6 floors · 96 apartments · 86,000 sq ft · built 1941 · class D1 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 69 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 86,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1438). Agency page | Dec 31, 2028 in 800 days | Next due 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 16, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009328-10B-001. NOTED: THERE IS NO ADEQUATE SAFETY MEASURES AT ALL EXPOSURES. REMEDY: PROVI #35730945L | Sep 28, 2026 POP/IN-VIO | $0 |
| Sep 16, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009329-10B-001. NOTED: AS PER REPORT SAFETY NEEDS TO BE INSTALLED: OBSERVED, NO ADEQUATE SA #35730944J | Sep 28, 2026 POP/IN-VIO | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL ABD APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909329. REMEDY: SUBMIT ACCEPTABLE REQU #37027324R | May 6, 2024 POP/IN-VIO | $0 |
| Apr 11, 2024 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT CRITICAL OF EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL ABD APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909328. REMEDY: SUBMIT ACCEPTABLE REQU #37027325Z | May 6, 2024 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00456 | DOB VIOLATION - ACTIVE |
| Feb 22, 2023 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 #00455 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST #00294 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #00434 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NYCHA ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00173 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NYCHA ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00175 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NYCHA ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00174 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
| Feb 22, 2023 | Facades FISPNRF CYCLE 9B NO REPORT FILED | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 16, 2026 | ECB | Construction: FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009328-10B-001. NOTED: THERE IS NO ADEQUATE SAFETY MEASURES AT ALL EXPOSURES. REMEDY: PROVI | Open |
| Sep 16, 2026 | ECB | Construction: FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT DESIGNATED UNSAFE FACADE AS PER TECHNICAL REPORT UNSAFE-1009329-10B-001. NOTED: AS PER REPORT SAFETY NEEDS TO BE INSTALLED: OBSERVED, NO ADEQUATE SA | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 1:04 PM ET. BBL 3014380001.