4 floors · 49,000 sq ft · built 1935 · class O5 · owner of record: 36 Waverly Studios, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 31, 2026 | Construction CLASS - 1 OBSERVED ON THE TOP OF THE FOURTH FLOOR AT 28 WAVERLY AVE. BROOKLYN UNPERMITTED STEEL FRAMEWORK HAS BEEN DONE APPROXIMATELY 12'X12'X15' HIGH. WORK IS APPROXIMATELY 50% COMPLETED. NO PERMIT FOR THIS SCOPE OF WOR #39202375P | Nov 4, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Mar 31, 2014 | ELEVATOR #VCAT105138 | DOB VIOLATION - ACTIVE |
| Oct 1, 2012 | ELEVATOR #VCAT102655 | DOB VIOLATION - ACTIVE |
| Oct 1, 2012 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST #02655 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | ELEVATOR #VCAT102887 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST #02887 | DOB VIOLATION - ACTIVE |
| Oct 8, 2010 | ELEVATOR ANNUAL INSPECTION / TEST #03625 | DOB VIOLATION - ACTIVE |
| Feb 27, 2009 | LOCAL LAW 10/81 - ELEVATOR #02249 | DOB VIOLATION - ACTIVE |
| Mar 21, 2008 | LOCAL LAW 10/81 - ELEVATOR #02601 | DOB VIOLATION - ACTIVE |
| Nov 19, 2004 | LOCAL LAW 10/81 - ELEVATOR #02299 | DOB VIOLATION - ACTIVE |
| Apr 21, 2004 | LOCAL LAW 10/81 - ELEVATOR #02557 | DOB VIOLATION - ACTIVE |
| Dec 1, 1998 | ELEVATOR 3F2876 #9011/301794 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #223365 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #223363 | DOB VIOLATION - ACTIVE |
| Apr 17, 1995 | LOCAL LAW 10/81 - ELEVATOR #02908 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #19909 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #19908 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 7, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 7, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | ECB | Construction: OBSERVED ON THE TOP OF THE FOURTH FLOOR AT 28 WAVERLY AVE. BROOKLYN UNPERMITTED STEEL FRAMEWORK HAS BEEN DONE APPROXIMATELY 12'X12'X15' HIGH. WORK IS APPROXIMATELY 50% COMPLETED. NO PERMIT FOR THIS SCOPE OF WOR | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 7:42 PM ET. BBL 3018730045.