| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-06-02 (Accepted). Agency page | Dec 31, 2026 in 67 days | 2 of 2 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 27, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN. AT EXPOSURE #2 APPROX 26 LINEAR FEET OF CONSTRUCTION FENCE IS LEANING AND IN DISREPAIR., REPAIR AND/REPLACE #39205750L | Dec 3, 2026 PENDING | $2,500 |
| Sep 11, 2026 | Construction CLASS - 1 NOTE: AT TIME OF INSPECTION, UPON REVIEWING THE DEPARTMENT RECORDS IT WAS NOTED THAT THE DAILY REPORT THAT WAS REQUIRED BY THE DEPARTMENT WAS NOT SUBMITTED. #39559090N | Nov 19, 2026 PENDING | $2,500 |
| Sep 11, 2026 | Unknown CLASS - 1 NOTE: AT TIME OF INSPECTION I OBSERVED ADJACENT BUILDING AT EXPOSURES# 2 AND 3 MISSING THE REQUIRED WEATHERPROOFING AS PER 3309.9, CREATING A HAZARDOUS CONDITION BY ALLOWING WATER INTRUSION INTO THE BUILDING WH #39559089X | Nov 19, 2026 | $10,000 |
| Jun 12, 2026 | Construction CLASS - 2 OBSERVED FENCE PARTIALLY ERECTED ON 7 AVE, NOT PAINTED HUNTER GREEN(3307.7.8). NO VIEWING PANELS EVERY 25FT NOT UP TO CODE. 330.7.7.7. ADVERTISEMENT POSTERS COVER FENCE ON 30 ST/7 AVE. FENCE NOT MAINTAINED PROP #39192451L | Jul 13, 2027 DEFAULT | $5,000 |
| Oct 20, 2020 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O #4420 ILLEGAL OCCUPANCY NOTED:UNIT #206(2ND FL)& UNIT #304(3RD FL) OCCUPIED AS ADULT PHYSICAL CULTURE ESTABLISHMENT & PHYSICAL CULTURE ESTABLISHMENT DOING BUSINE #35489432H | Feb 3, 2022 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 3, 2026 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #063026FEY10501KR (CONTROL #350716),DATED 06/30/2026,REQUIRING ONWER TO IMMEDIATELY SUBMIT MEANS& METHODS TO DOB,&UPON APPRVL TO IMMED DEMO THE BLDG AT 156 W 30 ST,MN & GRADE FENCE SITE UNDER DIRECT&CONTINUOUS SUPERVISION OF RECEIVD A DAILY RPRT FRM ONSITE #FEU10501KR | DOB VIOLATION - ACTIVE |
| Jul 6, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG WAS IN STATE OF DISREPAIR W/NO TABLE SAGGNG OF THE 2NDFL & OF THE STAIRWAY BETWEEN 1ST & 2ND FLOORS LOCATED NEAR EXP3/4(SOUTHWEST) CORNER.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG & REPAIR UNDER PERMIT.STRT WRK BY 09/07/26 & COMPLETE/SIGN OFF BY 1 #FEU10502KR | DOB VIOLATION - ACTIVE |
| Jul 6, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUSTAIND DMG RELATED TO FIRE ON/ARNF 6/30/26 W/DMGD STAIR BULKHEAD ROOF&WALL@ROOF& WALL@ROOF LEVEL,ISOLATD 3RDFL DECK DMG NEAR EXP2/3 CRNR,&FIRE DMG.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 09/07/26 & COMPLETE/SIGN OFF #FEU10501KR | DOB VIOLATION - ACTIVE |
| Jun 30, 2026 | CONSTRUCTION STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE AT ADJ PROPERTY REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER #CER01CM | DOB VIOLATION - ACTIVE |
| Jun 30, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.THE BLDG SUSTAIND FIRE DMG DUE TO FIRE ON/ARND 6/30/26.APPROX HALF OF ROOF FIRE DMGD W/REAR PARTIALLY CLLPD.FDNY&FIRE MARSHLL SEARCHES&INVSTGTNS ARE NOT COMPLETE.OWNR TO IMMED RTAIN NYSPE, DEMO ENDRSD CNTRCTR T,&ASBESTOS CONTRACTR TO IMMED FULLY DEMO THE BLDG @156 W30ST&GRADE&FN #FEU10501KR | DOB VIOLATION - ACTIVE |
| Jun 30, 2026 | CONSTRUCTION STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER #CER03CM | DOB VIOLATION - ACTIVE |
| Jun 30, 2026 | CONSTRUCTION STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAINED TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER #CER02CM | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01003 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00116 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 27, 2026 | ECB | Construction: FAILURE TO MAINTAIN. AT EXPOSURE #2 APPROX 26 LINEAR FEET OF CONSTRUCTION FENCE IS LEANING AND IN DISREPAIR., REPAIR AND/REPLACE | Open |
| Sep 11, 2026 | ECB | Construction: NOTE: AT TIME OF INSPECTION, UPON REVIEWING THE DEPARTMENT RECORDS IT WAS NOTED THAT THE DAILY REPORT THAT WAS REQUIRED BY THE DEPARTMENT WAS NOT SUBMITTED. | Open |
| Sep 11, 2026 | ECB | Unknown: NOTE: AT TIME OF INSPECTION I OBSERVED ADJACENT BUILDING AT EXPOSURES# 2 AND 3 MISSING THE REQUIRED WEATHERPROOFING AS PER 3309.9, CREATING A HAZARDOUS CONDITION BY ALLOWING WATER INTRUSION INTO THE BUILDING WH | Closed |
| Sep 3, 2026 | DOB | CONSTRUCTION: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #063026FEY10501KR (CONTROL #350716),DATED 06/30/2026,REQUIRING ONWER TO IMMEDIATELY SUBMIT MEANS& METHODS TO DOB,&UPON APPRVL TO IMMED DEMO THE BLDG AT 156 W 30 ST,MN & GRADE FENCE SITE UNDER DIRECT&CONTINUOUS SUPERVISION OF RECEIVD A DAILY RPRT FRM ONSITE | Open |
| Jul 6, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG WAS IN STATE OF DISREPAIR W/NO TABLE SAGGNG OF THE 2NDFL & OF THE STAIRWAY BETWEEN 1ST & 2ND FLOORS LOCATED NEAR EXP3/4(SOUTHWEST) CORNER.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG & REPAIR UNDER PERMIT.STRT WRK BY 09/07/26 & COMPLETE/SIGN OFF BY 1 | Open |
| Jul 6, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUSTAIND DMG RELATED TO FIRE ON/ARNF 6/30/26 W/DMGD STAIR BULKHEAD ROOF&WALL@ROOF& WALL@ROOF LEVEL,ISOLATD 3RDFL DECK DMG NEAR EXP2/3 CRNR,&FIRE DMG.OWNR TO RTAIN NYSPE TO EVAL THE ENT BLDG&RPAIR UNDR PRMT STRT WRK BY 09/07/26 & COMPLETE/SIGN OFF | Open |
| Jun 30, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE AT ADJ PROPERTY REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER | Open |
| Jun 30, 2026 | DOB | IMMEDIATE EMERGENCY: INSTALL A TIGHTBOARD CONSTRUCTION FENCE AROUND THE 3 BLDGS AT 7 AVE & W 30 ST TO SECURE THE PROPERTIES AND SAFEGUARD THE PUBLIC.INSTALL FEN CE ROM BLDG CORNER AT 355 7 AVE (ADJ TO 345 7 AVE) EXTENDING 8 FEET IN TO SIDEWALK AT 7 AVE. EXTEND FENCE THE FULL LENGTH OF THE BLDG AND EX TEND APPRX 8 FT INT | Closed |
| Jun 30, 2026 | DOB | CONSTRUCTION: EMERGENCY WORK ORDER.THE BLDG SUSTAIND FIRE DMG DUE TO FIRE ON/ARND 6/30/26.APPROX HALF OF ROOF FIRE DMGD W/REAR PARTIALLY CLLPD.FDNY&FIRE MARSHLL SEARCHES&INVSTGTNS ARE NOT COMPLETE.OWNR TO IMMED RTAIN NYSPE, DEMO ENDRSD CNTRCTR T,&ASBESTOS CONTRACTR TO IMMED FULLY DEMO THE BLDG @156 W30ST&GRADE&FN | Open |
| Jun 30, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAIEND TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER | Open |
| Jun 30, 2026 | DOB | CONSTRUCTION: STRUCTURE RENDERED NONCOMPLIANT ATOI. OBSERVED DMG SUSTAINED TO ENTIRE BLDG DUE TO FIRE REMEDY: STRUCTURE MUST BE MAINTAINED IN CODE COMPLIANT MANNER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)