17open violations
$20,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Annual boiler inspection (2 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-02 (Accepted). Agency page

Dec 31, 2026
in 67 days
2 of 2 without an accepted 2026 report yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1163 days
Next cycle year 2029

Open violations

ECB / OATH (5) · $20,000 owed
IssuedViolationHearingBalance
Sep 27, 2026Construction CLASS - 1
FAILURE TO MAINTAIN. AT EXPOSURE #2 APPROX 26 LINEAR FEET OF CONSTRUCTION FENCE IS LEANING AND IN DISREPAIR., REPAIR AND/REPLACE
#39205750L
Dec 3, 2026
PENDING
$2,500
Sep 11, 2026Construction CLASS - 1
NOTE: AT TIME OF INSPECTION, UPON REVIEWING THE DEPARTMENT RECORDS IT WAS NOTED THAT THE DAILY REPORT THAT WAS REQUIRED BY THE DEPARTMENT WAS NOT SUBMITTED.
#39559090N
Nov 19, 2026
PENDING
$2,500
Sep 11, 2026Unknown CLASS - 1
NOTE: AT TIME OF INSPECTION I OBSERVED ADJACENT BUILDING AT EXPOSURES# 2 AND 3 MISSING THE REQUIRED WEATHERPROOFING AS PER 3309.9, CREATING A HAZARDOUS CONDITION BY ALLOWING WATER INTRUSION INTO THE BUILDING WH
#39559089X
Nov 19, 2026
$10,000
Jun 12, 2026Construction CLASS - 2
OBSERVED FENCE PARTIALLY ERECTED ON 7 AVE, NOT PAINTED HUNTER GREEN(3307.7.8). NO VIEWING PANELS EVERY 25FT NOT UP TO CODE. 330.7.7.7. ADVERTISEMENT POSTERS COVER FENCE ON 30 ST/7 AVE. FENCE NOT MAINTAINED PROP
#39192451L
Jul 13, 2027
DEFAULT
$5,000
Oct 20, 2020Construction CLASS - 1
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O #4420 ILLEGAL OCCUPANCY NOTED:UNIT #206(2ND FL)& UNIT #304(3RD FL) OCCUPIED AS ADULT PHYSICAL CULTURE ESTABLISHMENT & PHYSICAL CULTURE ESTABLISHMENT DOING BUSINE
#35489432H
Feb 3, 2022
IN VIOLATION
$0
DOB (9)
IssuedViolationStatus
Sep 3, 2026CONSTRUCTION
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #063026FEY10501KR (CONTROL #350716),DATED 06/30/2026,REQUIRING ONWER TO IMMEDIATELY SUBMIT MEANS& METHODS TO DOB,&UPON APPRVL TO IMMED DEMO THE BLDG AT 156 W 30 ST,MN & GRADE FENCE SITE UNDER DIRECT&CONTINUOUS SUPERVISION OF RECEIVD A DAILY RPRT FRM ONSITE
#FEU10501KR
DOB VIOLATION - ACTIVE
Jul 6, 2026CONSTRUCTION
FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG WAS IN STATE OF DISREPAIR W/NO TABLE SAGGNG OF THE 2NDFL & OF THE STAIRWAY BETWEEN 1ST & 2ND FLOORS LOCATED NEAR EXP3/4(SOUTHWEST) CORNER.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG & REPAIR UNDER PERMIT.STRT WRK BY 09/07/26 & COMPLETE/SIGN OFF BY 1
#FEU10502KR
DOB VIOLATION - ACTIVE
Jul 6, 2026CONSTRUCTION
FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUSTAIND DMG RELATED TO FIRE ON/ARNF 6/30/26 W/DMGD STAIR BULKHEAD ROOF&WALL@ROOF& WALL@ROOF LEVEL,ISOLATD 3RDFL DECK DMG NEAR EXP2/3 CRNR,&FIRE DMG.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 09/07/26 & COMPLETE/SIGN OFF
#FEU10501KR
DOB VIOLATION - ACTIVE
Jun 30, 2026CONSTRUCTION
STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE AT ADJ PROPERTY REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER
#CER01CM
DOB VIOLATION - ACTIVE
Jun 30, 2026CONSTRUCTION
EMERGENCY WORK ORDER.THE BLDG SUSTAIND FIRE DMG DUE TO FIRE ON/ARND 6/30/26.APPROX HALF OF ROOF FIRE DMGD W/REAR PARTIALLY CLLPD.FDNY&FIRE MARSHLL SEARCHES&INVSTGTNS ARE NOT COMPLETE.OWNR TO IMMED RTAIN NYSPE, DEMO ENDRSD CNTRCTR T,&ASBESTOS CONTRACTR TO IMMED FULLY DEMO THE BLDG @156 W30ST&GRADE&FN
#FEU10501KR
DOB VIOLATION - ACTIVE
Jun 30, 2026CONSTRUCTION
STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER
#CER03CM
DOB VIOLATION - ACTIVE
Jun 30, 2026CONSTRUCTION
STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAINED TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER
#CER02CM
DOB VIOLATION - ACTIVE
Nov 14, 2025HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
#01003
DOB VIOLATION - ACTIVE
Apr 25, 2023HIGH PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
#00116
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Nov 14, 2025Boiler HBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Apr 25, 2023Boiler HBLVIO
VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 27, 2026ECBConstruction: FAILURE TO MAINTAIN. AT EXPOSURE #2 APPROX 26 LINEAR FEET OF CONSTRUCTION FENCE IS LEANING AND IN DISREPAIR., REPAIR AND/REPLACEOpen
Sep 11, 2026ECBConstruction: NOTE: AT TIME OF INSPECTION, UPON REVIEWING THE DEPARTMENT RECORDS IT WAS NOTED THAT THE DAILY REPORT THAT WAS REQUIRED BY THE DEPARTMENT WAS NOT SUBMITTED.Open
Sep 11, 2026ECBUnknown: NOTE: AT TIME OF INSPECTION I OBSERVED ADJACENT BUILDING AT EXPOSURES# 2 AND 3 MISSING THE REQUIRED WEATHERPROOFING AS PER 3309.9, CREATING A HAZARDOUS CONDITION BY ALLOWING WATER INTRUSION INTO THE BUILDING WHClosed
Sep 3, 2026DOBCONSTRUCTION: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #063026FEY10501KR (CONTROL #350716),DATED 06/30/2026,REQUIRING ONWER TO IMMEDIATELY SUBMIT MEANS& METHODS TO DOB,&UPON APPRVL TO IMMED DEMO THE BLDG AT 156 W 30 ST,MN & GRADE FENCE SITE UNDER DIRECT&CONTINUOUS SUPERVISION OF RECEIVD A DAILY RPRT FRM ONSITEOpen
Jul 6, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG WAS IN STATE OF DISREPAIR W/NO TABLE SAGGNG OF THE 2NDFL & OF THE STAIRWAY BETWEEN 1ST & 2ND FLOORS LOCATED NEAR EXP3/4(SOUTHWEST) CORNER.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG & REPAIR UNDER PERMIT.STRT WRK BY 09/07/26 & COMPLETE/SIGN OFF BY 1Open
Jul 6, 2026DOBCONSTRUCTION: FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUSTAIND DMG RELATED TO FIRE ON/ARNF 6/30/26 W/DMGD STAIR BULKHEAD ROOF&WALL@ROOF& WALL@ROOF LEVEL,ISOLATD 3RDFL DECK DMG NEAR EXP2/3 CRNR,&FIRE DMG.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 09/07/26 & COMPLETE/SIGN OFFOpen
Jun 30, 2026DOBCONSTRUCTION: STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE AT ADJ PROPERTY REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNEROpen
Jun 30, 2026DOBIMMEDIATE EMERGENCY: INSTALL A TIGHTBOARD CONSTRUCTION FENCE AROUND THE 3 BLDGS AT 7 AVE & W 30 ST TO SECURE THE PROPERTIES AND SAFEGUARD THE PUBLIC.INSTALL FEN CE ROM BLDG CORNER AT 355 7 AVE (ADJ TO 345 7 AVE) EXTENDING 8 FEET IN TO SIDEWALK AT 7 AVE. EXTEND FENCE THE FULL LENGTH OF THE BLDG AND EX TEND APPRX 8 FT INTClosed
Jun 30, 2026DOBCONSTRUCTION: EMERGENCY WORK ORDER.THE BLDG SUSTAIND FIRE DMG DUE TO FIRE ON/ARND 6/30/26.APPROX HALF OF ROOF FIRE DMGD W/REAR PARTIALLY CLLPD.FDNY&FIRE MARSHLL SEARCHES&INVSTGTNS ARE NOT COMPLETE.OWNR TO IMMED RTAIN NYSPE, DEMO ENDRSD CNTRCTR T,&ASBESTOS CONTRACTR TO IMMED FULLY DEMO THE BLDG @156 W30ST&GRADE&FNOpen
Jun 30, 2026DOBCONSTRUCTION: STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNEROpen
Jun 30, 2026DOBCONSTRUCTION: STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAINED TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNEROpen