Manhattan · Block 1033 · Lot 1 · 10036

360 West 43 Street

23 floors · 256 apartments · 249,052 sq ft · built 2002 · class D6 · owner of record: 42/9 Residential Llc

28open violations
$625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
48dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 48 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 48 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 48 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 64 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 249,052 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 169 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 169 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 292 days
Registered through 2027-09-01
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $102,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 831 days
Filing window not open yet
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1033). Agency page

Dec 31, 2033
in 2605 days
Next due 2033
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-10 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $625 owed
IssuedViolationHearingBalance
Nov 5, 2026Elevators CLASS - 2
VF.... ELEVATOR IN BUILDING OUT OF SERVICE . UPON INSPECTION THE DEVICE IS FOUND TO BE OUTOF SERVICE ... REPAIR THE DEVICE AND RESTORE TO SERVICE IMMEDIATELY....REINSPECTION REQUIRED....IRCNY 11-02.....
#39210748Z
Jan 14, 2027
PENDING
$625
Jun 20, 2017Unknown CLASS - 2
FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000005681 HASBEEN INSPECTED,TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED,BY NOVEMBER,1,2016.REM:FILE ANNUAL CERT
#37002544H
Oct 12, 2017
IN VIOLATION
$0
Feb 6, 2014Construction CLASS - 2
FAILURE TO MAINTAIN FACADE AND APPURTENANCES IN CODE COMPLIANT MANNER.NOTED: AT FACADE, AT ALL EXPOSURES BROKEN AND CRACKED CONCRETE SLAB EDGES WERE OBSERVED. ALSO CRACKED BRICKS AND MORTAR JOINTS WERE OBSERV
#35024297Y
Jun 26, 2014
IN VIOLATION
$0
Nov 16, 2013Unknown CLASS - 2
WORK W/O PERMIT. NOTED: AT GARAGE,INSTALLED TEN CAR LIFTS. CAR LIFTS ARE COMPLETE,ACTIVE & IN USE. REMEDY: OBTAIN PERMIT.
#35033570K
Jan 2, 2014
ADMIT/IN-VIO
$0
DOB (4)
IssuedViolationStatus
Mar 18, 2021FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
#00189
DOB VIOLATION - ACTIVE
Mar 20, 2020HAZARDOUS CONDITION (FACADE)
CYCLE 9C UNSAFE REPORT FILED
#909221
DOB VIOLATION - ACTIVE
Mar 18, 2020FACADE SAFETY PROGRAM
UNSAFE REPORT WAS FILED
#HAZ88855
DOB VIOLATION - ACTIVE
May 30, 2014(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
#08488
DOB VIOLATION - ACTIVE
DOB NOW Safety (20)
IssuedViolationStatus
Nov 25, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
Active
Nov 25, 2024Parking Structures FTF-PS-INITL
Failure to file sub cycle 1A compliance report by 12/31/2023
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Mar 18, 2021Facades FISPFCS
CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
Active
Mar 20, 2020Facades FISPHAZ
CYCLE 9C UNSAFE REPORT FILED
Active
Mar 18, 2020Facades FISP
UNSAFE REPORT WAS FILED
Active
May 30, 2014Elevators ACC1
Active
May 30, 2014Elevators ACC1
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Nov 5, 2026ECBElevators: VF.... ELEVATOR IN BUILDING OUT OF SERVICE . UPON INSPECTION THE DEVICE IS FOUND TO BE OUTOF SERVICE ... REPAIR THE DEVICE AND RESTORE TO SERVICE IMMEDIATELY....REINSPECTION REQUIRED....IRCNY 11-02.....Open
Oct 16, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT S4P, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHClosed
Aug 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT S9C, 9th STORY, 4th APARTMENT FROM EAST AT SOUTHClosed
Aug 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT S9D, 9th STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Aug 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT S8E, 8th STORY, 2nd APARTMENT FROM WEST AT NORTHClosed
Aug 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT S9E, 9th STORY, 2nd APARTMENT FROM WEST AT NORTHClosed
Aug 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST LOCATED AT APT S4P, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHClosed
Aug 13, 2026HPD C§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF (FIRE DAMAGE) WALLS,CEILING AND FLOORS. BROKEN WINDOW IN THE ENTIRE APARTMENT LOCATED AT APT S9F, 9th STORY, 3rd APARTMENT FROM WEST AT NORTHClosed
Aug 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT S7G, 7th STORY, 1st APARTMENT FROM WEST AT NORTHClosed
Aug 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 2nd ROOM FROM EAST LOCATED AT APT S5E, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 13, 2026, 10:49 PM ET. BBL 1010330001.

Look up another building