY BOND ELECTRICAL SYSTEMS.BASEMENT ELECTRICAL ROOM.1200 AVE SERVICE ENTRANCE CONDUCTORS ARE NOT BINDEE, AND GROUNDED."PLEASE NOTE"THIS IS NOT A FINAL INSPECTION!!REMEDY:PROVIDE PROPER BONDING. #35360018P | Feb 21, 2020 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07854 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #07035 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #34615 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #14415 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #09260 | DOB VIOLATION - ACTIVE |
| Oct 29, 2019 | CONSTRUCTION #CN0101AJ | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 12:16 AM ET. BBL 2025570001.