3 floors · 39,181 sq ft · built 1930 · class W2 · owner of record: St Vincent Ferrer R C C
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 48 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,181 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 169 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 169 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 413 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-07 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 23, 2026 | Construction CLASS - 2 REISSUE ECB#35692015K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 3RD FL STAIR C WALL CRACKED/BULDGING.REM:REPAIR AND/OR REPLACE. #35732472J | Jun 1, 2026 POP/IN-VIO | $0 |
| Apr 21, 2025 | Construction CLASS - 2 RE-ISSUE #35678818N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: ON THE THIRD FLOOR STAIRWAY C THERE ARE CRACKS ON THE WALL. REMEDY: REPAIR AND/OR REPLACE. #35692015K | May 22, 2025 POP/IN-VIO | $0 |
| Mar 27, 2024 | Construction CLASS - 2 REISSUE#35673055L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT TIME OF MY INSPECTION I OBSERVED AT THE 3RD FLOOR A CRACK ACROSS THE WALL APPROXIMATELY 9 FEET LONG AND 1 INCH WIDE RUN FROM ABOV #35678818N | May 3, 2024 POP/IN-VIO | $0 |
| Mar 22, 2023 | Construction CLASS - 2 REISSUE #35657806N FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:OBSERVED DURING INSPECTION OF STAIRWELL C 3RD FL CRACK ACROSS WALL APROX 9 FT LONG 1 INCH WIDE.REMEDY:REPAIR AND/OR REPLACE #35673055L | Jun 21, 2023 POP/IN-VIO | $0 |
| May 12, 2022 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT 3RD FLOOR LEVEL STAIRWELL C,THERE IS A LONG RUNNING CRACK THAT RUNS FROM ABOVE THE SMOKE DOUBLE DOORS TO THE STOPS HEADING TO THE ROOF.REMEDY:REPAI #35657806N | Oct 26, 2022 POP/IN-VIO | $0 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 5:38 PM ET. BBL 3075640047.