5 floors · 11 apartments · 7,902 sq ft · built 1915 · class C1 · owner of record: Shg 3606 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 412 days | Next cycle year 2027 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 20, 2026 | B | § 27-2039 ADM CODE PROVIDE ADEQUATE LIGHT OF NOT LESS THAN 60 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION AT 2ND STORY PUBLIC HALLWAY AT PUBLIC HALL, 2nd STORY | Aug 24, 2026 |
| Jun 1, 2026 | A | Apt 3B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN THE KITCHEN LOCATED AT APT 3B, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 4, 2026 |
| Sep 9, 2024 | C | Apt 1A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 5, 2024 |
| Aug 16, 2024 | B | Apt 4C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 4C, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST | Sep 20, 2024 |
| Jan 15, 2024 | C | Apt 1A · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 14, 2024 |
| Jan 15, 2024 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Jan 21, 2024 |
| Dec 11, 2023 | B | Apt 4A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 15, 2024 |
| Dec 11, 2023 | B | Apt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE KITCHEN LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH | Jan 15, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Open |
| Jul 20, 2026 | HPD B | § 27-2039 ADM CODE PROVIDE ADEQUATE LIGHT OF NOT LESS THAN 60 WATTS INCANDESCENT OR EQUIVALENT ILLUMINATION AT 2ND STORY PUBLIC HALLWAY AT PUBLIC HALL, 2nd STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 9:10 AM ET. BBL 2046610043.