7 floors · 22 apartments · 20,489 sq ft · built 2025 · class D6 · owner of record: First Tower Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2024-09-30 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 115 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 11, 2026 | Construction CLASS - 2 FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO AND/OR EXPOSEONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND PERMITTED WORK SITE. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 7 STORY NEW BUI #35730252Z | Nov 19, 2026 PENDING | $2,500 |
| Aug 8, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE IN PLACE NOT MAINTAINED AS PER 3307.7, WITH GAPS AND LEANING PROVIDING MEANS OF UNAUTHORIZED ACCESS TO JOBSITE AND CREATING A STRUCK BY HAZARD FOR THE PUBLIC. #39557690H | May 13, 2027 | $1,000 |
| Aug 8, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED INACTIVE JOBSITE WITH JERSEY BARRIERS BEING USED TO DETERMINE PEDESTRIAN WALKWAY NOT MAINTAINED AS PER MANUFACTURER SPECIFICATIONS, NOT INTERLOCKED NOT FILLED WITH WATER OR SAND A #39557689K | May 13, 2027 | $2,500 |
| Aug 8, 2026 | Construction CLASS - 1 AT INSPECTION, OBSERVED THE SIDEWALK SHED AT EXPOSURE 1 EXTENDED ONLY 10 FEET FROM THE 70-FOOT-HIGH, 7-STORY BUILDING AND STOPPED BEFORE THE PEDESTRIAN WALKWAY WITHIN HALF THE BUILDING HEIGHT, LEAVING PEDESTRIA #39557692L | May 13, 2027 | $4,800 |
| Jun 15, 2026 | Site Safety CLASS - 1 NOTE: AT TIME OF INSPECTION, I OBSERVED AN ACTIVE CONSTRUCTION SITE, UPON REQUESTING FOR THE CONSTRUCTION SUPERINTENDENT OR COMPETENT PERSON ON SITE, I WAS TOLD BY THE CONCRETE CONTRACTOR THAT HE IS COMING, I W #39555526R | Mar 22, 2027 | $10,000 |
| Dec 23, 2025 | Construction CLASS - 2 OBSERVED CONSTRUCTION SITE FENCE FOR GC #604402 LACKING A REQUIRED PROJECT INFORMATION PANEL. FAILURE TO POST PROJECT INFORMATION AS REQUIRED BY NYC BUILDING CODE 3301.9.INSTALL AND MAINTAIN AN APPROVED PROJECT #39548452H | Mar 5, 2026 IN VIOLATION | $1,250 |
| Dec 23, 2025 | Unknown CLASS - 2 OBSERVED PEDESTRIAN PROTECTION YODOCKS AT SITE FOR GC #604402 NOT MAINTAINED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS, CREATING UNSAFE CONDITIONS FOR PEDESTRIAN USE; AS REQUIRED BY NYC BUILDING CODE 330 #39548453J | Sep 3, 2026 IN VIOLATION | $2,500 |
| Aug 30, 2025 | Unknown CLASS - 1 AT TIME OF INSPECTION I OBSERVED INADEQUATE PEDESTRIAN PROTECTION AT SITE, THE YODAK'S IN THE STREET ON EXPOSURE 2 WERE NOT PROPERLY CONNECTED TO EACH OTHER NOR WHERE THE FILLED WITH WATER WHICH WOULD PREVENT T #39544288R | May 18, 2026 IN VIOLATION | $1,250 |
| Aug 30, 2025 | Construction CLASS - 1 AT THE TIME OF INSPECTION I OBSERVED FENCE POSTS AND PANELS LEANING ON EXPOSURE 1, THE FENCE IS COVERED WITH GRAFFITI AND THE NETTING WHICH SECURES THE TOP OF THE FENCE TO THE BOTTOM OF THE SIDEWALK SHED WAS MI #39544284J | May 18, 2026 IN VIOLATION | $1,000 |
| Aug 16, 2025 | Unknown CLASS - 2 PROPOSED NEW 7 STORY BUILDING. OBSERVED ATOI SITE CLOSED NO ONGOING CONSTRUCTION ACTIVITY UPON INSPECTION NOTED SWS HAS BEEN ERECTED ON EXPOSURE 1,4 & BETWEEN SWS AND FENCE EXISTING GAP , MISSING DEBRIS NETTIN #39543756Y | Jan 7, 2027 | $2,500 |
| Jan 24, 2025 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. AS NOTED AT TIME OF INSPECTION ON AN ACTIVE CONSTRUCTION SITE, 7 STORY NEW BUILDING SOIL OF EXCANATION. WORKING IN PROGRESS. OBSERVED THAT THE SUPE #35689801K | Apr 3, 2025 DEFAULT | $10,000 |
| Apr 15, 2024 | Construction CLASS - 2 OBSERVED AN ERECTED SIDEWALK-SHED AT EXPOSURE #1 AND #2. ON INSPECTION OF THE PARAPET AT EXPOSURE #1 AND #2; GC FAILED TO PROVIDE A PARAPET INFORMATION PANEL. #39527528M | Mar 12, 2026 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #00558 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #00678 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #05442 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #05211 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #05406 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #05050 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #05576 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #05623 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #00946 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #01052 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #00992 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #00974 | DOB VIOLATION - ACTIVE |
| Aug 30, 1999 | CONSTRUCTION #ZSTF07AC | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #00990 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #06351 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #166258 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #01424 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #07559 | DOB VIOLATION - ACTIVE |
| Mar 18, 1994 | LOCAL LAW 62/91 - BOILERS #09972 | DOB VIOLATION - ACTIVE |
| Mar 18, 1993 | LOCAL LAW 62/91 - BOILERS #09972 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Mar 18, 1994 | Boiler LL6291 | Active |
| Mar 18, 1993 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 11, 2026 | ECB | Construction: FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACCESS TO AND/OR EXPOSEONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND PERMITTED WORK SITE. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 7 STORY NEW BUI | Open |
| Aug 8, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED CONSTRUCTION FENCE IN PLACE NOT MAINTAINED AS PER 3307.7, WITH GAPS AND LEANING PROVIDING MEANS OF UNAUTHORIZED ACCESS TO JOBSITE AND CREATING A STRUCK BY HAZARD FOR THE PUBLIC. | Closed |
| Aug 8, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED INACTIVE JOBSITE WITH JERSEY BARRIERS BEING USED TO DETERMINE PEDESTRIAN WALKWAY NOT MAINTAINED AS PER MANUFACTURER SPECIFICATIONS, NOT INTERLOCKED NOT FILLED WITH WATER OR SAND A | Closed |
| Aug 8, 2026 | ECB | Construction: AT INSPECTION, OBSERVED THE SIDEWALK SHED AT EXPOSURE 1 EXTENDED ONLY 10 FEET FROM THE 70-FOOT-HIGH, 7-STORY BUILDING AND STOPPED BEFORE THE PEDESTRIAN WALKWAY WITHIN HALF THE BUILDING HEIGHT, LEAVING PEDESTRIA | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 7:51 PM ET. BBL 1004440040.