6 floors · 10,980 sq ft · built 1920 · class O2 · owner of record: Markey 1907 Inc.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 10, 2026 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT A PERMIT. AT THE TIME OF INSPECTION OBSERVED ILLUMINATED SIGN APPROXIMATELY 30 INCHES X14 INCHES INSTALLED AT GROUNDFLOOR LEVEL "WEED DISPENSARY" SECURED TO THE FIRE ESCAPE DROP LADDER. #35725761K | Oct 16, 2026 DEFAULT | $2,530 |
| Feb 10, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED FIRE ESCAPE DROP LADDER BEING OBSTRUCTED BY ADVERTISEMENT BANNER SECURED TO THE HANDRAIL AND ILLUMINATED SIGN STRAPPED #35725762M | Mar 19, 2026 DEFAULT | $12,500 |
| Nov 25, 2025 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 35677089H ISSUED ON 07/23/2024 FOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, FILE A CERTIFICATE OF CORRECTION #39168277P | Jan 29, 2026 DEFAULT | $6,250 |
| Nov 25, 2025 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 35681254Y ISSUED ON 09/04/2024 FOR OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPARTMENT RECORDS, FILE A CERTIFIC #39168279Z | Jan 29, 2026 DEFAULT | $6,250 |
| Nov 25, 2025 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION # 35677090P ISSUED ON 07/23/2024 AND # 35681255X ISSUED ON 09/04/2024 FOR FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER, FILE A CERTIFICATE OF CO #39168278R | Jan 29, 2026 DEFAULT | $6,250 |
| Sep 4, 2024 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER,PER 28-207.4.NOTED:AT TIME OF INSPECTION AT 3RD FLOOR HAS BEEN REOCCUPIED AS A BROTHEL/HOUSE OF PROSTITUTION THERE BY DISOBEYING ACTIVE VACATE ORDER#M181/201 #35681255X | Nov 14, 2024 DEFAULT | $25,000 |
| Sep 4, 2024 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE DEPT OF BUILDINGS RECORDS.ILLEGAL OCCUPANCY NOTED:AT 3RD FLOOR HAS BEEN CONVERTED/OCCUPIED AS HOUSE OF PROSTITUTION/BROTHEL KNOWN AS PARADISE SPA OFFERING SEX SERVICE A #35681254Y | Nov 14, 2024 DEFAULT | $25,000 |
| Jul 23, 2024 | Construction CLASS - 1 FAILURE TO OBEY A VACATE ORDER FROM THE COMMISSIONER,PER 28-207.4.NOTED:AT 3RD FLOOR HAS BEEN REOCCUPIED AS MASSAGE PARLOR DESPITE ACTIVE VACATE ORDER M181/2019 ISSUED ON 11/22/2019.REM:COMPLY WITH VACATE ORDER #35677090P | Sep 26, 2024 IN VIOLATION | $4,800 |
| Jul 23, 2024 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:FAILURE TO PROVIDE REQUIRED NATURAL LIGHT AND VENTILATION FOR EVERY BEDROOM.NOTED:AT 3RD FLOOR HAVING CREATED 2 SLEEPING QUARTERS,ONE SLEEPING QUARTER WITHO #35677089H | Feb 4, 2025 IN VIOLATION | $1,250 |
| Jul 23, 2024 | Zoning CLASS - 2 ILLEGAL USE IN A COMMERCIAL DISTRICT.UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT A PROHIBITED USE PER ZR 12-10 OPERATING IN A CF7A DISTRICT ON 3RD FLOOR.NOTED:A MASSEUSE OFFER TO PERFORM A FULL BODY MASSAGE/SEX #35677087Y | Feb 4, 2025 IN VIOLATION | $1,250 |
| Aug 30, 2023 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS. ILLEGAL OCCUPANCY NOTED: 3RD FLOOR ILLEGALLY OCCUPIED/OPERATING AS AN UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT KNOWN AS "PARADISE SPA" WITH 5 MASSAGE ROOMS. #35673246Y | Nov 9, 2023 IN VIOLATION | $625 |
| Aug 30, 2023 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTED: CREATED FULL HEIGHT PARTITION TO CREATE 5 MASSAGE ROOMS. WATER AND WASTE LINES INSTALLED TO CREATE 4 3 PC BATHROOMS, 2 WASHING MACHINE (ELECTRICAL WORK) AND 1 ADDITIONAL SINK. REME #35673247X | Aug 15, 2024 IN VIOLATION | $1,250 |
| Aug 30, 2023 | Zoning CLASS - 2 ILLEGAL USE IN A COMMERCIAL DISTRICT. UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT, A PROHIBITED USE PER ZR 12-10 OPERATING IN A C1-7A ZONING DISTRICT ON THE 3RD FLOOR KNOWN AS "PARADISE SPA" WITH 5 MASSAGE ROOM #35673245M | Nov 9, 2023 IN VIOLATION | $625 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472746J ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546813J | Jul 14, 2022 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472647Y ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554137N | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472639Y ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554145N | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472735Y ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546824P | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472647N ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554143J | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472643R ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554141X | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472738J ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546821J | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450501Y ISSUED ON 10/04/19 PURSUANT TO 282012;282044 #35580764L | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472729H ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554130K | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472754J ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546804H | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450367M ISSUED ON 10/04/19 PURSUANT TO 282012;282044 #35580773N | May 19, 2022 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450368Y ISSUED ON 10/04/19 PURSUANT TO 282012;282044 #35580772L | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472747L ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546812H | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35417748L ISSUED ON 5/15/2019 PURSUANT TO 28-201.2;28 #35546996L | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472728X ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554131M | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450364R ISSUED ON 10/4/2019 PURSUANT TO 28-201.2;28 #35510867K | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35455136H ISSUED ON 11/22/19 PURSUANT TO 282012;282044 #35580755J | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35373682X ISSUED ON 12/21/2018 PURSUANT TO 28-201.2;2 #35546998P | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450362N ISSUED ON 10/4/2019 PURSUANT TO 28-201.2;28 #35510869Y | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450521L ISSUED ON 10/15/19 PURSUANT TO 282012;282044 #35580758P | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472644Z ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554140Y | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472752X ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546806L | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35455141M ISSUED 11/22/2019 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35580750K | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35418056P ISSUED ON 5/15/2019 PURSUANT TO 28-201.2;28 #35510871N | Jul 14, 2022 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472745H ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546814L | Jul 21, 2022 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472736X ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546823N | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35455139N ISSUED ON 11/22/19 PURSUANT TO 282012;282044 #35580752Y | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450520J ISSUED ON 10/15/19 PURSUANT TO 282012;282044 #35580759R | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472743Y ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546816P | May 19, 2022 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450503H ISSUED ON 10/04/19 PURSUANT TO 282012;282044 #35580760Y | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472645K ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554139R | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35418057R ISSUED ON 5/15/2019 PURSUANT TO 28-201.2;28 #35510870L | Jul 21, 2022 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472648X ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554136L | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35455137J ISSUED ON 11/22/19 PURSUANT TO 282012;282044 #35580754H | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472642P ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554142H | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472734M ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554125X | May 19, 2022 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472757Y ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546807N | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472756N ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546802Y | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450504J ISSUED ON 10/04/19 PURSUANT TO 282012;282044 #35580762H | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472640Z ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554144L | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472734R ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554128L | Feb 27, 2023 DEFAULT | $6,250 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35373626L ISSUED ON 12/20/2018 PURSUANT TO 28-201.2;2 #35580805Z | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35450522N ISSUED ON 10/15/19 PURSUANT TO 282012;282044 #35580757N | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472750M ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546808P | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472730P ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35554129N | May 19, 2022 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS FOR VIOLATING CONDITIONS CITED IN VIOLATION#35373681Y ISSUED ON 12/21/2018 PURSUANT TO 28-201.2;2 #35546999R | Feb 27, 2023 DEFAULT | $3,125 |
| Jun 2, 2021 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER TO FILE A CERT OF CORRECTION W/THE DEPT OF BLDGS. FOR VIOLATING CONDITIONS CITED IN VIO#35472749P ISSUED 02/18/2020 PURSUANT TO 28-201.2;28-204.4;1RCNY 102-01. REMEDY: FILE #35546810Y | May 19, 2022 DEFAULT | $3,125 |
Showing 60 of 209. Full list on the agency site.
| Issued | Violation | Status |
|---|---|---|
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00056 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00055 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00054 | DOB VIOLATION - ACTIVE |
| Feb 19, 2020 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00053 | DOB VIOLATION - ACTIVE |
| Nov 27, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00045 | DOB VIOLATION - ACTIVE |
| Mar 6, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00035 | DOB VIOLATION - ACTIVE |
| Mar 6, 2019 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00042 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #01030 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #00965 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #01112 | DOB VIOLATION - ACTIVE |
| Jun 1, 2016 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00227 | DOB VIOLATION - ACTIVE |
| Oct 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST #00433 | DOB VIOLATION - ACTIVE |
| Mar 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST #00703 | DOB VIOLATION - ACTIVE |
| Oct 1, 2012 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST #00569 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST #00552 | DOB VIOLATION - ACTIVE |
| Oct 8, 2010 | ELEVATOR ANNUAL INSPECTION / TEST #00770 | DOB VIOLATION - ACTIVE |
| Jan 4, 2007 | ELEVATOR #9444/183386 | DOB VIOLATION - ACTIVE |
| Dec 7, 2005 | ELEVATOR #94441149539 | DOB VIOLATION - ACTIVE |
| Mar 3, 2005 | ELEVATOR #9444/122652 | DOB VIOLATION - ACTIVE |
| Oct 15, 2002 | ELEVATOR #1P24143 | DOB VIOLATION - ACTIVE |
| Jan 6, 1998 | LOCAL LAW 10/81 - ELEVATOR #00419 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #09540 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #00519 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #00519 | DOB VIOLATION - ACTIVE |
| Mar 8, 1996 | LOCAL LAW 10/81 - ELEVATOR #00442 | DOB VIOLATION - ACTIVE |
| Apr 17, 1995 | LOCAL LAW 10/81 - ELEVATOR #00583 | DOB VIOLATION - ACTIVE |
| May 31, 1994 | LOCAL LAW 10/81 - ELEVATOR #00452 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 10/81 - ELEVATOR 1 #00609 | DOB VIOLATION - ACTIVE |
| Apr 7, 1992 | LOCAL LAW 10/81 - ELEVATOR 1 #00630 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle C (premises is in Community District 4) | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 19, 2020 | AEUHAZ FTC-AEU-HAZ | Active |
| Nov 27, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 6, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 6, 2019 | AEUHAZ FTC-AEU-HAZ | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Jun 1, 2016 | Elevators EVCAT5 | Active |
| Oct 31, 2014 | Elevators EVCAT1 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
| Oct 1, 2012 | Elevators EVCAT1 | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
| Jan 6, 1998 | Elevators LL1081 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Jan 13, 1997 | Elevators LL1081 | Active |
| Mar 8, 1996 | Elevators LL1081 | Active |
| Apr 17, 1995 | Elevators LL1081 | Active |
| May 31, 1994 | Elevators LL1081 | Active |
| Jun 28, 1993 | Elevators LL1081 | Active |
| Apr 7, 1992 | Elevators LL1081 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 11:10 AM ET. BBL 1007630072.