17 floors · 78 apartments · 62,499 sq ft · built 2025 · class D7 · owner of record: 372 Livingston Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 43 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 59 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 62,499 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 164 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 164 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 167). Agency page | Dec 31, 2027 in 408 days | Next due 2027 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 460 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1139 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED MULTIPLE SCAFFOLDS INSTALLED AND READY TO USE. SPIDER FRAMES HAVE TWO CROSS BRACES CONTRARY TO MANUFACTURES SPECS WHICH REQUIRE 3. ALSO OBSERVED PLATFORMS NOT CONFORMING WITH CANT #39559604L | Dec 2, 2026 PENDING | $1,250 |
| Sep 24, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED MULTIPLE SUSPENDED SCAFFOLDS INSTALLED AND READY TO USE. UPON REVIEWING APPROVED DRAWINGS NOTICE WORK NOT CONFORMING. TIEBACKS ARE NOT INSTALLED STRAIGHT BACK HAVING UNITS IN BETW #39559603J | Dec 2, 2026 PENDING | $1,250 |
| Mar 10, 2026 | Construction CLASS - 2 ON ACTIVE JOB SITE. GC-612632 WALKING FROM ROOF TO 17 FL. OBSERVED: OPEN HOLES THROUGHOUT, INADEQUATE COVER, PARTIALLY COVER WITH PLYWOOD UNATTACHED TO CONCRETE SLAB, NO WARNING SIGN NO CONTROL ACCESS ZONE. CRE #39551503X | Dec 3, 2026 | $5,000 |
| Jan 15, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION, OBSERVED WORKER ON LEADING EDGE WITHOUT FALL PROTECTION; HARNESS AND SRL PRESENT BUT NOT ANCHORED. CONTRARY TO BC 3301.2, FAILURE TO SAFEGUARD WORKERS CREATED AN IMMEDIATE FALL HAZARD.STO #39549234Y | Nov 2, 2026 | $10,000 |
| Aug 14, 2025 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A ACTIVE JOB SITE WITH MATERIAL DELIVERY AT EXPOSURE 1, I OBSERVED WORKERS WERE WORKING AGAINST THE POSTED STOP WORK ORDER UNDER COMPLAINT # 3A25457 ISSUED ON 08-13-2025 CREATIN #39543682K | Jun 17, 2027 | $12,500 |
| Aug 13, 2025 | Unknown CLASS - 2 BC 3307.2.1 AT THE TIME OF MY INSPECTION I OBSERVED SIDEWALK CLOSED AND CONSTRUCTION OPERATIONS WERE ENCROACHING ONTO ADJACENT PROPERTY AT EXPOSURE (1). REVIEW OF DOT DOCUMENTS REVEAL THAT THERE WERE NO PER #39543637L | Jun 17, 2027 | $5,000 |
| Aug 13, 2025 | Construction CLASS - 1 AT TIME OF MY INSPECTION OF A 24 STORY BUILDING CONSTRUCTION IN PROGRESS , OBSERVED THAT PEDESTRIAN PROTECTION (BARRIERS)AND 5 FEET WALKWAY WAS NOT MAINTAINED AS PER APPROVED SAFETY PLANS. FAILURE TO COMPLY WIT #39543636J | Jun 17, 2027 | $6,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 24, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED MULTIPLE SCAFFOLDS INSTALLED AND READY TO USE. SPIDER FRAMES HAVE TWO CROSS BRACES CONTRARY TO MANUFACTURES SPECS WHICH REQUIRE 3. ALSO OBSERVED PLATFORMS NOT CONFORMING WITH CANT | Open |
| Sep 24, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED MULTIPLE SUSPENDED SCAFFOLDS INSTALLED AND READY TO USE. UPON REVIEWING APPROVED DRAWINGS NOTICE WORK NOT CONFORMING. TIEBACKS ARE NOT INSTALLED STRAIGHT BACK HAVING UNITS IN BETW | Open |
| Jul 27, 2026 | ECB | Construction: AT TIME OF INSPECTION, RESPONDED TO A REPORTED INCIDENT WHERE A WORKERFELL FROM A LADDER. BASED ON THE SITE INVESTIGATION, THE WORKER FAILEDTO MAINTAIN THREE POINTS OF CONTACT WHILE PERFORMING ELECTRICAL WORK. | Closed |