5 floors · 76,540 sq ft · built 1931 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7196). Agency page | Dec 31, 2026 in 66 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 76,540 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 15 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-11 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT ROOF LEVEL THERE ARE MANY FISHHEADS WATER PUDDLES AND LOOSE ROOF PAPER.REM:COMPLY WITH CODE. #35722527Z | Apr 27, 2026 POP/IN-VIO | $0 |
| Mar 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.5TH FLOOR CLASSROOMS HAVE WATER DAMAGE THROUGHOUT 511 IS THE WORST.REM:COMPLY WITH CODE. #35722529M | Apr 27, 2026 POP/IN-VIO | $0 |
| Mar 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.BULKHEAD HAS A DEEP LONG CORNER 3 HORIZONTAL CRACK.REM:COMPLY WITH CODE. #35722528K | Apr 27, 2026 POP/IN-VIO | $0 |
| Mar 13, 2026 | Construction CLASS - 2 REISSUE#35692112M-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.REM:COMPLY WITH CODE. #35722530J | Apr 13, 2026 POP/IN-VIO | $0 |
| Aug 5, 2025 | Boilers CLASS - 2 WEILMCLAIN STEAM BOILER HAS REDUCED PIPE@SAFETY VALVE TO BOILER+WATER FEED TANK GLASS GAUGE UNPROTECTED+VAC SYSTEM HAS DEFECTIVE GLASS GAUGE+BACKFLOW INCORRECT+OIL SHUTOFF VALVE MISSING@OIL TANK;CORRECT VIOLATI #39156066R | Aug 25, 2025 POP/IN-VIO | $0 |
| Aug 5, 2025 | Boilers CLASS - 2 WEILMCLAIN STEAM BOILER#2 HAS THE HONEYWELL FLUID POWER GAS VALVE LEAKING FLUID+REDUCED PIPE@BOILER SAFETY VALVE+CONDENSATE TANK VENT NOT PIPED DOWN;CORRECT VIOLATION+SUBMIT CERTIFICATE OF CORRECTION #39156065P | Aug 25, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 REISSUE #35682864X: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: ILLUMINATION FOR EXITS, EXIT DISCHARGED AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. EXISTING EMERGENCY LIGHTS ARE NOT OPERATIONAL WHEN #35692112M | Apr 16, 2025 POP/IN-VIO | $0 |
| Jun 24, 2024 | Construction CLASS - 2 REISSUE#35672608H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:ON THE THIRD FLOOR NEXT TO ROOM#313 TWO LIGHTS,IN T #35682864X | Aug 28, 2024 POP/IN-VIO | $0 |
| Mar 13, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES & PUBLIC CORRIDORS PER BC1006.1;27-381.NOTED:ON 3RD FL NEXT RM 313 TWO LIGHTS,IN AUDITORIUM,LIGHT IN THE GYMNASIUM,LI #35672608H | Jun 7, 2023 POP/IN-VIO | $0 |
| Jul 11, 2022 | Boilers CLASS - 2 1 1/2 SAFETY VALVE ON A 1 1/4 PIPE TO BOILER/REAR SKIMMER PIPE CORRODED/OIL SHUTOFF VALVE MISSING AT TOP OF OIL TANK/WHISKER SWITCH DEFECTIVE/PIPES AT FRESH AIR LOUVER NOT PROTECTED FROM FREEZING/OUTSIDE LOUVER #39065604L | Jul 27, 2022 POP/IN-VIO | $0 |
| Jul 11, 2022 | Boilers CLASS - 2 1 1/2 SAFETY VALVE ON 1 1/4 PIPE TO BOILER/FRESH AIR LOUVER WHISKER SWITCH DEFECTIVE/DRAIN PIPE TO BLOWDOWN TANK LEAKINGÝTEMP CLAMP¨REAR SKIMMER VALVE CORRODED/GAS HWH LEAKING/CONDENSATE TANK VENT NOT PIPED DOW #39065603J | Jul 27, 2022 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #18792 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #18793 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 15) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 7:52 AM ET. BBL 3071960001.