17 floors · 173 apartments · 209,819 sq ft · built 1970 · class D3 · owner of record: Oub Court Housing Company, Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2020-10-01 (Accepted). Agency page | Dec 31, 2026 in 65 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $1,390,740 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 117 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 209,819 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 186 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 186 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 796 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2269). Agency page | Dec 31, 2029 in 1161 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE CYCLE 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITION DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #807422. REMEDY: FILE ACCEPTABLE REPORT. #37036873Y | Mar 12, 2027 PENDING | $1,250 |
| Jan 6, 2025 | Elevators CLASS - 1 CLASS 1 RTS. DEVICE IN A 2 ELEVATOR BANK IN 17 STORY BUILDING OUT OF SERVICE. THIS CONDITION AFFECTS NUMEROUS TENANTS, INCLUDING THOSE WITHSPECIAL NEEDS, THEREBY CREATING A CONDITION DANGEROUS TO HUMAN LIFE. #39134557Y | Sep 30, 2025 IN VIOLATION | $3,125 |
| Nov 25, 2024 | Elevators CLASS - 1 CLASS 1 RTS. DEVICE IN A 2 ELEVATOR BANK IN 17 STORY BUILDING OUT OF SERVICE. THIS CONDITION AFFECTS NUMEROUS TENANTS, INCLUDING THOSE WITH SPECIAL NEEDS, THEREBY CREATING A CONDITION DANGEROUS TO HUMAN LIFE. #39131252J | Jun 16, 2025 IN VIOLATION | $1,250 |
| May 15, 2024 | Elevators CLASS - 2 CLASS 2: UPON INSPECTION FOUND DEVICE TO BE OUT OF SERVICE. THIS IS A RECURRING CONDITION. RESTORE TO SERVICE REPAIR IMMEIDATELY AS PER 1RCNY 11-02. WHEN SERVICE RESTORED CONTACT NYCDOB AT EIR@BUILDINGS.NYC.GOV #39114430Z | Jan 28, 2025 IN VIOLATION | $625 |
| Dec 9, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#907422.REM:SUBMIT ACCEPTABLE REQUIRED T #37025120X | May 5, 2023 IN VIOLATION | $0 |
| Aug 11, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG EXTERIOR WALLS OR APPURTENANCES.NOTE:AT TIME OF INSPECTION,OBSERVED DEFECTIVE BRICKWORK ON EXP.#1 WEST ELEVATION(BROOK AVE.)EXP.#4 SOUTH ELEVATION(E.142 STREET),& EXP.#3 EAST ELEVATION #35664086J | Mar 13, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05531 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05530 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05348 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05349 | DOB VIOLATION - ACTIVE |
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00595 | DOB VIOLATION - ACTIVE |
| Dec 1, 2023 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2300550 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #30388 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #30387 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08249 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #08248 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08199 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08198 | DOB VIOLATION - ACTIVE |
| Aug 21, 2022 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) #00303 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #00779 | DOB VIOLATION - ACTIVE |
| Jun 20, 2021 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020 #10210 | DOB VIOLATION - ACTIVE |
| Jan 8, 2020 | ELEVATOR #9028/667650 | DOB VIOLATION - ACTIVE |
| Jan 8, 2020 | ELEVATOR #9028/667651 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #10572 | DOB VIOLATION - ACTIVE |
| Feb 21, 2017 | FACADE SAFETY PROGRAM #HAZ86685 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #13148 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Dec 1, 2023 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Aug 21, 2022 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Jun 20, 2021 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Feb 21, 2017 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 26, 2025 | I | § 27-2091(C) ADM CODE THE PROPERTY HAS BEEN ISSUED AN ORDER TO IDENTIFY AND ADDRESS UNDERLYING CONDITIONS AND VIOLATIONS RELATED TO THE ORDER. FAILURE TO COMPLY MAY RESULT IN EXTENSIVE REPAIR WORK TO CORRECT UNDERLYING CONDITIONS AND RELATED VIOLATIONS BY HPD. CHARGES FOR REPAIR WORK DONE PURSUANT T | — |
| Feb 2, 2026 | I | §27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL | — |
| Aug 7, 2026 | B | Apt 8C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ. FT AT CEILING IN THE BATHROOM LOCATED AT APT 8C, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 11, 2026 |
| Aug 6, 2026 | C | Apt 5D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Sep 1, 2026 |
| Aug 6, 2026 | B | Apt 15H · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 15H, 15th STORY | Sep 10, 2026 |
| Jul 27, 2026 | A | Apt BLDG · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT BLDG, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 30, 2026 |
| Jul 27, 2026 | B | Apt BLDG · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT BLDG, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 31, 2026 |
| Jul 27, 2026 | B | Apt BLDG · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING OF WEST BATHROOM IN THE BATHROOM LOCATED AT APT BLDG, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Aug 31, 2026 |
| Jul 24, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE EAST BOILER UNIT AT CELLAR | Jul 30, 2026 |
| Jul 24, 2026 | B | Apt 5E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE SINK CABINET IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 28, 2026 |
| Jul 24, 2026 | B | Apt 5E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Aug 28, 2026 |
| Jul 24, 2026 | C | Apt 1F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, APARTMENT AT SOUTH | Jul 30, 2026 |
| Jul 24, 2026 | B | Apt 1F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, APARTMENT AT SOUTH | Aug 28, 2026 |
| Jul 24, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE WEST BOILER UNIT AT CELLAR | Jul 30, 2026 |
| Jul 24, 2026 | B | Apt 1F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGG IN THE PRIVATE HALLWAY LOCATED AT APT 1F, 1st STORY, APARTMENT AT SOUTH | Aug 28, 2026 |
| Jun 29, 2026 | B | Apt 16B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 16B, 16th STORY, 4th APARTMENT FROM NORTH AT EAST | Aug 3, 2026 |
| Jun 5, 2026 | C | Apt 2E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE 2nd BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 11, 2026 |
| Jun 5, 2026 | C | Apt 2E · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 2nd BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 11, 2026 |
| Mar 12, 2026 | C | Apt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FT AT CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18500742 ISSUED 09-DEC-25 HAS BEEN UPGRADED TO CLASS C PER ADMINISTRA | Apr 7, 2026 |
| Dec 9, 2025 | B | Apt 7E · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET ..... IN THE ENTIRE APARTMENT LOCATED AT APT 7E, 7th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jan 13, 2026 |
| Oct 28, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 31, 2026 |
| Oct 28, 2025 | A | Apt 6A · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st DOOR FRAME FROM NORTH AT EAST WALL IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 31, 2026 |
| Sep 4, 2025 | B | Apt 3F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC GLAZE AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Oct 9, 2025 |
| Sep 4, 2025 | B | Apt 5F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC GLAZE AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 5F, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Oct 9, 2025 |
| Aug 21, 2025 | A | Apt 4E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Nov 24, 2025 |
| Aug 21, 2025 | B | Apt 4E · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAT 10 SQ FEET AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 25, 2025 |
| Aug 21, 2025 | B | Apt 4E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULKING AT BATHTUB IN THE 1st BATHROOM FROM EAST LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 25, 2025 |
| Aug 21, 2025 | B | Apt 4E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT SWITCH AT SOUTH WALL IN THE 1st BATHROOM FROM EAST LOCATED AT APT 4E, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 25, 2025 |
| Aug 18, 2025 | B | Apt 2C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FEET AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 4H · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 4H · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 4H · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 4H, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 22, 2025 |
| Aug 18, 2025 | A | Apt 5E · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Nov 21, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE DOORKNOB AT 1ST CLOSET FROM WEST AT NORTH IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 6th ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 HMC: REFIT CLOSET DOOR AT NORTH IN THE 6th ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 6H · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 6H, 6th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 3A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ FEET AT CEILING AND EAST WALL IN THE BATHROOM LOCATED AT APT 3A, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SILICONE CAULKING AT SINK IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR AT 2ND CLOSET FROM WEST AT NORTH IN THE PRIVATE HALLWAY LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 HMC: REFIT CLOSET DOOR IN THE FOYER LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 18, 2025 | B | Apt 5E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 6th ROOM FROM EAST LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Sep 22, 2025 |
| Aug 12, 2025 | B | § 27-2005 HMC: REFIT WEST FIRE EXIT DOOR AT PUBLIC HALL, 3rd STORY | Sep 16, 2025 |
| Aug 12, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT WEST FIRE EXIT DOOR AT PUBLIC HALL, 3rd STORY | Sep 16, 2025 |
| Aug 8, 2025 | B | Apt 2G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 2nd BATHROOM FROM EAST LOCATED AT APT 2G, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 12, 2025 |
| Aug 8, 2025 | B | Apt 3H · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH BASIN IN THE 1st BATHROOM FROM EAST LOCATED AT APT 3H, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 12, 2025 |
| Aug 7, 2025 | C | Apt 2A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 30 SQ. FT. AT CEILING, NORTH WALL, EAST WALL, AND WEST WALL IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Sep 2, 2025 |
| Aug 7, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 10, 2025 |
| Aug 7, 2025 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 2nd BATHROOM FROM NORTH, THE 4th ROOM FROM NORTH, THE 1st BATHROOM FROM NORTH, THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Nov 10, 2025 |
| Jul 14, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Jul 14, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE SOUTH WALL IN THE FOYER LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Jul 14, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE KITCHEN LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Jul 14, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE 6th ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Jul 14, 2025 | A | Apt 6A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, EAST WALL, WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Jun 16, 2025 | B | Apt 2H · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT GEILING LESS THAN 10 SQ. FT. IN THE BATHROOM LOCATED AT APT 2H, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17668969 ISSUED 30-JAN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-20 | Jul 21, 2025 |
| Jun 2, 2025 | B | Apt 4F · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTER TOP AT BASE SINK CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 4F, 4th STORY, 4th APARTMENT FROM EAST AT SOUTH | Jul 7, 2025 |
Showing 60 of 159. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 7, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQ. FT AT CEILING IN THE BATHROOM LOCATED AT APT 8C, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST | Open |
| Aug 6, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Open |
| Aug 6, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 15H, 15th STORY | Open |
| Jul 27, 2026 | HPD A | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING IN THE BATHROOM LOCATED AT APT BLDG, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Jul 27, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT BLDG, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Jul 27, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING OF WEST BATHROOM IN THE BATHROOM LOCATED AT APT BLDG, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
| Jul 24, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE EAST BOILER UNIT AT CELLAR | Open |
| Jul 24, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE SINK CABINET IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Open |
| Jul 24, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Open |
| Jul 24, 2026 | HPD C | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND AND ALL WALLS IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, APARTMENT AT SOUTH | Open |
| Jul 24, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, APARTMENT AT SOUTH | Open |
| Jul 24, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE THE WEST BOILER UNIT AT CELLAR | Open |
| Jul 24, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILINGG IN THE PRIVATE HALLWAY LOCATED AT APT 1F, 1st STORY, APARTMENT AT SOUTH | Open |
| Jul 24, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE 2nd BATHROOM FROM NORTH LOCATED AT APT 1F, 1st STORY, APARTMENT AT SOUTH | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 1:40 AM ET. BBL 2022690001.