Brooklyn · Block 7260 · Lot 112 · 11235

367 Neptune Avenue

3 floors · 6 apartments · 6,075 sq ft · built 1930 · class C2 · owner of record: Eldad Ella Llc

28open violations
$56,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-11-14 (Accepted). Agency page

Dec 31, 2026
in 65 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1161 days
Next cycle year 2029

Open violations

ECB / OATH (8) · $56,250 owed
IssuedViolationHearingBalance
Jun 27, 2024Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39114425Y ISSUED ON 5/15/24 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (WORK WITHOUT A PERMIT),
#39117911N
Sep 4, 2024
DEFAULT
$6,250
Jun 27, 2024Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39114421R ISSUED ON 5/15/24 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE TO MAINTAIN ADE
#39117916M
Sep 4, 2024
DEFAULT
$6,250
Jun 27, 2024Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION# 39114423K ISSUED ON 5/15/24 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01. (FAILURE TO MAINTAIN BUI
#39117913R
Sep 4, 2024
DEFAULT
$6,250
May 15, 2024Construction CLASS - 1
OBSERVED IN BASEMENT/CELLAR LEVEL NEWLY INSTALLED OIL FUELED BOILER. NO PERMITS ON FILE AT THE DOB FOR THIS INSTALLATION. ALSO WHOLE PENETRATIONS IN THE WALL AT THE BOILER ROOM., OBTAIN PERMIT
#39114425Y
Jul 24, 2024
DEFAULT
$12,500
May 15, 2024Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER, ERODED MOTOR JOINTS AT EXPO 2 AND 3 . 3RD STORY. 28-301.1, REPAIR AND/REPLACE; COMPLY WITH NOTICE OF VIOLATION
#39114423K
Jul 24, 2024
DEFAULT
$6,250
May 15, 2024Construction CLASS - 1
AT TIME OF INSPECTION OBSERVED EXCESSIVE AMOUNTS OF DEBRIS, HOUSE HOLD ITEMS AND GARBAGE THROUGH OUT CELLAR REAR YARD AND SIDE YARD AT EXPO 1,3,4. BC3303.4, MAINTAIN ADEQUATE CONSTRUCTION HOUSEKEEPING; COMPLY W
#39114421R
Jul 24, 2024
DEFAULT
$12,500
May 15, 2024Construction CLASS - 2
OBSERVED IN THE CELLAR/BASEMENT ACTIVE WATER LEAK ON THE SUPPLY LINE.. AS PER 102.3 OF THE PLUMBING CODE MAINTENANCE. INSTALLATIONS, BOTH EXISTING AND NEW, AND PARTS THEREOF SHALL BE MAINTAINED IN PROPER OPERAT
#39114424M
Jul 24, 2024
DEFAULT
$3,125
Apr 5, 2024Boilers CLASS - 2
FOUND WEIL MCLAIN OIL FIRED STEAM BOILER MODEL 80 SERIES 1 INSTALLED AND UNREGISTERED. CORRECT ALL VIOLATING CONDITIONS, REGISTER BOILER AND SUBMIT A CERTIFICATE OF CORRECTION.
#39110826R
Jun 12, 2024
DEFAULT
$3,125
DOB (2)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#14060
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#12842
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
HPD (19) · C 0 · B 3 · A 16
IssuedClassViolationCorrect by
Aug 14, 2025AApt 3L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE FOYER LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHNov 17, 2025
Aug 14, 2025AApt 3L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHNov 17, 2025
Oct 28, 2024AApt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING THROUGHOUT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHJan 31, 2025
Oct 28, 2024AApt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION DROP CEILING THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHJan 31, 2025
Oct 28, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION WOOD PANELING THROUGHOUT ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJan 31, 2025
Sep 19, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILES SUSPENDING CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTDec 23, 2024
Sep 12, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTICS TILES SYSPENDED CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM NORTH AT EASTDec 16, 2024
Jun 10, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 3R, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTSep 13, 2024
May 21, 2024B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL CEILING AT CELLARJun 25, 2024
May 20, 2024AApt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACOUSTIC TILE AT CEILING IN THE BATHROOM LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHAug 23, 2024
May 20, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED ACOUSTIC TILE AT CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHAug 23, 2024
May 20, 2024BApt 3R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJun 24, 2024
May 20, 2024AApt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION SUSPENDED ACOUSTIC TILE AT CEILING IN THE KITCHEN LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHAug 23, 2024
May 20, 2024AApt 3L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION CONSISTING OF SUSPENDED ACOUSTIC TILE AT CEILING IN THE KITCHEN LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHAug 23, 2024
May 20, 2024BApt 3L · § 27-2005 ADM CODE PROVIDE ESCUTCHEON PLATE AT STEAM RISER AT CEILING IN THE BATHROOM LOCATED AT APT 3L, 3rd STORY, 1st APARTMENT FROM WEST AT NORTHJun 24, 2024
Mar 19, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILE DROP CEILING IN THE KITCHEN LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJun 22, 2024
Mar 19, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILE DROP CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJun 22, 2024
Mar 19, 2024AApt 3R · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC TILE SUSPENDED CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3R, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHJun 22, 2024
Jul 3, 2023AApt 1L · § 300 M/D LAW FILE PLANS AND APPLICATION AND LEGALIZE THE FOLLOWING ALTERATION OR RESTORE TO THE LEGAL CONDITION EXISTING PRIOR TO THE MAKING OF SAID ALTERATION ACOUSTIC CEILING TILES IN THE ENTIRE APARTMENT LOCATED AT APT 1L, 1st STORY, 1st APARTMENT FROM WEST AT NORTHOct 6, 2023

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 5:22 PM ET. BBL 3072600112.

Look up another building