4 floors · 69,260 sq ft · built 1900 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 696). Agency page | Dec 31, 2026 in 66 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 69,260 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 12, 2026 | Construction CLASS - 2 REISSUE#35657947R FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT CELLAR LEVEL A STEEL CORRIDOR BEAM IS SHOWING SIGNS OF DECAY.REM:COMPLY WITH CODE. #35734285N | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 12, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.3RD FLOOR CORRIDOR DOORS AT STAIR C DONT CLOSE PROPERLY.STAIR A,GYM AND CAFE DOORS,B2 EXIT.REM:COMPLY WITH CODE. #35734286P | Jul 15, 2026 POP/IN-VIO | $0 |
| Jun 12, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO GAS VENTS IN GAS METER ROOM.REM:COMPLY WITH CODE. #35734287R | Jul 15, 2026 POP/IN-VIO | $0 |
| May 2, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPIANT MANNER. NOTED: WATER DAMAGE TO WALLS AND AROUND RMS B-9, B10AND B12, B13. DAMAGE CAUSED BY REGULAR BACK UPS OF SEWER AND STORM WATER FROM PIPES AT THE PIPE CHASE BE #35717358K | Jun 27, 2025 POP/IN-VIO | $0 |
| May 2, 2025 | Construction CLASS - 2 RE-ISSUE #35689078K. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: IN THE BOILER RM AT CELLAR LEVEL, A STEEL GIRDER BEAM IS SHOWING SIGNS OF DECAY. THE CONCRETE ENCASEMENT IS CRACKED AND DETERIO #35717357Z | Jun 27, 2025 POP/IN-VIO | $0 |
| Sep 3, 2024 | Construction CLASS - 2 REISSUED ECB #3567947R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: CELLR BOILER ROOM A METAL BEAM INCASED IN CONCRETE HAS CRACKS AND SPALLING AND IS IN DANGER OF PEELING OFF AND FAILING AND IS #35689078K | Nov 29, 2024 POP/IN-VIO | $0 |
| Jun 5, 2023 | Construction CLASS - 2 REISSUE #3567947R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT CELLAR LEVEL BEAM WITH RUNNING CRACKS AND SPALLING MASONRY ACROSS A 3FT AREA ABOVE BOILER AREA. REMEDY: REPAIR AND/OR REPLACE. #35672947M | Nov 3, 2023 POP/IN-VIO | $0 |
| May 28, 2021 | Construction CLASS - 2 REISSUE35490783H FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER.ATOINOTED@CELLAR BOILERRM MASONRY BEAM@CEILING APPROX7'X13' MASONRY CRACKED&DELAMANTING.COMPLY W/CODE. #35561245X | Nov 3, 2021 POP/IN-VIO | $0 |
| May 22, 2020 | Construction CLASS - 2 REISSUED#35447785H(8/22/19)FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER @ BOILER ROOM CELLAR LEVEL HORIZONTAL CRACKS APPROX 7'& 3' LONGON CONCRETE BEAMS. REMEDY: REPAIR &/OR REPLACE. #35490783H | Jul 6, 2020 POP/IN-VIO | $0 |
| Aug 22, 2019 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER NOTED AT BOILER ROOM CONCRETE BEAM WITH HORIZONTAL CRACKS APPROX 7 FT LONG AND 3FT LONG REPAIR AND/OR REPLACE #35447785H | Jan 29, 2020 POP/IN-VIO | $0 |
| Sep 27, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER NOTED: AT BOILER ROOM, HORIZONTAL CRACKS APPRX 7'LENGTH AND 3'LENGTH AT CENTER CONCRETE BEAM WAS OBSERVED. RMDY: REPAIR AND/OR REPLACE. #35361734K | Jan 14, 2019 POP/IN-VIO | $0 |
| Oct 5, 2005 | Boilers Non-Hazardous 50A. 50A-INSTALL A PERMANENT STAIRWAY OR INCLINED LADDER TO PERMIT SAFE ACCESS TO THE TOP OF THE BOILER AS PER NY STATE CODE (R4-4.6C) 50B-INSULATE BOILER. 50C-PIPE DOWN SAFETY VALVE DISCHARGE TO A SAFE POINT. #32048851J | Nov 21, 2005 WRITTEN OFF | $0 |
| Oct 5, 2005 | Boilers Non-Hazardous 50A/50B/50C. 50A-INSTALL A PERMANENT STAIRWAY OR INCLINED LADDER TO PERMIT SAFE ACCESS TO THE TOP OF THE BOILER AS PER NY STATE CODE (4-6.6C) 50B-INSULATE BOILER. 50C-PIPE DOWN SAFETY VALVE TO A SAFE POINT OF D #32048742K | Nov 21, 2005 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02535 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21410 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21411 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.