16 floors · 142 apartments · 167,000 sq ft · built 1965 · class D4 · owner of record: Nyc Housing Development Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 167,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 302 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 423 days | Next cycle year 2027 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $55,500 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 841 days | Filing window not open yet |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4641). Agency page | Dec 31, 2031 in 1884 days | Next due 2031 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 19, 2011 | Boilers CLASS - 2 B254,50A,B,C. GIBRALTAR FTFB LP STM BER OIL-FIRED - 1964. 50A- FRONT FIREBOX DOORS OVERHEATED, DEFORMED AND OUT OF ALIGNMENT. ASH LEAKAGE FROM GASKET BURN OUT @ FRONT FIRE DOORS. PERFORM DOOR REPAIRS RE-ALIGN #32070742L | Feb 3, 2012 STIPULATION/IN-VIO | $0 |
| Dec 19, 2011 | Boilers CLASS - 2 B254,50A,B,C. GIBRALTAR FTFB LP STM BER, OIL-FIRED - 1964. 50A- SUSPECTED ASBESTOS INSULATION UNSTABLE ON SECTIONS OF THE BOILER EXTERNAL CASING. PERFORM ENCAPSULATION OR ABATEMENT IF POSITIVE. 50B- CORROSION & #32070743N | Feb 3, 2012 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 28, 2024 | CONSTRUCTION EMERGENCY WORK ORDER.NOTE ON AN ACTIVE PS OF ENTIRE 2 STORY BUILDING C ONSISTING OF 2 LEVELS,OBSERVED SPALLED CONCRETE,EXPOSED REBAR,RUSTED R EBAR WITHOUT VEHICLES AT VAIRIOUS LOCATIONS AT LV1 WITHOUT SHORING SUP PORTS AND VACATED ENTIRE PARKING FOR DEMOLISH WORK APPEAR IN PROGRESS REMEDY:OWNER TO R #LL21202YC | DOB VIOLATION - ACTIVE |
| Feb 21, 2024 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911651 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #05130 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #05131 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #08582 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #08583 | DOB VIOLATION - ACTIVE |
| Apr 25, 1991 | LOCAL LAW 10/81 - ELEVATOR 2 #01931 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Mar 5, 2025 | Parking Structures FTC-PS-UNSAFE Unsafe report of parking structures filed | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Feb 21, 2024 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 9, 1994 | Boiler LL6291 | Active |
| May 17, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 2, 2026 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT PUBLIC HALL, 15th STORY | Feb 28, 2026 |
| Jan 22, 2024 | B | Apt 16D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 16D, 16th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 26, 2024 |
| Jan 22, 2024 | B | Apt 16D · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 16D, 16th STORY, 2nd APARTMENT FROM WEST AT NORTH | Feb 26, 2024 |
| Dec 1, 2022 | A | Apt 10J · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS IN THE 5th ROOM FROM NORTH AT EAST LOCATED AT APT 10J, 10th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 6, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 4:19 AM ET. BBL 2046410016.