6 floors · 83 apartments · 67,468 sq ft · built 1928 · class D4 · owner of record: Cambridge Equities Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 67,468 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 792 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1291). Agency page | Dec 31, 2031 in 1887 days | Next due 2031 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 3, 2022 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED SIDEWALK SHED INSTALLED ON WALKWAYS AT EXPOSURE ONE PERMIT # Q00594580-I1-SH EXPIRED ON 09/16/2022 NOT RENEW AS REQUIRED. RENEW SIDEWALK SHED PERMIT. #39507126L | Nov 22, 2022 DEFAULT | $3,125 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 5, 2025 | C | Apt 4D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4D, 4th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION AT SOUTH | Mar 3, 2025 |
| Jan 14, 2025 | B | Apt 3R · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 1B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1B, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 1H · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1H, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 4F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4F, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 3M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3M, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 2B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 5N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5N, 5th STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 5C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 5C, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 1M · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1M, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 4N · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 4N, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 18, 2025 |
| Jan 14, 2025 | B | Apt 2A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM EAST AT SOUTH | Feb 18, 2025 |
| Jan 3, 2025 | C | Apt 4D · § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jan 7, 2025 |
| Jan 3, 2025 | C | Apt 4D · § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jan 7, 2025 |
| Nov 25, 2024 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF DOUBLE CYLINDER LOCK INSTALLED ON METAL SECURITY GATE LEADING TO COMPACTOR CHUTE AT CELLAR | Dec 1, 2024 |
| Nov 14, 2024 | C | Apt 4D · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Dec 8, 2024 |
| Jun 13, 2024 | B | Apt 5E · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE REGLAZE THE BATHTUB IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Jul 18, 2024 |
| Jun 13, 2024 | B | Apt 5E · § 27-2005 HMC: REFIT DOOR IN THE ENTRANCE LOCATED AT APT 5E, 5th STORY, 4th APARTMENT FROM SOUTH AT WEST | Jul 18, 2024 |
| Aug 3, 2023 | B | Apt 1G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD SINK BASE CABINET DOORS IN THE KITCHEN LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Sep 7, 2023 |
| Aug 3, 2023 | B | Apt 1G · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQAURE FEET AT EAST WALL AND CEILING IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Sep 7, 2023 |
| Aug 3, 2023 | B | Apt 1G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Sep 7, 2023 |
| Aug 3, 2023 | B | Apt 1G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL AND CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Sep 7, 2023 |
| Aug 3, 2023 | B | Apt 1G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT NORTH | Sep 7, 2023 |
| Dec 14, 2021 | B | Apt 5D · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING ( 4 SQ FT ) & SOUTH ( 6 SQ FT )WALL IN THE BATHROOM LOCATED AT APT 5D, 5th STORY, 3rd APARTMENT FROM SOUTH AT WEST , SECTION ''SOUTH'' | Jan 18, 2022 |
| Jan 5, 2021 | C | Apt 6J · § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT ... IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STORY, 3rd APARTMENT FROM WEST AT NORTH | Jan 9, 2021 |
| Aug 25, 2020 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Aug 29, 2020 |
| Mar 23, 2020 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Mar 29, 2020 |
| Jan 30, 2006 | B | Apt 1G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS & CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 1G, 1st STORY, APARTMENT AT SOUTH | Mar 11, 2006 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 5:26 PM ET. BBL 4012910012.