1 floors · 39,225 sq ft · built 1999 · class K1 · owner of record: Cjc Retaco Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 39,225 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 13, 2021 | Construction CLASS - 2 BC3301.13.1 SITE SAFETY PLAN NOTE-ATOI OF 2STY DEMO SITE IN PROGRESS UPON REQUEST FOR SITE SAFETY PLAN FOR SITE NONE WAS PROVIDED.SITE SAFETY PLAN SHALL ALWAYS BE ONSITE AS REQUIRED TO VERIFY COMPLIANCE FOR SAF #35559037Z | May 18, 2022 IN VIOLATION | $0 |
| Mar 15, 2014 | Boilers CLASS - 1 51,3B,50A,50B,50C,50D,50E,38 50A-THE PIPE CONNECTION BROKEN,NEEDS TO BE REPLACED(FUMES)50B-REMOVE FLEX HOSE FROM HOT AIR DUCK 50C-CHECK FLUEPIPE FOR POSSIBLE BLOCKAGE 50D-C.O. INTERLOCK WITH GAS(BUCNERS)50E-THI #32074167M | Aug 11, 2014 DEFAULT | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 19, 2025 | GHG Emissions - LL97 FTF-EN-LL97320 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 10:09 PM ET. BBL 3009800023.