8 floors · 32,970 sq ft · built 2023 · class H3 · owner of record: 3530 Webster Avenue
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 32,970 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 485 days | No Cycle 10 report on record yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 25, 2024 | Construction CLASS - 2 8 STORY NB ACTIVE SITE. OBSERVED AT EXP#1 PEDESTRIAN WALKWAY LOCATION.MAKESHIFT TEMPORARY PLATFORM CONSISTING OF WOOD/PLYWOOD ATTACHED TO FENCE ABOVE THE PEDESTRIAN WALKWAY THRU THE SITE. UPON REQUEST TO CONTRA #39529941P | Jun 18, 2025 IN VIOLATION | $1,250 |
| Jun 25, 2024 | Unknown CLASS - 2 8 STORY NB ACTIVE SITE AT EXTERIOR COMPLETION PHASE. OBSERVED NO/MISSING OR INADEQUATE ROOF PROTECTION OF ADJOINING PROPERTIES AT EXP#2,4.UNFINISHED/INCOMPLETE WORK ON EXTERIOR FACADE, BULKHEADS, PARAPET WALLS/ #39529942R | Jun 18, 2025 IN VIOLATION | $2,500 |
| Jun 25, 2024 | Construction CLASS - 1 RESPONSIBILITY OF TALLER BUILDINGS. 8 STORY NB ACTIVE SITE. OBSERVED ADJOINING PROPERTY AT 3536 WEBSTER AVE BX EXP2,3CHIMNEY/VENTS IN PLACE APPROXIMATELY 2-3 FEET FROM TALLER BUILDINGS EDGE NOT EXTENDED 4FT ABO #39529940N | Jun 18, 2025 IN VIOLATION | $625 |
| Apr 8, 2024 | Plumbing CLASS - 1 OBSERVED ACTIVE WORK ABOVE 8 STORIES/ 75 FEET WHILE STANDPIPE NOT PAINTED RED, MISSING PRESSURE GAUGE VALVES, AND NO HYDROSTATIC TEST. UPON REQUEST FOR HYDROSTATIC TEST, NO HYDROSTATIC TEST WAS PERFORMED FOR TH #39527279K | Jun 27, 2025 IN VIOLATION | $312 |
| Apr 8, 2024 | Construction CLASS - 2 3307.2.6 REQUIREMENTS FOR SIDEWALKS, TEMPORARY WALKWAYS, FOOT BRIDGES, AND PATHWAYS. OBSERVED TEMPORARY PEDESTRIAN WALKWAY GOING INTO JOBSITE. ON CORNERS WHERE PEDESTRIAN VIEWS ARE OBSTRUCTED, NO MIRRORS WHERE #39527276P | Jun 27, 2025 IN VIOLATION | $625 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 6:59 AM ET. BBL 2033600050.