Brooklyn · Block 980 · Lot 23 · 11215

356 4 Avenue

1 floors · 39,225 sq ft · built 1999 · class K1 · owner of record: Cjc Retaco Llc

3open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
68dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 68 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 39,225 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing

Open violations

ECB / OATH (2)
IssuedViolationHearingBalance
May 13, 2021Construction CLASS - 2
BC3301.13.1 SITE SAFETY PLAN NOTE-ATOI OF 2STY DEMO SITE IN PROGRESS UPON REQUEST FOR SITE SAFETY PLAN FOR SITE NONE WAS PROVIDED.SITE SAFETY PLAN SHALL ALWAYS BE ONSITE AS REQUIRED TO VERIFY COMPLIANCE FOR SAF
#35559037Z
May 18, 2022
IN VIOLATION
$0
Mar 15, 2014Boilers CLASS - 1
51,3B,50A,50B,50C,50D,50E,38 50A-THE PIPE CONNECTION BROKEN,NEEDS TO BE REPLACED(FUMES)50B-REMOVE FLEX HOSE FROM HOT AIR DUCK 50C-CHECK FLUEPIPE FOR POSSIBLE BLOCKAGE 50D-C.O. INTERLOCK WITH GAS(BUCNERS)50E-THI
#32074167M
Aug 11, 2014
DEFAULT
$0
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Dec 19, 2025GHG Emissions - LL97 FTF-EN-LL97320
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 10:09 PM ET. BBL 3009800023.