4 floors · 7 apartments · 7,534 sq ft · built 2008 · class C7 · owner of record: Corona 108 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2023-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 13, 2022 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35542839J ISSUED ON 01/04/21 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR OCCUPYING BLDG W/O A VALID CERT OF OCCUPANCY. #35567633P | Apr 12, 2022 IN VIOLATION | $1,250 |
| Nov 19, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35542839J ISSUED ON 1/4/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 102-01.BUILDING OR OPEN LOT OCCUPIED #35566087M | Feb 15, 2022 IN VIOLATION | $3,125 |
| Sep 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35542839J ISSUED ON 1/4/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.BUILDING OR OPEN LOT OCC #35536168R | Jun 21, 2022 IN VIOLATION | $3,125 |
| Jun 23, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35542839J ISSUED ON 1/4/2021 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.REMEDY:COMPLY WITH COMMI #35532688M | Sep 14, 2021 DEFAULT | $3,125 |
| Apr 7, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35542839J ISSUED1/4/21&TO FILE C/C PURSUANT TO28-201.1&1RCNY102-01.BLDG OR OPEN LOT OCCUPIED W/O VALID C/O.COMPLY W/COMMISSIONER'S ORDER &/OR FILE #35527599Y | Jun 29, 2021 DEFAULT | $3,125 |
| Jan 4, 2021 | Construction CLASS - 1 BLDG OR OPEN LOT OCCUPIED W/OUT A VALID CERTIFICATE OF OCCUPANCY.NOTED:JOB #402454982 FILED TO ERECT NEW BLDG HAS NOT BEEN SIGNED OFF & A CERTIFICATE OF OCCUPANCY HAS NOT BEEN OBTAINED.AT TIME OF INSPECTION,OBS #35542839J | Mar 30, 2021 DEFAULT | $25,000 |
| Sep 29, 2020 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35475997H ISSUED ON 02/13/20 & TO FILE A CERT OF CORRECTION PURSUANT TO 28-201.1 & 1RCNY 102-01. BLDG OR OPEN LOT OCCUPIED W/O A VALID C OF O. #35520797N | Dec 22, 2020 DEFAULT | $3,125 |
| Feb 13, 2020 | Construction CLASS - 1 BUILDING OR OPEN LOT OCCUPIED W/O A VALID CERTIFICATE OF OCCUPANCY.NOTED:BUILDING ERECTED UNDER JOB#402454982NB,C OF O EXPIRED 01/12/15@THE TIME OF INSPECTION,BUILDING IS OCCUPIED AT 1F WITH A FEMALE 2F W/A FEM #35475997H | Jan 12, 2021 DEFAULT | $25,000 |
| Jan 9, 2020 | Construction CLASS - 1 BUILDING OR OPEN LOT OCCUPIED W/O A VALID C OF O. NOTED:4 STORY BUILDING ERECTED UNDER JOB#402454982NB. C OF O EXPIRED 1/12/15. AT THE TIME OF INSPECTION PREMISES IS OCCUPIED AT 2ND FL-APT.2R W/ 2 FEMALE,1 MALE #35461544H | Aug 11, 2020 DEFAULT | $25,000 |
| Nov 21, 2019 | Construction CLASS - 1 BUILDING OR OPEN LOT OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY OBSERVED FOUR STORY BUILDING ERECTED UNDER JOB #40245983NB EXPIRED ON 01-12-15 AT TIME OF INSPECTION APARTMENT 1F AT THE 1ST FLOOR WAS OCCU #35465132J | Feb 4, 2020 DEFAULT | $25,000 |
| Oct 3, 2019 | Construction CLASS - 1 NEW BLDG OR OPEN LOT OCCUPIED W/O VALID CERT OF OCCUPANCY. NOTED: 4 STY BLDG CONSTRUCTED UNDER JOB#402454982NB C OF O EXP 1-12-15. AT THE TIME OF INSPECTION PREMISES OCCUPIED AT 1ST FL APT#1F W/1 FEMALE & 2 KID #35454712M | Dec 17, 2019 DEFAULT | $25,000 |
| Jul 24, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATIN #35401887P ISSUED ON 03-07-2019 AND TO FILE A CERTIFICATE OF CORRECCTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.FOR OCCUPYING BUILDING #35426783L | Oct 1, 2019 DEFAULT | $3,125 |
| May 10, 2019 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/ VIOLATION #35401887P ISSUED ON 03/07/19 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO28-201.1 AND 1RCNY 102-01. NEW BUILDING OR OPEN #35398170N | Jul 16, 2019 DEFAULT | $3,125 |
| Mar 7, 2019 | Construction CLASS - 1 NEW BLDG OR OPEN LOT OCCUPIED W/O A VALID CERT OF OCCUPANCY. NOTED: 4 STY BLDG CONSTRUCTED UNDER JOB#40245498NB. C OF O EXP ON 1-12-15. AT THE TIME OF INSPECTION PREMISES IS OCCUPIED W/FEMALE @ 1ST FL & A MALE. #35401887P | May 14, 2019 DEFAULT | $25,000 |
| Jan 11, 2019 | Construction CLASS - 1 NEW BLDG OR OPEN LOT OCCUPIED W/O A VALID C OF O. NOTED: 4 STY BLDG CONSTRUCTED UNDER JOB#402454982 PERMIT EXP ON 12-18-09 AT TIME OF INSPECTION,I OBSERVED/SPOKE W/FEMALE OCCUPANT AT APT#1F OCCUPYING THE BLDG #35381425P | May 14, 2019 IN VIOLATION | $6,250 |
| Nov 15, 2018 | Construction CLASS - 1 NEW BLDG OR OPEN LOT OCCUPIED W/O A VALID C OF O. NOTED: 4 STY BLDG CONSTRUCTED UNDER NB#4024982 EXP ON 12-18-09 AT TIME OF INSPECTION I OBSERVED/SPOKE W/TENANTS OCCUPYING THE BLDG W/NO JOB SIGN OFF OR NEW C OF #35372580K | Jul 30, 2019 DEFAULT | $25,000 |
| Sep 24, 2018 | Construction CLASS - 2 FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35328029K ISSUED ON 4/28/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REMEDY:COMPLY W/ COMMISSIO #35388221P | Nov 20, 2018 DEFAULT | $3,125 |
| Aug 7, 2018 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35328029K ISSUED 04/28/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. REM: COMPLY WITH COMMISSI #35341569H | Sep 25, 2018 DEFAULT | $3,125 |
| Apr 28, 2018 | Construction CLASS - 1 NEW BLDG OR OPEN LOT OCCUPIED W/OUT A VALID C OF O NOTED:PREMISES 3 STORY FRAME DWELLING.BLDG CONSTRUCTED UNDER APP #402454982-NB EXPIRED ON12/18/2009. FOUND PREMISES OCCUPIED 1ST TO 3RD FL AS DWELLING & CELLAR #35328029K | Jul 24, 2018 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Mar 31, 2021 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00428 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #06009 | DOB VIOLATION - ACTIVE |
| Sep 2, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #06008 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00631 | DOB VIOLATION - ACTIVE |
| Dec 26, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00717 | DOB VIOLATION - ACTIVE |
| May 29, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00685 | DOB VIOLATION - ACTIVE |
| Apr 3, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00511 | DOB VIOLATION - ACTIVE |
| Feb 6, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00457 | DOB VIOLATION - ACTIVE |
| Jul 25, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00454 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Mar 31, 2021 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 2, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Dec 26, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| May 29, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Apr 3, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 6, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 25, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 2, 2026 | A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX | Jan 5, 2027 |
| Oct 2, 2026 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Jan 5, 2027 |
| Oct 2, 2026 | A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS | Jan 5, 2027 |
| Oct 2, 2026 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Jan 5, 2027 |
| Oct 2, 2026 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Jan 5, 2027 |
| Oct 2, 2026 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT | Jan 5, 2027 |
| May 8, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 11, 2026 |
| Jun 13, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 16, 2025 |
| Jan 16, 2025 | A | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE AT PUBLIC HALL STAIRS, 4th STORY | Apr 21, 2025 |
| Jan 16, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE AT 1st PUBLIC HALL BULKHEAD FROM EAST, 4th STORY | Feb 20, 2025 |
| Jan 16, 2025 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCION MATERIAL AT PUBLIC HALL STAIRS, 4th STORY | Feb 20, 2025 |
| Jan 16, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL STAIRS, 4th STORY | Feb 20, 2025 |
| Jan 16, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND SOUTH WALL AT PUBLIC HALL STAIRS, 4th STORY | Apr 21, 2025 |
| Apr 17, 2024 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 21, 2024 |
| Apr 4, 2024 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | May 9, 2024 |
| Mar 28, 2024 | B | Apt 2R · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 2, 2024 |
| Mar 28, 2024 | A | Apt 2R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 1, 2024 |
| Mar 28, 2024 | A | Apt 2R · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SINK IN THE KITCHEN LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 1, 2024 |
| Mar 28, 2024 | A | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 1, 2024 |
| Mar 28, 2024 | B | Apt 2R · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 2, 2024 |
| Mar 28, 2024 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 2, 2024 |
| Mar 28, 2024 | C | Apt 2R · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 11, 2024 |
| Mar 28, 2024 | B | Apt 2R · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION SINK WASTE LINE PIPE IN THE KITCHEN LOCATED AT APT 2R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | May 2, 2024 |
| Mar 20, 2024 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING | Mar 26, 2024 |
| Mar 20, 2024 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR MISSING AT PUBLIC HALL, 1st STORY | Jun 23, 2024 |
| Mar 20, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE VESTIBULE DOOR HINGES AT PUBLIC HALL, 1st STORY | Apr 3, 2024 |
| Mar 20, 2024 | B | Apt 4R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 10 SQ FT AT NORTH WALL, APPROX 10 SQ AT CEILING IN THE 1st BATHROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2024 |
| Mar 20, 2024 | B | Apt 4R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 20 SQ FT AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE APPROXIMATELY 25 SQ FT OF BUCKLING WOOD FLOOR TILES IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING AND DEFECTIVE SPRINKLER HEAD AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING MISSING AND DEFECTIVE SPRINKLER HEAD AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER SASH WINDOW COUNTERBALANCE AT FRIST WINDOW FROM NORTH AT EAST IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PAINTED SPRINKLER HEAD IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 26, 2024 |
| Mar 20, 2024 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF BED AND HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORY | Apr 24, 2024 |
| Mar 20, 2024 | C | Apt 4R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 15, 2024 |
| Mar 20, 2024 | B | Apt 4R · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2024 |
| Mar 20, 2024 | A | Apt 4R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WARPED WOOD FLOOR TILES IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 23, 2024 |
| Mar 20, 2024 | A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Jun 23, 2024 |
| Mar 20, 2024 | A | § 27-2046.1 HMC: POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN A PRIVATE DWELLING. | Jun 23, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 3, WG TO REPLACE = 0, WG TO REPAIR = 0 IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APAR | Apr 15, 2024 |
| Mar 20, 2024 | C | Apt 4R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 15, 2024 |
| Mar 20, 2024 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Jun 23, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 3, 2024 |
| Mar 20, 2024 | B | Apt 4R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WARPED WOOD FLOOR TILES IN THE 2nd ROOM FROM EAST LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2024 |
| Mar 20, 2024 | B | Apt 4R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 15 SQ FT AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2024 |
| Mar 20, 2024 | A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Jun 23, 2024 |
| Mar 20, 2024 | B | Apt 4R · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2024 |
| Mar 20, 2024 | A | Apt 4R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND EAST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 23, 2024 |
| Mar 20, 2024 | A | Apt 4R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 23, 2024 |
| Mar 20, 2024 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BULKHEAD DOOR HINGES , 4th STORY | Apr 3, 2024 |
| Mar 20, 2024 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PAINTED SPRINKLER HEAD AT VESTIBULE CEILING AT PUBLIC HALL, 1st STORY | Mar 26, 2024 |
| Mar 20, 2024 | C | § 27-2005, 2050 HMC: PROVIDE AN ADEQUATE SUPPLY OF WATER FOR THE WET SPRINKLER AND/OR STANDPIPE SYSTEM AT THROUGHOUT | Mar 26, 2024 |
| Mar 20, 2024 | A | Apt 4R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 23, 2024 |
| Mar 20, 2024 | C | Apt 4R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 40 SQ FT AT CEILING, APPROX 20 SQ FT AT EAST WALL,APPROX 10 SQ FT AT SOUTH WALL, IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 15, 2024 |
| Mar 20, 2024 | A | Apt 4R · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT NORTH WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 23, 2024 |
| Mar 20, 2024 | B | Apt 4R · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4R, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 24, 2024 |
| Mar 31, 2023 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Jul 4, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | HPD A | §27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX | Open |
| Oct 2, 2026 | HPD A | § 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Open |
| Oct 2, 2026 | HPD A | §27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGS | Open |
| Oct 2, 2026 | HPD A | § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED | Open |
| Oct 2, 2026 | HPD A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. | Open |
| Oct 2, 2026 | HPD A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME READILY ACCESSIBLE FOR SIGNATURE, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 1:40 AM ET. BBL 4017770058.