3 floors · 82,000 sq ft · built 1948 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-18 (Accepted). Agency page | Dec 31, 2026 in 62 days | 2 of 2 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 82,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 363). Agency page | Dec 31, 2033 in 2619 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 5, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. AT THE TIME OF INSPECTION NOTED APPROX 75% EMERGENCY LIGHTS NOT WORKING #35727104J | Feb 17, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 EXTERIOR DOOR NOT SELF-CLOSING. AT THE TIME OF INSPECTION NOTED: EXTERIOR EXIT DOORS #9, #10 AND MAIN ENTRY DOOR(FROM 13 STREET) NOT SELF-CLOSING. REISSUE #35691827L-CLASS 2. REMEDY: REPAIR AND/OR REPLACE DOOR. #35727105L | Feb 13, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION NOTED: FPSC SMOKE DOORS #9, 11, AND 2 NOT CLOSING; CLASSROOM; #206, 208; 209, 215, 216 DOORS NOT SELF CLOSING. REISSUE ECB 356918 #35727106N | Feb 13, 2026 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 REISSUE #35663196X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED INTERIOR FPSC SMOKE DOORS NOT CLOSING AT 3RD FL CORRIDOR BYRM #318, 2ND FL RM #204 EXIT #, 6, 9, 11 ON 1ST FL AND BASEMENT LEVEL #35691826J | Apr 29, 2025 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING NOTED:EXTERIOR DOORS AT EXIT#9 & 10 AND STAIR B BULKHEAD ROOF ACCESS,NOT OPENING OR CLOSING PROPERLY.REM:REPAIR/REPLACE DOOR. #35691827L | May 20, 2025 POP/IN-VIO | $0 |
| Mar 10, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED THROUGHOUT SCHOOL APPROX.75% EMERGENCY LIGHTS NOT WORKING WHEN TESTED. #35691828N | May 20, 2025 POP/IN-VIO | $0 |
| Dec 21, 2024 | Construction CLASS - 2 OBSERVED CONSTRUCTION FENCE ERECTED UNDER ACTIVE PERMIT #Q08009628, HAS APPROXIMATELY 40 LINEAR FEET OF FENCE BLOWN OVER AND RESTING ON K-RAILS AT EXP.1 (FRONT OF BUILDING), COMPLY WITH CODE; REPAIR AND/OR REPL #39133505H | Feb 25, 2025 DEFAULT | $5,000 |
| Feb 12, 2024 | Construction CLASS - 2 FAILURE TO PROVIDE POWER FOR EMERGENCY EXIT LIGHTING EMERGENCY LIGHTING NOT WORKING WHEN TESTED NO POWER MAYBE THE BATTERY.UNITS BY STAIRCASE C & STAIRCASE A EXIT 2,STAIRCASE B,AND THE ONES ONSTAGES.REM:PROVIDE #35678675P | Apr 22, 2024 POP/IN-VIO | $0 |
| Jan 24, 2023 | Construction CLASS - 2 REISSUE #35644389Z EXIT DOOR NOT SELF CLOSING:SMOKE DOORS BY EXIT #3, EXIT #6, #9, #11, BASEMENT B 17 & SMOKE DOORS BY EXIT #2.REMEDY:COMPLY WITH CODE #35663196X | May 9, 2023 POP/IN-VIO | $0 |
| Mar 16, 2022 | Construction CLASS - 2 REISSUED #35548426Z.NOTED:AT SMOKE BY EXIT 3 & EXTERIOR DOOR SMOKE BY EXIT 6 SMOKE BY ESIT 9 SMOKE BY EXIT 11 BASEMENT B17 AND SMOKE BY EXIT 2;EXIT DOORS NOT WORKING PROPERLY.REMEDY:REPAIR/REPLACE DOOR. #35644389Z | Jun 21, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| May 23, 2018 | CONSTRUCTION #CN40103B | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 10:47 PM ET. BBL 4003630001.