4 floors · 136,336 sq ft · built 1943 · class M1 · owner of record: Immaculate Con R C Ch
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (7 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-13 (Accepted). Agency page | Dec 31, 2026 in 47 days | 2 of 7 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 136,336 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2397). Agency page | Dec 31, 2027 in 412 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 18, 2022 | Boilers CLASS - 2 FOUND EXPOSED WIRING, BLANK COIL PLATE BADLY CORRODED, ALL BOILER CLEANOUT DOORS NEED TO BE RESEALED, #39066110X | Dec 6, 2022 ADMIT/IN-VIO | $0 |
| Mar 5, 2018 | Elevators CLASS - 2 67L10,56Y13,40Y02,80M07,39D07,39D07,39I10,41T07,42T07,42M07,53K11, 72X10,42I10. 67-REPAIR IN CAR PHONE; 56-MACHINE LEAKS SEAL; 40-CLEAN OIL; 80-RUNBY SIGNAGE MISSING; 39-DAMAGE T.O.C. LIGHT; 39-SECURE BOX #38261772M | May 8, 2018 IN VIOLATION | $0 |
| Mar 5, 2018 | Elevators CLASS - 2 67L10,39P07,70F07,68B07,68M07,56Y13,59BB07,57BB11. 67-REPAIR IN CAR PHONE; 39-PROVIDE ACCESS TO TOP OF CAR; 70-PROVIDE ACCESS TO PIT; 68- UPDATE MAINT LOG; 68-MISSING MCP; 56-MACHINE LEAKS; 59-EXPIRE BRAKE #38261773Y | Apr 20, 2018 DEFAULT | $0 |
| Jun 4, 2008 | Elevators Non-Hazardous 14M07,28Q03,38X10,38Q03,51M07,59Q03,64Q03,71Q03,84X10. 38-X-10 REPAIR LIGHT ON TOP OF CAR. 38-Q-03 INSTALL GUARD FOR LIGHT ON TOP OF CAR. 51-M-07 PROVIDE SPIN OUT FOR HOIST ROPE. 71-Q-03 INSTALL GUARD FOR LIGHT #38184985J | Aug 1, 2008 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00112 | DOB VIOLATION - ACTIVE |
| Nov 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00138 | DOB VIOLATION - ACTIVE |
| Aug 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00188 | DOB VIOLATION - ACTIVE |
| May 2, 2023 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00402 | DOB VIOLATION - ACTIVE |
| Feb 2, 2021 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00192 | DOB VIOLATION - ACTIVE |
| Nov 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00255 | DOB VIOLATION - ACTIVE |
| Aug 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00499 | DOB VIOLATION - ACTIVE |
| May 2, 2020 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00499 | DOB VIOLATION - ACTIVE |
| Feb 13, 2020 | ELEVATOR #9028/672070 | DOB VIOLATION - ACTIVE |
| Apr 5, 2019 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST #02479 | DOB VIOLATION - ACTIVE |
| Feb 2, 2017 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00106 | DOB VIOLATION - ACTIVE |
| Nov 2, 2016 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00135 | DOB VIOLATION - ACTIVE |
| Aug 2, 2016 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00209 | DOB VIOLATION - ACTIVE |
| Jun 2, 2016 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #00335 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Feb 22, 2024 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2023 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Feb 2, 2021 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| May 2, 2020 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Feb 2, 2017 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Nov 2, 2016 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Aug 2, 2016 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Jun 2, 2016 | Benchmarking - LL84 FTF-EN-BENCH | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 6:59 PM ET. BBL 2023970017.