7 floors · 538,240 sq ft · built 1903 · class I1 · owner of record: Richmond Medical Center
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 51 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-24 (Accepted). Agency page | Dec 31, 2026 in 51 days | 1 of 5 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 538,240 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 172 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 172 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 782 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $2,057,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 834 days | Filing window not open yet |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 102). Agency page | Dec 31, 2032 in 2243 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 22, 2024 | Boilers CLASS - 2 FOUND CLEAVERBROOKS(MODEL# 4WI 200-700) BOILER INSTALLED UNDER PERMIT#520233408 NEVER SIGNED OFF AND OPERATING WITHOUT A DOB CERTIFICATE ISSUED BY INSPECTOR OBTAIN SIGN OFF AND CERTIFICATE FROM DOB #39115026L | Aug 7, 2024 ADMIT/IN-VIO | $0 |
| May 14, 2024 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: THE OWNER DID NOT COMPLY WITH COMMISSIONER'S ORDERS N#(031723FA0101MH) AND(031723FA0102MH) ON DATE: 03-17-2024. REMEDY: COMPLY WITH COMMISSIONE #35681866P | Sep 4, 2024 ADMIT/IN-VIO | $0 |
| Sep 19, 2023 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDING NOTE: RESPONDENT FAILED TO COMPLY PREVIOUS VIOLATION #35674300K AND 35674301M DATED 06/08/2023 #35675180J | Apr 17, 2024 IN VIOLATION | $0 |
| Aug 10, 2023 | Unknown CLASS - 2 AT TIME OF INSPECTION OF 6 STORY COMMERCIAL BUILDING OBSERVED CONSTRUCTION EQUIPMENT IN PLACE FOR WINDOW REPLACEMENT UPON FURTHER DEPARTMENT RECORDS REVIEW VIOLATION 35653861H SERVED 4-17-2023 FOR INCIDENT FO #39520410P | Feb 27, 2025 DEFAULT | $0 |
| Jul 28, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER NOTE: RESPONDENT FAILED TO COMPLY PREVIOUS ISSUED #35674300K AND 35674301M DATED 06/08/2023, WHICH REQUIRES TO RETAIN SERVICES OF NYS REGISTERED DESIGN PROFESSIONAL T #35674432M | Sep 4, 2024 IN VIOLATION | $0 |
| Jun 8, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER ON 03-16-2023,MASONRY BRICK FACADE FAILED DISLODGED AND FELL TO SETBACK AT THE SOUTHERN ELEVATION.DOB#031723FA0101MH HAD BEEN ISSUED ON 03-17-2023 TO RETAIN SERVICES #35674300K | Apr 17, 2024 IN VIOLATION | $0 |
| Jun 8, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER ON 03-16-2023,MASONRY BRICK FACADE FAILED,DISLODGED AND FELL TO SET BACK AT THE SOUTHERN ELEVATION.DOB#031723FA0102MH HAD BEEN ISSUED ON 03-17-2023 TO RETAIN SERVICES #35674301M | Apr 17, 2024 IN VIOLATION | $0 |
| Apr 17, 2023 | Unknown CLASS - 1 FAILED TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN A FATALITY OR INJURY. NOTE: TWO WORKERS WERE STRUCK BY A 24X12" PANEL THAT FELL AND HIT THE WORKERS ON THE SUSPENDED SCAFFOLD. WORKER WAS TAKEN TO HOSPI #35653861H | May 14, 2024 IN VIOLATION | $0 |
| Mar 16, 2023 | Cranes and Derricks CLASS - 2 AT THE TIME OF INSPECTION IN RESPONSE TO AN INCIDENT, I OBSERVED SUSPENDED SCAFFOLD INSTALLED AT EXP#4 OF THE BUILDING. UPON REVIEW OF DEPARTMENT RECORDS, IT WAS OBSERVED THAT NO NOTIFICATION RECEIVED BY THE DE #39514232K | Aug 12, 2024 IN VIOLATION | $0 |
| Mar 16, 2023 | Construction CLASS - 1 WORKERS INJURED BY COLLAPSE OF A FACADE WALL AT EXP#4. WORKERS WERE PERFORMING REPAIRS ON FLANGES ON A 4TH STORY, WHEN A FACADE ABOVE COLLAPSED ON WORKERS. EXISTING FACADE BRICKS WERE INSTALLED APPROX. 4 INCHED #39515265L | Apr 23, 2024 IN VIOLATION | $0 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 7C AND 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#812494. REMEDY:SUBMIT ACCEPTABLE #37023235R | Jan 4, 2023 ADMIT/IN-VIO | $0 |
| Oct 6, 2022 | Construction CLASS - 2 IN BASEMENT LOT OF CONSTRUCTION MATERIALS BIG HOLES ON CEILING ,FIRE ESCAPE DOOR GOING OUTSIDE IS MISSING, NO FIRE EXIT SIGNS ON DOORS. BOILER ROOM IS FULL WITH COMBUSTIBLE MATERIALS, TOOLS, REPAIR AND/OR REPLA #39071547P | Feb 15, 2023 IN VIOLATION | $0 |
| Feb 9, 2022 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES WERE REQUIRED TO PROTECT PUBLIC FROM DOCUMENTED UNSAFE FACADE.AS NOTED:BLDG RECORD SUMMONS #35640585H ON 12/17/22 & AS OF 2/9/22 SAFETY MEASURES HAVE NOT BEEN PROVIDED FOR BLD #35640206Z | Sep 28, 2022 IN VIOLATION | $0 |
| Dec 17, 2021 | Construction CLASS - 1 FAILURE TO PROVIDE SAFETY MEASURES,SUCH AS FENCE,SIDEWALK SHED,ETC WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY.AT TIME OF INSPECTION OBSERVED INADEQUATE SAFETY MEASURES AROUND BUILDING#9(VILLA BUILDING)W #35640585H | Sep 28, 2022 IN VIOLATION | $0 |
| Jun 29, 2021 | Boilers CLASS - 2 BURNHAM PIN5PV BOILER LOCATED IN OLD CONVENT BUILDING, MAINTAIN BOILER; IS NOT REGISTERED. CORRECT VIOLAING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION #39043650P | Mar 9, 2022 IN VIOLATION | $0 |
| Jun 29, 2020 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION #35365188K ISSUED ON 11/16/2018,AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1RCNY 102-01(D)(2).REM:FILE A CERTIFIC #37019595Z | Jul 14, 2021 IN VIOLATION | $0 |
| Oct 28, 2019 | Local Law CLASS - 2 FAILURE TO SUBMIT A REQUIRED CYCLE 8B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#812494. AGG2 HISTORY OF NONCOMPLIANCE ON 37009392J, #37015934X | Dec 9, 2020 DEFAULT | $0 |
| Mar 7, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQD BY 28-302.4 FOR CONTROL#712494.AGG2 HISTORY OF NONCOMPLIANCE ON 36024064J(AGG #37009392J | Jul 18, 2018 IN VIOLATION | $0 |
| Jun 20, 2017 | Unknown CLASS - 2 FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000514 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER 1, 2016. REM: FILE ANNUAL #37003352H | Dec 20, 2017 IN VIOLATION | $0 |
| Jun 20, 2017 | Unknown CLASS - 2 FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000515 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER 1, 2016. REM: FILE ANNUAL #37003353J | Dec 20, 2017 IN VIOLATION | $0 |
| Jun 20, 2017 | Unknown CLASS - 2 FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000513 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER 1, 2016. REM: FILE ANNUAL #37003354L | Dec 20, 2017 IN VIOLATION | $0 |
| Jun 20, 2017 | Unknown CLASS - 2 FAILURE TO FILE ANNUAL CERTIFICATION THAT COOLING TOWER 1000000517 HAS BEEN INSPECTED, TESTED AND DISINFECTED AND THAT A MAINTENANCE PLAN HAS BEEN DEVELOPED AND IMPLEMENTED BY NOVEMBER 1, 2016. REM: FILE ANNUAL #37003351X | Dec 20, 2017 IN VIOLATION | $0 |
| Jun 24, 2008 | Boilers Non-Hazardous 27-127 B4B,36,50,28B,32A,50A,50B,50C HAZ B4B #28B=50=LEAKY TUBES ON HIGH PRESSURE MOBILE TRAILER BOILER TO BE REPAIRED/REPLACES IMMEDIATELY 50A=HIGH PRESSURE BOILER SAFETY VALVES TO BE PIPED TO A SAFE LOCATION #32056133P | Mar 18, 2009 IN VIOLATION | $0 |
| Nov 1, 2007 | Boilers Non-Hazardous B4B/32A/50/50A/50B/50C/21A/.50-HAZARDOUS:EXPOSED FUEL OIL IN OPEN CONTAINERS IN PLANT.50A-IMPROPER STORAGE OF GASOLINE IN POWER PLANT.50B-MISSING LOCK OUT & PLUB ON 4 GAS LINE FROM BOILER#07 TO OUTSIDE OF PLANT #32052289N | Dec 19, 2007 IN VIOLATION | $0 |
| Oct 31, 2007 | Boilers Hazardous B4A/36/.36-MOBIL HIGH PRESSURE BOILER NOT REGISTERED W/THE NEW YORK CITY DEPT OF BLDGS. #32055209H | Dec 19, 2007 IN VIOLATION | $0 |
| Oct 25, 2007 | Boilers Non-Hazardous B4A/50/50A/.50-IMPROPER LOG MOOKS FOR POWER PLANT BOILERS.50A-NOT LOGGING IN STATIONARY ENGINEERS LOG BOOK COMPLETELY ON DAILY OPERATIONS. #32052288L | Dec 19, 2007 IN VIOLATION | $0 |
| Oct 25, 2007 | Boilers Hazardous B4B/36/50/50A/50B/50C/.50/36-POWER HOUSE MOBILE HIGH PRESSURE STEAM BOILER NOT REGISTERED W/NYC DOB AS OF 10/25/07 INSPECTION.50A-IMPROPER LOW WATER CUT OFF(NO MANUAL RESET).50B-TARP OVER BURNER AIR SHROUT & #32052287J | Dec 19, 2007 IN VIOLATION | $0 |
| Feb 21, 2006 | Boilers Non-Hazardous 2/36/50. CLEVER BROOKS MOBIL BOILER. 2)BOILER IS OUTSIDE OF POWER PLANT WITH NO ENGINEER WITH THE BOILER. 50)PIPE SAFETY VALVE DISCHARGE TO PREVENT #32049762M | Apr 19, 2006 IN VIOLATION | $0 |
| Jul 19, 1993 | Boilers Non-Hazardous 36 #32010246H | Oct 6, 1993 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 17, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE. AS NOTED AT TIME OF INSPECTION OBSERVED AT EXPOSURE 4 BROKEN GLASS ALSO STEP CRACKS AND SPALLING BRICK. REMEDY: REPAIR AND/OR REPLACE #SR0102BB | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01363 | DOB VIOLATION - ACTIVE |
| Jul 26, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9C UNSAFE REPORT FILED #911189 | DOB VIOLATION - ACTIVE |
| May 11, 2023 | CONSTRUCTION FAILURE TO MAINTAIN FACADE& APPURT..ON 03-16-23 MASONRY.BRICK FACADE BETWEEN 5TH&6TH FL.FAILED,DISLODGED& FELL TO SETBACK BELOW INJURING 2WORKERS ON SUSPENDED SCAFFOLD@SOUTHERN.ELEV.INVEST.&SAFE MAKING OPERA TIONS FOLLOWED.REMEDY PROV.A PERM.ENCLOSURE/RESTORE CLADDING@THE INCID INCIDENT AREA.PROVIDE #FA0101MH= | DOB VIOLATION - ACTIVE |
| Mar 17, 2023 | CONSTRUCTION FAIL.TO MAINT.FACADE&APPURT.03/16/23MASONRY BRICK FACADE BET.5&6 FLRS FAILED DISLOGED&FELL TO SETBACKBELOW INJURING 2 WORKERS ON SUSPENDED SCAFFOLDING FOR REASONS YET TO BE DETERM.@SI,EKEV.REMEDY:IMMEDIATELY RETAIN SERV.OF A NLYS REG.DESIGN PROF.WHO IS A QEWI WITH MASONRY BRICK FACADE EXP.TO VISUALL #FA0101MH | DOB VIOLATION - ACTIVE |
| Mar 17, 2023 | CONSTRUCTION FAILURE TO MAINTAIN FACADE AND APPURTENANCES.ON 3/16/23 MASONRY BRICK FACADE BET.5&6TH FL FAILED DISLODGED& FELL TO SETBACK.BELOW INJURING 2 WORKERS ON SUSPENDED SCAFFOLDING FOR REASONS YET TO BE DETERM.@THE SO ELEV.REMEDY:OWNER TO RETAIN SERV,OF NYS REG.DESIGN PROF.WHO IS A QEWI WITH MASONRY BRICK #FA0102MH | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #16267 | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #01382 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #03282 | DOB VIOLATION - ACTIVE |
| Jan 1, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02956 | DOB VIOLATION - ACTIVE |
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #04183 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2025 Cat1 Test Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Jul 26, 2023 | Facades FISPHAZ CYCLE 9C UNSAFE REPORT FILED | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Jan 1, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)