2 floors · 3 apartments · 2,260 sq ft · built 1915 · class C0 · owner of record: 3555 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 61 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 77 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 305 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 8, 2023 | Unknown CLASS - 1 UNSAFE ELECTRICAL EQUIPMENT ON USE AT THE TIME OF INSPECTION I OBSERVED ALL PUBLIC LIGHTING BEEN FEED FROM TENANTS METER. I ALSO OBSERVED WHEN TENANT TURNS THE STOVE ON THE LIGHTING IN THE HALLWAY TURNS ON AT T #35488638Z | Mar 28, 2024 IN VIOLATION | $1,600 |
| Sep 8, 2023 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT A PERMIT. AT THE TIME OF INSPECTION I OBSERVED ALL PUBLIC LIGHTING BEEN FEED FROM FIRST FLOOR TENANTS METER. PUBLIC METER AND WIRING (BRANCH CIRCUITS) HAS BEEN REMOVED. REMEDY: OBTAIN PE #35488639K | Mar 28, 2024 IN VIOLATION | $800 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 16, 2026 | B | Apt 1 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 20, 2026 |
| Jul 16, 2026 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 20, 2026 |
| Jul 16, 2026 | B | Apt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 20, 2026 |
| Jul 16, 2026 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 11, 2026 |
| Jul 16, 2026 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Aug 11, 2026 |
| Apr 29, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 2, 2026 |
| Jun 4, 2025 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Sep 7, 2025 |
| Jan 9, 2024 | B | Apt 1 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 4 SQ FT AT SOUTH WALL APPROX 2 SQ FT AT INTERIOR OF BASE CABINET IN THE KITCHENETTE LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 16207499 ISSUED 05-SEP-23 HAS BEEN UPGRADED | Feb 13, 2024 |
| Aug 9, 2023 | C | Apt A1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 4, 2023 |
| Aug 9, 2023 | C | Apt A1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Sep 4, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Jul 16, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL CLOSET IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 16, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 16, 2026 | HPD B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 16, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
| Jul 16, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 1:59 PM ET. BBL 2046600028.