3 floors · 149,945 sq ft · built 1956 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1316). Agency page | Dec 31, 2026 in 68 days | Due this year |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 149,945 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-01 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 23, 2026 | Construction CLASS - 2 REISSUE#35717263H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.BULKHEAD HAS SPALLING,WATER DAMAGE.REM:COMPLY WITH CODE. #35734299Y | Aug 5, 2026 POP/IN-VIO | $0 |
| Jun 23, 2026 | Construction CLASS - 2 REISSUE#35717264J FAILIURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER CORRIDOR DOORS NOT SELF CLOSING ON ALL FLOORS GYM,AUDITORIUM,CAFE AND BASEMENT.REM:COMPLY WITH CODE. #35734298M | Aug 5, 2026 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 REISSUE: 35682793H-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER; DOORS NOT SELF-CLOSING AT VARIOUS LOCATIONS, 3RD FL. CORRIDORS BY 3-7, 324, 2ND FL. 207, 219, 202, 242 1ST FLOOR ENTRANCE. REMEDY: COMPL #35717264J | Jul 15, 2025 POP/IN-VIO | $0 |
| May 13, 2025 | Construction CLASS - 2 REISSUE: 35682794J-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: BULKHEAD A, 2 AND 6 3RD FLOOR RM313A, HAS SPALLING. REMEDY: COMPLYWITH CODE. #35717263H | Jul 14, 2025 POP/IN-VIO | $0 |
| Jun 13, 2024 | Construction CLASS - 2 REISSUE#35674952Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED AT THE ROOF LEVEL BULKHEAD#1A, 2AND 6 AND 3RD FLOOR ROOM THE 323A HAS SPALLING PAINT/PLASTER FULL OF W #35682794J | Aug 21, 2024 POP/IN-VIO | $0 |
| Jun 13, 2024 | Construction CLASS - 2 REISSUE#35674953H FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT TIME OF MY INSPECTION I OBSERVED AT THE 3RD FLOOR CORRIDORS BY 307,324 2ND FLOOR CORRIDORS BY 207,219 ROOM 202,242 1ST FLOOR ENTRANCE T #35682793H | Aug 21, 2024 POP/IN-VIO | $0 |
| Apr 11, 2023 | Construction CLASS - 2 REISSUE#35643589Z NOTED:AT 3RD FLOOR CORRIDOR BY 307,324,2ND FLOOR CORRIDOR BY 207,219,ROOM 201,242,1ST FLOOR STAIR D,F,G,CORRIDOR BY 107,GYMNASIUM ENTRANCE,AUDITORIUM LEFT AND RIGHT STAGE,BASEMENT LEVEL CAFETE #35674953H | Jul 5, 2023 POP/IN-VIO | $0 |
| Apr 11, 2023 | Construction CLASS - 2 REISSUE#35643590X NOTED:AT ROOF LEVEL BULKHEAD#1 & 2,5 & 6 AND 3RD FLOOR ROOM#323A HAS SPALLING PAINT/PLASTER AND WATER STAIRS IN VARIOUS AREAS THROUGHOUT.REM:REPAIR AND/OR REPLACE. #35674952X | Jul 5, 2023 POP/IN-VIO | $0 |
| Jun 6, 2022 | Construction CLASS - 2 RE-ISSUED#35582202Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL BULKHEAD 1&2 AND 5&6(3RD FL) WATER PENETRATION AT RM#323A. DAMAGE CEILINGS,WALLS W/ SPALLI #35643590X | Nov 2, 2022 POP/IN-VIO | $0 |
| Jun 6, 2022 | Construction CLASS - 2 RE-ISSUED#35582203K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION NOTED:2ND FL HALLWAY DOOR NEAR RM#219 AND 1ST FL STAIR D,AND ALSO GYM DOOR ARE NOT WORKING PROPERLY. REMEDY:REPAI #35643589Z | Nov 2, 2022 POP/IN-VIO | $0 |
| Jun 15, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT(ROOF LEVEL)BULKHEAD 1&2(2ND FL)HALLWAY DOOR NEAR RM 219(1ST FL)STAIR D,EXITS 2,3,7,GYM(BASEMENT)EXIT G BY RM B10 DOORS ARE IN DISREPAIR/RACKED. #35582203K | Nov 17, 2021 POP/IN-VIO | $0 |
| Jun 15, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: A(ROOF LEVEL)BULKHEADS 1&2/5&6(3RD FL)ROOM 323A WATER PENETRATION/DAMAGE TO CEILINGS,WALLS W/SPALLING PLASTER/PAINT. REMEDY: REPAIR &/OR REPLACE. #35582202Z | Nov 17, 2021 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02675 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 9) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 1:42 PM ET. BBL 3013160015.