1 floors · 7,020 sq ft · built 1925 · class K1 · owner of record: Crown-Kingston Realty Associates Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 58 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-30 (Accepted). Agency page | Dec 31, 2026 in 58 days | 1 of 2 without an accepted 2026 report yet |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 20, 2019 | Boilers CLASS - 2 B254,50A,50B,50C,50D,50E. FULTON V.T. BLK, 10HP, NB88518HP STM OIL FIRED BLT2001. 50A-WARPED AND DEFORMED FLUE PIPE TO CHIMNEY BASE. REPALCE50B-ADVANCED CORROSION AND LEAKAGE AT FEED WATER INLET NOZZLE.REPAIR #32098684R | Jul 17, 2020 IN VIOLATION | $625 |
| Oct 30, 2009 | Boilers CLASS - 2 18A/ 18B/ 50A/ 34/ 50A BOILER ROOM DOOR NOT FIRE PROOF #32067248Z | Jan 11, 2010 WRITTEN OFF | $0 |
| Mar 11, 2008 | Boilers Non-Hazardous 50A,B. FULTON V.T. BOILER, 10HP, NB 88518, OIL, 2001. 50A SECTION OF FEED WATER INLET LINE CORRODED. REPLACE DEFECTIVE AND ASSOCIATED FITTINGS. 50B. COPPER SWEAT FIT PIPING INSTALLED ON SAFETY VALVE DISCHARGE #32055997H | May 5, 2008 IN VIOLATION | $0 |
| Oct 19, 2007 | Boilers Non-Hazardous BQ9,B4B,16,38,51,50,50A,51A. 51 MISSING FRESH AIR FOR BOILER ROOM 51A FOUND WEIL MCLAIN BOILER 305,000 BTU'S IN BASEMENT WORK W/O A PERMIT. 50. RETURN LINES AT BOILER CORRIDED. 50A HOLES IN CEILING AND WALLS #32052540Y | Dec 17, 2007 IN VIOLATION | $0 |
| Aug 11, 2006 | Boilers Hazardous 1/40/50A/B/C 50A-SAFETY VALVES DISCHARGE PIPE DOWN. 50B-NO METAL FIRE DOOR. 50C-NO KEY TO BOILER IN BASEMENT. #32050173M | Sep 25, 2006 WRITTEN OFF | $0 |
| Aug 9, 2006 | Boilers Non-Hazardous CEASE USE 3C/40/51/50A/50B 2001 FULTON NB 88518. 50A-PIPE SAFETY VALVEDISCHARGE TO A SAFE POINT. 50B-NO METAL FIRE DOOR. #32050169J | Sep 25, 2006 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #03620 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #02492 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #01241 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #00095 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #02322 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00483 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01634 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #19557 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #19011 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #18646 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #18490 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #19691 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #14741 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #15918 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for HP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for HP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2023 Internal Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)