Bronx · Block 4647 · Lot 90 · 10467

3617 White Plains Road

2 floors · 2 apartments · 3,474 sq ft · built 1920 · class S2 · owner of record: White Plains Road Holdings Llc

11open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
61dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 61 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-04-11 (Accepted). Agency page

Dec 31, 2026
in 61 days
2 of 2 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 305 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 426 days
Next cycle year 2027

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#04350
DOB VIOLATION - ACTIVE
Apr 23, 1993LOCAL LAW 62/91 - BOILERS

#00602
DOB VIOLATION - ACTIVE
Jan 25, 1990BOILER
36
#32005225M
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
HPD (3) · C 1 · B 1 · A 1
IssuedClassViolationCorrect by
Jul 27, 2026AApt 1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CALKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOct 30, 2026
Jul 27, 2026CApt 1 · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL ELECTRICAL OUTLETS AND ALL FIXTURE. IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 2, 2026
Jul 27, 2026BApt 1 · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 31, 2026

Issued in the last 120 days

DateSourceWhatNow
Jul 27, 2026HPD A§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CALKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 27, 2026HPD C§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ALL ELECTRICAL OUTLETS AND ALL FIXTURE. IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 27, 2026HPD B§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 31, 2026, 3:27 PM ET. BBL 2046470090.

Look up another building