Queens · Block 821 · Lot 32 · 11105

36-10 Ditmars Boulevard

3 floors · 2 apartments · 3,480 sq ft · built 1930 · class S2 · owner of record: Vagenas Nicholas

9open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
70dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 70 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page

Dec 31, 2026
in 70 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 314 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 801 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#26950
DOB VIOLATION - ACTIVE
Jun 28, 1993LOCAL LAW 62/91 - BOILERS

#13913
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Mar 26, 2002Boiler LL6291
Active
Jun 28, 1993Boiler LL6291
Active
HPD (5) · C 0 · B 1 · A 4
IssuedClassViolationCorrect by
Aug 13, 2008ASECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKING DEVICE VESTIBULE TO 1 STY. PUBLIC HALL DOOR. (D28783HNov 16, 2008
Aug 13, 2008ASECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE MAIL BOX 1 STY PUBLIC HALL.Nov 16, 2008
Aug 13, 2008ASECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE - LOCKING DEVICE VESTIBULE TO 1ST STY. PUBLIC HALL R 11PNov 16, 2008
Aug 13, 2008ASECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE - MAIL BOX 1ST STY. VESTIBULE PUBLIC HALL R12PNov 16, 2008
Jun 6, 2007BSECTION 27-2005, 2007 ADMIN. CODE: REMOVE ALL ENCUMBRANCES CONSISTING OF STORAGE OF BOXES AND DISUSED PLUMBING FIXTURES AT PUBLIC HALL, 3rd STORYJul 24, 2007

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 22, 2026, 10:08 PM ET. BBL 4008210032.

Look up another building