3 floors · 6 apartments · 6,075 sq ft · built 1930 · class C2 · owner of record: Eldad Ella Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-11-14 (Accepted). Agency page | Dec 31, 2026 in 65 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1161 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 27, 2024 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39114425Y ISSUED ON 5/15/24 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (WORK WITHOUT A PERMIT), #39117911N | Sep 4, 2024 DEFAULT | $6,250 |
| Jun 27, 2024 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39114421R ISSUED ON 5/15/24 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE TO MAINTAIN ADE #39117916M | Sep 4, 2024 DEFAULT | $6,250 |
| Jun 27, 2024 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39114423K ISSUED ON 5/15/24 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE TO MAINTAIN BUI #39117913R | Sep 4, 2024 DEFAULT | $6,250 |
| May 15, 2024 | Construction CLASS - 1 OBSERVED IN BASEMENT/CELLAR LEVEL NEWLY INSTALLED OIL FUELED BOILER. NO PERMITS ON FILE AT THE DOB FOR THIS INSTALLATION. ALSO WHOLE PENETRATIONS IN THE WALL AT THE BOILER ROOM., OBTAIN PERMIT #39114425Y | Jul 24, 2024 DEFAULT | $12,500 |
| May 15, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, ERODED MOTOR JOINTS AT EXPO 2 AND 3 . 3RD STORY. 28-301.1, REPAIR AND/REPLACE; COMPLY WITH NOTICE OF VIOLATION #39114423K | Jul 24, 2024 DEFAULT | $6,250 |
| May 15, 2024 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED EXCESSIVE AMOUNTS OF DEBRIS, HOUSE HOLD ITEMS AND GARBAGE THROUGH OUT CELLAR REAR YARD AND SIDE YARD AT EXPO 1,3,4. BC3303.4, MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING; COMPLY W #39114421R | Jul 24, 2024 DEFAULT | $12,500 |
| May 15, 2024 | Construction CLASS - 2 OBSERVED IN THE CELLAR/BASEMENT ACTIVE WATER LEAK ON THE SUPPLY LINE.. AS PER 102.3 OF THE PLUMBING CODE MAINTENANCE. INSTALLATIONS, BOTH EXISTING AND NEW, AND PARTS THEREOF SHALL BE MAINTAINED IN PROPER OPERAT #39114424M | Jul 24, 2024 DEFAULT | $3,125 |
| Apr 5, 2024 | Boilers CLASS - 2 FOUND WEIL MCLAIN OIL FIRED STEAM BOILER MODEL 80 SERIES 1 INSTALLED AND UNREGISTERED. CORRECT ALL VIOLATING CONDITIONS, REGISTER BOILER AND SUBMIT A CERTIFICATE OF CORRECTION. #39110826R | Jun 12, 2024 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #14060 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #12842 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 14, 2025 | A | Apt 3L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE FOYER LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2025 |
| Aug 14, 2025 | A | Apt 3L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 17, 2025 |
| Oct 28, 2024 | A | Apt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING THROUGHOUT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 31, 2025 |
| Oct 28, 2024 | A | Apt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 31, 2025 |
| Oct 28, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING THROUGHOUT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 31, 2025 |
| Sep 19, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILES SUSPENDING CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 23, 2024 |
| Sep 12, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTICS TILES SYSPENDED CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM NORTH AT EAST | Dec 16, 2024 |
| Jun 10, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 13, 2024 |
| May 21, 2024 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT CELLAR | Jun 25, 2024 |
| May 20, 2024 | A | Apt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACOUSTIC TILE AT CEILING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2024 |
| May 20, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED ACOUSTIC TILE AT CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 23, 2024 |
| May 20, 2024 | B | Apt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 24, 2024 |
| May 20, 2024 | A | Apt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACOUSTIC TILE AT CEILING IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2024 |
| May 20, 2024 | A | Apt 3L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED ACOUSTIC TILE AT CEILING IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Aug 23, 2024 |
| May 20, 2024 | B | Apt 3L · § 27-2005 ADM CODE PROVIDE ESCUTCHEON PLATE AT STEAM RISER AT CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 24, 2024 |
| Mar 19, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILE DROP CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 22, 2024 |
| Mar 19, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILE DROP CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 22, 2024 |
| Mar 19, 2024 | A | Apt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILE SUSPENDED CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Jun 22, 2024 |
| Jul 3, 2023 | A | Apt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC CEILING TILES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Oct 6, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 5:22 PM ET. BBL 3072600112.