4 floors · 29,640 sq ft · built 1917 · class O5 · owner of record: 355 E 149th Street, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 47 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 29,640 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 3, 2025 | Unknown CLASS - 2 TEMP. CONSTRUCTION EQUIP/INSTALLATION ON SITE EXPIRED PERMIT(SHED). ASNOTED: AT THE TIME OF INSPECTION I OBSERVED SHED PERMIT WAS EXPIRED. REMEDY: RENEW PERMIT. #35716981H | Nov 2, 2026 DEFAULT | $1,280 |
| Apr 3, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION ON SITE, EXPIRED PERMIT. AS NOTED: AT THE TIME OF INSPECTION: PIPE SCAFFOLDING PERMIT WAS EXPIRED. REMEDY: RENEW PERMIT. #35716982J | Nov 2, 2026 DEFAULT | $1,280 |
| Issued | Violation | Status |
|---|---|---|
| Jun 17, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. NOTED AT TIME OF INSPECTION OBSERVED AT EXPOSURE 1 BROKEN GLASS WINDOW AT 2ND FLOOR. OBSERVED EXPOSED MISSING AND DISPLACED BRICK AT EXPOSURE 2 PARAPET LEVEL AND 4TH FLOOR ALSO BROKEN GLASS AND 2ND #SR20101BB | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #05613 | DOB VIOLATION - ACTIVE |
| Jul 3, 2025 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT DUE VEHICLE STRIKING SIDEWALK SHED AT CORNER OF EXPOSURE#1 AND 2. DISLODGING 4 UPRIGHTS AND CROSS BEAMS. #25-01464 | DOB VIOLATION - ACTIVE |
| Apr 3, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED ON EXPOSURE #3 NORTH ELEVATION: CRACKS ON 4TH FL BRICK WORK, AND CRACKS IN CHIMNEY BRICKS & MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE ALL DAMAGED MASONRY ON FACADE #SR0103RF | DOB VIOLATION - ACTIVE |
| Oct 8, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AS NOTED AT TIME OF INSPECTION OBSERVED CRACKS AT EXPOSURE #1 AT EXPOSURE #2 OBSERVED MISSING STONE AT EXPOSURE #3 OBSERVED MULTIPLE CRACKED WINDOW SILLS REMEDY: REPAIR/OR REPLACE #SR20103DO | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #05426 | DOB VIOLATION - ACTIVE |
| Jun 7, 2024 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,I OBSERVED ON EXP1 SOUTH ELEV,CRACKS IN MORTAR JOINTS ,SPALLED MORTAR JOINTS ON THE THIRD AND FORTH FLOORS.EXP3 &4 NORTH & E AST ELEV,CORRORED,SAGGING METAL LINTELS AT SEVERAL FLOORS.REMEDY:REPAI R AND/OR REPLACE #SR0102RF | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #09093 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #06313 | DOB VIOLATION - ACTIVE |
| Nov 19, 2004 | LOCAL LAW 10/81 - ELEVATOR #01555 | DOB VIOLATION - ACTIVE |
| Apr 21, 2004 | LOCAL LAW 10/81 - ELEVATOR #01741 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #11764 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 29, 2026 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Nov 19, 2004 | Elevators LL1081 | Active |
| Nov 19, 2004 | Elevators LL1081 | Active |
| Apr 21, 2004 | Elevators LL1081 | Active |
| Mar 10, 2000 | Elevators LL1081 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)