4 floors · 2 apartments · 2,510 sq ft · built 1905 · class S2 · owner of record: Taveras, Rosa
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2022-11-09 (Accepted). Agency page | Dec 31, 2026 in 63 days | 1 of 1 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO24-03042 AND ECB 39160080P., COMPLY WITH COMMISSIONER'S ORDER #39205407Y | Dec 2, 2026 PENDING | $2,500 |
| Sep 11, 2025 | Construction CLASS - 1 "FAILURE TO MAINTAIN THE BUILDING IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, THE CELLAR REAR WALL WAS OBSERVED TO BE DEFECTIVE, WITH MISSING AND DAMAGED CMU BLOCKS, INCLUDING AN OPENING MEASURING AP #39160080P | Nov 19, 2025 DEFAULT | $25,000 |
| Nov 26, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. PREMISES IS A 3 STORY MIXED USE BUILDING. CELLAR REAR WALL IS DEFECTIVE WITH CMU BLOCKS LOOSE MISSING AND DEFECTIVE. WALL IS BULGING AND IN A STATE OF DI #39131438H | Oct 20, 2025 DEFAULT | $3,125 |
| Apr 27, 2006 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG. WALL. AT GROUND FLOOR OVER ENTRANCEBRICK MASONRY IS BULGED AND DISPLACED. REMEDY: MAKE SAFE IMMEDIATELY/ MAKE ALL NECESSARY REPAIRS. #34509995K | May 21, 2007 WRITTEN OFF | $0 |
| Dec 1, 2005 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG WALL*HAZARDOUS*NOTED:AT GROUND FLR OVER ENTRANCE BRICK MASONRY BULGED,CRACKED,DISPLACED & IN DANGER OF COLLAPSE.REMEDY:PROVIDE PROTECTION & MAKE SAFE IMMEDIATELY OBTAIN PERMITS #34501700H | May 21, 2007 WRITTEN OFF | $0 |
| Sep 2, 2005 | Construction Non-Hazardous FAILURE TO MAINTAIN EXTERIOR BUILDING WALL NOTED:CEMENTITIONS MASONRY MATERIAL ON THE FRONT FACADE OVER ENTIRE DOOR IS CRACKED AND BULGING REMEDY:REPAIR AND / OR REPLACE ALL DEFECTS #34487448R | May 21, 2007 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #10439 | DOB VIOLATION - ACTIVE |
| Nov 26, 2024 | CONSTRUCTION PREMISES IS A 3 STORY MIXED USE BUILDING. CELLAR REAR WALL IS DEFECTIVE WITH CMU BLOCKS MISSING AND DEFECTIVE. WALL IS BULGING AND IN A STATE OF DISREPAIR #24-03042 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #09379 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #09757 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #31647 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #09902 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #12260 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #11659 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #11735 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #12716 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #16811 | DOB VIOLATION - ACTIVE |
| Jan 3, 2008 | LOCAL LAW 62/91 - BOILERS #16899 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 3, 2008 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 23, 2017 | C | § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING A DOUBLE CYLINDER KEY OPERATED LOCK AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Oct 31, 2017 |
| Jun 30, 2008 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALL OF 1ST STY PUBLIC HALL. | Oct 3, 2008 |
| Jun 30, 2008 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WALLS & CEILING OF BULKHEAD. | Oct 3, 2008 |
| Jun 30, 2008 | B | SECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ARTICLES, 3RD STY., PUBLIC HALL. | Aug 4, 2008 |
| Jun 30, 2008 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED WIRING AT CEILING LIGHT IN BULKHEAD. | Aug 4, 2008 |
| Jun 30, 2008 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED WIRING AT CEILING LIGHT 2ND STY PUBLIC HALL. | Aug 4, 2008 |
| Jun 30, 2008 | B | SECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF WALLS & CEILING OF BULKHEAD. | Aug 4, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 24, 2026 | ECB | Construction: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER FOR DOB VIO24-03042 AND ECB 39160080P., COMPLY WITH COMMISSIONER'S ORDER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 10:36 AM ET. BBL 3020450099.