class V0 · owner of record: 3728 Bronx Blvd Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 25, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF A 6-STORY PROPOSED NEW BUILDING, I OBSERVED NEEDLE-BEAN BEEN INSTALLED EXPOSURE#4 FOR OVERHEAD PROTECTION FOR FRONT PORCH AT THE ADDRESS 3722 BRONX BLVD, I RESEARCH THE DEPARTMENTS #39559652X | Dec 4, 2026 PENDING | $1,250 |
| Sep 24, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OF A 6-STORY NEW BUILDING UNDER CONSTRUCTION, I OBSERVED THROUGHOUT INTERIOR ON FLOORS FROM 1ST TO 6TH FLOOR INADEQUATE HOUSEKEEPING, CREATING AN HAZARDOUS CONDITION FOR SLIP, TRIP AND #39559619Y | Dec 4, 2026 PENDING | $1,250 |
| Sep 24, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF THE 6-STORY NEW BUILDING AT ROOF LEVEL, I OBSERVED THAT EXPOSURE #4, ADJACENT TO 3722 BRONX BOULEVARD, HAD AN UNPROTECTED FRONT PORCH WITH NO REQUIRED OVERHEAD PROTECTION. THE CONDI #39559621N | Dec 4, 2026 PENDING | $5,000 |
| Sep 24, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF 6-STORY PROPOSED NEW BUILDING, I OBSERVED THROUGHOUT THE JOBSITE INADEQUATE VERTICAL DEBRIS NETTING AND GUARDRAILS NOT AS PER CODE 3308.5 THE NETTING WAS OBSERVED LOOSE AND FLYING A #39559620L | Dec 4, 2026 PENDING | $2,500 |
| Jul 26, 2026 | Construction CLASS - 2 SUMMONS ISSUED FOR FAILURE TO SAFEGUARD DUE TO DAMAGE TO EXPOSURE 2 EXTERIOR WALL OF 3722 BRONX BLVD DURING CONSTRUCTION OPERATIONS. PARTIAL STOP WORK ORDER ISSUED FOR ALL WORK AT EXPOSURE #2 EXTERIOR WALL OF J #39197652K | Oct 2, 2026 DEFAULT | $5,030 |
| Jul 8, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION OF A 6-STORY PROPOSED NEW BUILDING AT FOUNDATION PHASE, ACTIVE SITE I OBSERVED CONCRETE FORM IN PLACE CLOSE TO ADJACENT PROPERTY 3728 BRONX BOULEVARD BRONX. UPON REQUEST, STRUCTURAL ST #39556348H | Sep 18, 2026 DEFAULT | $2,530 |
| Jul 8, 2026 | Unknown CLASS - 2 AT THE TIME OF MY INSPECTION, I OBSERVED SIDEWALK CLOSED AND OBSTRUCTED WITH PLASTIC JERSEY BARRIERS EXPOSURE#1. UPON RESEARCH DOT WEBSITE RECORDS REVEAL THERE WERE NO PERMITS OBTAIN OR POSTED ON CONSTRUCTION F #39556345M | Sep 18, 2026 DEFAULT | $2,530 |
| Jul 8, 2026 | Construction CLASS - 1 AT THE TIME OF INSPECTION OF A 6-STORY PROPOSED NEW BUILDING AT FOUNDATION PHASE, I OBSERVED AT EXPOSURE #3 WHERE WORKERS ARE INSTALLING REBAR ON PLATFORM APPROX. 7 FEET ABOVE GROUND LEVEL NO GUARDRAILS WERE PR #39556347X | Sep 18, 2026 DEFAULT | $5,030 |
| Jul 8, 2026 | Unknown CLASS - 2 AT TIME INSPECTION OF 6-STORY PROPOSED NEW BUILDING, ACTIVE SITE DURING MY INSPECTION I OBSERVED GAS GENERATOR INSIDE OF JOBSITE, UPON REQUESTING COMPETENT PERSON ONSITE FOR FDNY PERMIT NONE WAS MADE AVAILABLE #39556346Y | Sep 18, 2026 DEFAULT | $2,530 |
| Jun 24, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, PROPOSED 6-STORY BUILDING IN FOUNDATION PHASE OBSERVED WITH EARTHWORK OPERATIONS. CONTRACTOR PROVIDED DEMOLITION NOTIFICATION; HOWEVER, NO EARTHWORK NOTIFICATION COULD BE VERIFIED IN DOB #39555851K | Mar 19, 2027 | $2,500 |
| Apr 29, 2026 | Site Safety CLASS - 1 AT THE TIME OF INSPECTION FOR A 6-STORY PROPOSED NEW BUILDING, SITE DRILLING STRUCTURAL PILES UPON REQUESTING COMPETENT ONSITE FOR PRE CONSTRUCTION, OPTICAL MONITORING, VIBRATION MONITORING, AND NO APPROVE SITE #39553601Z | Dec 4, 2026 | $2,500 |
| Nov 7, 2025 | Unknown CLASS - 1 3301.1.1 RESPONSIBILITY FOR SAFETY. ACTIVE JOB SITE UNDER DEMOLITION. UPON REQUEST TO GAIN ACCESS INTO JOBSITE FOR COMPLIANCE INSPECTION, NO SAFE MEANS OF ACCESS/ INGRESS PROVIDE, NO TREE PROTECTION EXPOSURE 1, #39546773J | Apr 15, 2027 DEFAULT | $5,000 |
| Nov 7, 2025 | Construction CLASS - 1 ACTIVE JOB SITE UNDER FULL DEMOLITION PHASE, I OBSERVE WATER HOLES CONNECTED AND USE OF EXISTING WATER HYDRANT TO SPRAY WATER ON SITE FOR DUST CONTROL PURPOSES. UPON REQUEST FOR ACTIVE ISSUED DEP AUTHORIZATION #39546771X | Apr 15, 2027 DEFAULT | $6,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A 6-STORY PROPOSED NEW BUILDING, I OBSERVED NEEDLE-BEAN BEEN INSTALLED EXPOSURE#4 FOR OVERHEAD PROTECTION FOR FRONT PORCH AT THE ADDRESS 3722 BRONX BLVD, I RESEARCH THE DEPARTMENTS | Open |
| Sep 24, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OF A 6-STORY NEW BUILDING UNDER CONSTRUCTION, I OBSERVED THROUGHOUT INTERIOR ON FLOORS FROM 1ST TO 6TH FLOOR INADEQUATE HOUSEKEEPING, CREATING AN HAZARDOUS CONDITION FOR SLIP, TRIP AND | Open |
| Sep 24, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF THE 6-STORY NEW BUILDING AT ROOF LEVEL, I OBSERVED THAT EXPOSURE #4, ADJACENT TO 3722 BRONX BOULEVARD, HAD AN UNPROTECTED FRONT PORCH WITH NO REQUIRED OVERHEAD PROTECTION. THE CONDI | Open |
| Sep 24, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF 6-STORY PROPOSED NEW BUILDING, I OBSERVED THROUGHOUT THE JOBSITE INADEQUATE VERTICAL DEBRIS NETTING AND GUARDRAILS NOT AS PER CODE 3308.5 THE NETTING WAS OBSERVED LOOSE AND FLYING A | Open |
| Jul 26, 2026 | ECB | Construction: SUMMONS ISSUED FOR FAILURE TO SAFEGUARD DUE TO DAMAGE TO EXPOSURE 2 EXTERIOR WALL OF 3722 BRONX BLVD DURING CONSTRUCTION OPERATIONS. PARTIAL STOP WORK ORDER ISSUED FOR ALL WORK AT EXPOSURE #2 EXTERIOR WALL OF J | Closed |
| Jul 8, 2026 | ECB | Unknown: AT THE TIME OF INSPECTION OF A 6-STORY PROPOSED NEW BUILDING AT FOUNDATION PHASE, ACTIVE SITE I OBSERVED CONCRETE FORM IN PLACE CLOSE TO ADJACENT PROPERTY 3728 BRONX BOULEVARD BRONX. UPON REQUEST, STRUCTURAL ST | Closed |
| Jul 8, 2026 | ECB | Unknown: AT THE TIME OF MY INSPECTION, I OBSERVED SIDEWALK CLOSED AND OBSTRUCTED WITH PLASTIC JERSEY BARRIERS EXPOSURE#1. UPON RESEARCH DOT WEBSITE RECORDS REVEAL THERE WERE NO PERMITS OBTAIN OR POSTED ON CONSTRUCTION F | Closed |
| Jul 8, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OF A 6-STORY PROPOSED NEW BUILDING AT FOUNDATION PHASE, I OBSERVED AT EXPOSURE #3 WHERE WORKERS ARE INSTALLING REBAR ON PLATFORM APPROX. 7 FEET ABOVE GROUND LEVEL NO GUARDRAILS WERE PR | Closed |
| Jul 8, 2026 | ECB | Unknown: AT TIME INSPECTION OF 6-STORY PROPOSED NEW BUILDING, ACTIVE SITE DURING MY INSPECTION I OBSERVED GAS GENERATOR INSIDE OF JOBSITE, UPON REQUESTING COMPETENT PERSON ONSITE FOR FDNY PERMIT NONE WAS MADE AVAILABLE | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 7:50 PM ET. BBL 2046490013.