2 floors · 2 apartments · 3,213 sq ft · built 1927 · class S2 · owner of record: 3653 Tremont Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 774 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 14, 2026 | Construction CLASS - 2 WORK WITHOUT PERMIT : NOTED : INSTALLATION OF ELECTRICAL TO POWER ROLL GATE WITH CONDUIT AND JUNCTION KEY SWITCH BOX AT EXPOSURE 1 OF A TWO STORY BUILDING WITH COMMERCIAL SPACE AT STREET LEVEL. NO FILINGS OR PE #39204026X | Nov 20, 2026 PENDING | $1,250 |
| Apr 15, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED VIOLATING CONDITIONS HAVE BEEN CORRECTED. HOWEVER, NO CERTIF #39184707X | Jul 17, 2026 IN VIOLATION | $1,250 |
| Apr 15, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIME OF INSPECTION, OBSERVED JOB PERMITTED UNDER JOB # X01282342-I1-EL AND X01181803-S1-P #39184706Y | Jul 17, 2026 IN VIOLATION | $1,250 |
| Apr 3, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT-MANNER; NOTED: OBSERVED STORAGE OF EXCESSIVE DEBRIS AT REAR OF PROPERTY CONSISTING OF METAL, PLASTIC & FOAM., REPAIR AND/OR REPLACE #39143847R | Jun 8, 2026 IN VIOLATION | $1,250 |
| Apr 3, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR SUMMONS # 35676219M ISSUED ON 10/10/23 & 39126655H ISSUED ON 10/04/24., FILE A CERTIFICAT #39143849K | May 7, 2026 IN VIOLATION | $1,250 |
| Oct 4, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING. OBSERVED AT AT EXP#1 AND 2, MASONRY FACADE IS IN STATE OF DISREPAIR , MISSING MORTAR BETWEEN BRICK JOINTS & STEP-CRACKS IN VARIOUS LOCATIONS THROUGHOUT., REPAIR AND/REPLACE; REPAIR #39126656J | Jun 12, 2025 IN VIOLATION | $1,250 |
| Feb 26, 2024 | Construction CLASS - 2 OBSERVED AT AT EXP.3/REAR, MASONRY FACADE IS IN STATE OF DISREPAIR WITH MULTIPLE SPALLING BRICKS, MISSING MORTAR BETWEEN BRICK JOINTS & STEP-CRACKS IN VARIOUS LOCATIONS THROUGHOUT., REPAIR AND/OR REPLACE #39106869P | Sep 6, 2024 IN VIOLATION | $625 |
| Feb 26, 2024 | Construction CLASS - 1 OBSERVED AT INTERIOR OF 1FLR COMMERCIAL SPACE. ELEC. WIRING SPLICED W. EXTENSION CORD FROM BSMT. TO FEED POWER TO 1FLR. ALSO, PLUMB. WORK, PVC PIPE CONNECTED TO MAIN DRAIN LINE TO INSTALL PVC TRAP FOR 2FLR BATH #39106868N | Sep 6, 2024 IN VIOLATION | $2,500 |
| Oct 10, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. UPON INSPECTIONOBSERVED AT EXP. 1/FRONT. AT VARIOUS LOCATIONS THROUGHOUT THE 2ND FLOOR FACADE NUMEROUS STEP CRACKS BETWEEN BRICK JOINTS WITH MISSING MORTAR #35676220J | Oct 3, 2025 IN VIOLATION | $625 |
| Oct 10, 2023 | Construction CLASS - 1 WORK WITHOUT A PERMIT. UPON INSPECTION OBSERVED AT THE REAR OF THE LOT, THE 1-STORY GARAGE IS BEING ALTERED DUE TO THE PARAPET WALL GETTING DEMOLISHED, LINTEL IS REMOVED, GARAGE DOOR IS RECONSTRUCTED/REPLACED W #35676219M | Oct 3, 2025 IN VIOLATION | $2,500 |
| Sep 14, 2022 | Boilers CLASS - 2 B254 AS PER D.O.B. RECORDS PERMIT#220370970 HAS NOT BEEN SIGNED OFF THEREFORE BOILER IS UNREGISTERED.REGISTER BOILER AND SUBMIT CERTIFICATE OF CORRECTION #39069991Z | Aug 8, 2023 IN VIOLATION | $625 |
| Oct 7, 2020 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454379H ISSUED ON 04/28/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT PERMIT AT C #35520998J | Apr 9, 2021 IN VIOLATION | $2,500 |
| Oct 7, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35454380P ISSUED ON 04/28/20 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.ALTERED CHANGE BUILDING #35520997H | Apr 9, 2021 IN VIOLATION | $625 |
| Apr 28, 2020 | Construction CLASS - 1 WORK WITHOUT PERMIT NOTED AT CELLAR LEVEL PARTITIONS ERECTED THROUGHOUT TO CREATE ONE CLASS A APARTMENT ALONG WITH TWO SROS ALSL GAS LINE + PLUMBING FOR GAS STOVE AND THREE PIECE BATHROOMS WITHOUT PERMIT OBTAIN #35454379H | Mar 26, 2021 IN VIOLATION | $2,500 |
| Apr 28, 2020 | Construction CLASS - 1 ALTERED CHANGED BUILDING OCCUPIED W/O A CALID C/O NOTED AT CELLAR PARTITIONS PLUMBING + ELECTRICAL WORK TO CREATE ONE CLASS APARTMENT AND TWO SROS WITHOUT PERMIT TO INCREASE OCCUPANCY WITHOU VALID CO.OBTAIN CO #35454380P | Mar 26, 2021 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07469 | DOB VIOLATION - ACTIVE |
| Dec 11, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00467 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #06749 | DOB VIOLATION - ACTIVE |
| Jun 12, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00070 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #14369 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #34681 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #14530 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #35468 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #08681 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #04650 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #04562 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #04200 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #05147 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #08879 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #05152 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #07143 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #08305 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #08105 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #08047 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #08413 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #08070 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #08783 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #09440 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Dec 11, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 12, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 14, 2026 | ECB | Construction: WORK WITHOUT PERMIT : NOTED : INSTALLATION OF ELECTRICAL TO POWER ROLL GATE WITH CONDUIT AND JUNCTION KEY SWITCH BOX AT EXPOSURE 1 OF A TWO STORY BUILDING WITH COMMERCIAL SPACE AT STREET LEVEL. NO FILINGS OR PE | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 7:41 PM ET. BBL 2054270002.