2.5 floors · 2 apartments · 1,454 sq ft · built 1910 · class B2 · owner of record: Zack Troutman Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 24, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER ORDER 092226CE30401NB, DATED 9/24/26 UNDER COMPLAINT # 3A82171. EMERGENCY STABILIZATION WORK OBSERVED IN PROGRESS WITH THE DESIGNATED CONSTRUCTION SUPERINTENDENT NOT PRESENT #39205678X | Dec 2, 2026 PENDING | $6,250 |
| Sep 23, 2026 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER ORDER 092226CE30401NB, DATED 9/23/26 UNDER COMPLAINT # 3A81787. EMERGENCY STABILIZATION WORK OBSERVED IN PROGRESS WITH THE DESIGNATED CONSTRUCTION SUPERINTENDENT NOT PRESENT #39205488P | Dec 2, 2026 PENDING | $2,500 |
| Sep 18, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR IN A SAFE CODE-COMPLIANT CONDITION. AT TIME OF INSPECTION OBSERVED DETERIORATED EXTERIOR BRICK MASONRYAT FRONT FACADE IN EXP #01 INCLUDING CRACKED/DETERIORATED MORTAR JOINT #35721962Z | Nov 25, 2026 PENDING | $2,500 |
| May 6, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED AT THE BASEMENT LEVEL THEY IS AN UNPERMITTED/UNDOCUMENTED EXCAVATION WORK IN PROGRESS THROUGHOUT THE ENTIRE BASEMENT, WITHOUT A PERMIT NEED TO OBTAIN A VALID PERMIT OR DIS #39187397N | Jul 15, 2026 DEFAULT | $12,500 |
| May 6, 2026 | Construction CLASS - 1 ATOI OBSERVED STRUCTURAL WAS PERFORMED AND THERE WAS MISSING SAFETY REQUIREMENTS TO SAFEGUARD PUBLIC AND PROPERTY. 1- MISSING CONSTRUCTION FENCE AS PER BC3307.7, 2 MISSING GUARD RAILS, 3- NO WEATHERPROOFING FOR #39187395J | Jul 15, 2026 DEFAULT | $25,000 |
| May 6, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED THEY ARE DOING AN UNPERMITTED/UNDOCUMENTED ILLEGAL DEMOTION WORK THROUGHOUT THE ENTIRE INTERIOR OF THE BUILDING ON ALL FLOORS, WITHOUT A PERMIT NEED TO OBTAIN A VALID PERM #39187396L | Jul 15, 2026 DEFAULT | $12,500 |
| May 6, 2026 | Construction CLASS - 1 WORK WITHOUT A PERMIT: ATOI I OBSERVED AT THE REAR OF THIS AT EXPOSURE#3 AN UNPERMITTED/UNDOCUMENTED STEEL FRAME EXTENSION, WAS ILLEGALLY ERECTED APPROX. SIZE 30FT IN WIDTH BY 35FT IN LENGTH BY 12FT IN HIGHT, W #39187394H | Jul 15, 2026 DEFAULT | $12,500 |
| Issued | Violation | Status |
|---|---|---|
| Sep 22, 2026 | CONSTRUCTION EMERGENCY WORK.UNPERMITTED ALT OF 2ST+A+B WOOD FRAMED BLDG, STRUCTURALLY COMPROMISED. EXP 1 FACADE DELAMINATING.REMEDY:RETAIN PE, CS, GC TO STABILZE & PROTECT SITE, PUBLIC.START 8AM, 9/23/26.FULLTIME ONSITE PE&CS.DAILY PE REPORTS #CE30401NB | DOB VIOLATION - ACTIVE |
| Sep 21, 2026 | IMMEDIATE EMERGENCY REMEDY: RECOMMEND A TOTAL OF 65 LINEAR FEET OF FENCE BE INSTALLED TO ENCLOSE BUILDING FRONT TO PROTECT PEDESTRIANS FROM ENTERING A COLLAPSE ZONE. WITH FENCE INSTALLED 20 FEET OUT FROM FACADE ENCOMPASSING SIDEWALK TO THE STREET RUNNING 25 FEET ERECTED ALONG FRONT OF FACADE #20602 | DOB VIOLATION - ACTIVE |
| Sep 18, 2026 | CONSTRUCTION UNPERMITTED PARTIAL DEMO & ALT OF 2ST+B WOOD FRAMED RESIDENTIAL.BLDG POTENTIALLY STRUCTURALLY COMPROMISED.EXP 1 WALL IS.DELAMINATING REMEDY:RETAIN NYS PE&GC TO EVAL, STAB. & MONITOR SITE.PROVIDE REPORT &SKETCHES BY 11AM 9/21/26.COMMENCE STAB. WORK BY 9/23/26 #CE30401NB | DOB VIOLATION - ACTIVE |
| May 6, 2026 | CONSTRUCTION ATOI I OBSERVED AT THE REAR OF THIS BUILDING AT EXPOSURE#3AN UNPERMITTED /UNDOCUMENTED STEEL FRAME EXTENSION WAS ILLEGALLY ERECTED APPROX. SIZE 30FT IN WIDTH BY 35FT IN LENGTH BY 12FT IN HEIGHT WITHOUT A PERMIT. #26-01228 | DOB VIOLATION - ACTIVE |
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 24, 2026 | ECB | Construction: FAILURE TO COMPLY WITH COMMISSIONER ORDER 092226CE30401NB, DATED 9/24/26 UNDER COMPLAINT # 3A82171. EMERGENCY STABILIZATION WORK OBSERVED IN PROGRESS WITH THE DESIGNATED CONSTRUCTION SUPERINTENDENT NOT PRESENT | Open |
| Sep 23, 2026 | ECB | Construction: FAILURE TO COMPLY WITH COMMISSIONER ORDER 092226CE30401NB, DATED 9/23/26 UNDER COMPLAINT # 3A81787. EMERGENCY STABILIZATION WORK OBSERVED IN PROGRESS WITH THE DESIGNATED CONSTRUCTION SUPERINTENDENT NOT PRESENT | Open |
| Sep 22, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK.UNPERMITTED ALT OF 2ST+A+B WOOD FRAMED BLDG, STRUCTURALLY COMPROMISED. EXP 1 FACADE DELAMINATING.REMEDY:RETAIN PE, CS, GC TO STABILZE & PROTECT SITE, PUBLIC.START 8AM, 9/23/26.FULLTIME ONSITE PE&CS.DAILY PE REPORTS | Open |
| Sep 21, 2026 | DOB | IMMEDIATE EMERGENCY: REMEDY: RECOMMEND A TOTAL OF 65 LINEAR FEET OF FENCE BE INSTALLED TO ENCLOSE BUILDING FRONT TO PROTECT PEDESTRIANS FROM ENTERING A COLLAPSE ZONE. WITH FENCE INSTALLED 20 FEET OUT FROM FACADE ENCOMPASSING SIDEWALK TO THE STREET RUNNING 25 FEET ERECTED ALONG FRONT OF FACADE | Open |
| Sep 18, 2026 | DOB | CONSTRUCTION: UNPERMITTED PARTIAL DEMO & ALT OF 2ST+B WOOD FRAMED RESIDENTIAL.BLDG POTENTIALLY STRUCTURALLY COMPROMISED.EXP 1 WALL IS.DELAMINATING REMEDY:RETAIN NYS PE&GC TO EVAL, STAB. & MONITOR SITE.PROVIDE REPORT &SKETCHES BY 11AM 9/21/26.COMMENCE STAB. WORK BY 9/23/26 | Open |
| Sep 18, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING EXTERIOR IN A SAFE CODE-COMPLIANT CONDITION. AT TIME OF INSPECTION OBSERVED DETERIORATED EXTERIOR BRICK MASONRYAT FRONT FACADE IN EXP #01 INCLUDING CRACKED/DETERIORATED MORTAR JOINT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 12:31 PM ET. BBL 3031830019.