Brooklyn · Block 2237 · Lot 9 · 11206

365 Marcy Avenue

4 floors · 6 apartments · 6,400 sq ft · built 1931 · class S5 · owner of record: Perkar Llc

19open violations
$15,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 793 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-10-15 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3) · $15,000 owed
IssuedViolationHearingBalance
Jul 7, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AS NOTED AT TIME OF INSPECTION. OBSERVED 1 STORY MASONRY STRUCTURE WITH BRICK AND MORTAR FACADE. OBSERVED AT EXPOSURE #1. PARAPET WALL WAS SUBSTANTIALLY CR
#35693966K
Feb 16, 2027
$2,500
Oct 1, 2024Construction CLASS - 1
FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE OR A PERIODIC INSPECTION OF A PARKING STRUCTURE(PIPS) REPORT DOCUMENTING THE CONDITIONS OF PSID#B000
#37031087Y
Feb 5, 2025
DEFAULT
$12,500
Mar 31, 2012Boilers CLASS - 2
B254:15,21B,38,48A,50A-K.50A:NO FRESH AIR TO BOILER ROOM 50B:PIPE FOR FRESH AIR FOR ADJOINING ROOM CANNOT RUN THRU BLR ROOM 50C:SEAL ALL HOLES IN BLR ROOM 50D:GAUGE GLASS DIRTY 50E:CEMENT OIL LINES BY BLR 50F:
#32071795J
May 21, 2012
WRITTEN OFF
$0
DOB (9)
IssuedViolationStatus
Sep 22, 2025CONSTRUCTION
UNLAWFUL ACTS OF FAILURE TO COMPLY WITH COMMISSIONER ORDER#070725CPS30 101JL EMERGENCY WORK ORDER ISSUED ON 7/7/2025 COMPLAINT#3A21914.AFTER OBSERVATION,PARAPET,MASONRY WALL WHICH APPEARS TO HAVE SHIFTED & CRACK ING SPALLING BRICK IN DANGER OF FALLING INTO PUBLIC SIDEWALK.REMEDY:IM MEDIATELY COMPLY
#PS30108JL
DOB VIOLATION - ACTIVE
Jul 7, 2025CONSTRUCTION
EWO OBSRVD 1 STORY STRCTRE WITH MASONRY PARPET, APPEARS TO HAVE SHIFTD & CRCKING.CRACKD/SPALLIN BRICK IN DNGER OF FALLIN INTO PUBLC SIDEWALK REMEDY:IMMEDTE INSTALL ADEQUATE SAFTY MEAS TO PROTCT. IMMEDTLY RETAIN A NYS PRO ENGNR TO EVALUTE THE ENTIRE FACDE INCLUDIN PARPET &PROVIDE METHOD OF STABILZIN/
#PS30101JL
DOB VIOLATION - ACTIVE
Jul 7, 2025CONSTRUCTION
EMERGENCY WORK ORDER.OBSRVD 1STRY STRCTRE W/MASONRY PARAPET WALL WHICH APPEARS TO HAVE SHIFTED&CRACKNG&CRACKD/SPALLNG BRCK IN DANGER OF FALLNG INTO PUBLIC SIDEWALK.IMMED INSTLL ADEQUATE SFTY MEASURES TO PROTECT THE PUBLIC IMMED RTAIN A NYS PROF ENG TO EVAL THE ENT FACADE INC PARAPET
#PS30101JL
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#13698
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#06902
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#08745
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#06731
DOB VIOLATION - ACTIVE
May 15, 2014LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
#11748
DOB VIOLATION - ACTIVE
Nov 6, 2003CONSTRUCTION

#0101AH
VIOLATION WORK WITHOUT PERMIT - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
May 15, 2014Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 4:23 PM ET. BBL 3022370009.

Look up another building