Brooklyn · Block 3594 · Lot 7 · 11212

373 East 98 Street

2 floors · 2 apartments · 2,792 sq ft · built 1901 · class S2 · owner of record: Happy999realty, Llc

15open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
44dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 16 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 44 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 44 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-16 (Accepted). Agency page

Dec 31, 2026
in 44 days
1 of 2 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 288 days
Registered through 2027-09-01

Open violations

ECB / OATH (0)

None open.

DOB (4)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#21040
DOB VIOLATION - ACTIVE
Feb 13, 2004LOCAL LAW 62/91 - BOILERS

#19534
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#19662
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#19663
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (10) · C 6 · B 4 · A 0
IssuedClassViolationCorrect by
Feb 13, 2026BApt 1B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 20, 2026
Feb 13, 2026CApt 1B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30SQ FEET OF MOLD AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 11, 2026
Feb 13, 2026BApt 1B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 20, 2026
Feb 13, 2026BApt 1B · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 20, 2026
Feb 13, 2026BApt 1B · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 20, 2026
Feb 6, 2026CApt 1B · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 6, 2026
Feb 6, 2026CApt 1B · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTFeb 6, 2026
Feb 3, 2026CApt 1B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ FT AT CEILING IN THE BATHROOM LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTMar 1, 2026
Jan 30, 2026CApt 1B · § 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 30, 2026
Jan 30, 2026CApt 1B · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJan 30, 2026

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 17, 2026, 12:26 PM ET. BBL 3035940007.

Look up another building