2 floors · 2 apartments · 3,700 sq ft · built 1933 · class S9 · owner of record: Arash Family Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-26 (Accepted). Agency page | Dec 31, 2026 in 66 days | 1 of 1 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 310 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 431 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 9, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39083708P AS OF 4/9/2026., FILE A CERTIFICATE O #39183856P | Dec 11, 2026 PENDING | $1,250 |
| Apr 9, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39083709R . NO PERMIT ON FILE AS OF 4/9/2026., COMPLY WITH COMMISSIONER'S ORDER #39183855N | Dec 11, 2026 PENDING | $2,500 |
| Apr 13, 2023 | Construction CLASS - 1 OBSERVED AT EXTERIOR EXP 1&2 REPLACING ALL 2ND STORY WINDOW LINTELS, INSTALLED A SWING STAGE SCAFFOLD WITH NO PERMITS OR APPROVALS ISSUED FROM DOB, OBTAIN PERMIT; STOP ALL WORK AT EXTERIOR OBTAIN ALL REQUIRED P #39083709R | Apr 1, 2024 IN VIOLATION | $2,500 |
| Apr 13, 2023 | Construction CLASS - 1 OBSERVED 2 WORKERS ON SITE ERECTING/USING SWING SCAFFOLD WITH NO CERTIFICATION AS A SCAFFOLD ERECTOR/USER, DISCONTINUE ACTIVITY AND OBTAIN A SUPPORTED SCAFFOLD CERTIFICATE OF COMPLETION AS REQUIRED; DISCONTINUE #39083708P | Apr 1, 2024 IN VIOLATION | $5,000 |
| Apr 13, 2023 | Cranes and Derricks CLASS - 2 OBSERVED AT EXTERIOR EXP2 INSTALLED SWING STAGE SCAFFOLD ATTACHED TO ROOF PARAPET WALL WITH C HOOKS WITH NO NOTIFICATION OR ENGINEER REPORT GIVEN/PROVIDED FOR STRUCTURAL INTEGRITY SUPPORT FOR SCAFFOLD INSTALLAT #39083710Y | Apr 1, 2024 IN VIOLATION | $2,500 |
| Apr 4, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED AT TWO (2) STORY MIXED USE BUILDING, FACADE IS IN A STATE OF DISREPAIR. THE DEFECT INCLUDES MISSING BRICK MORTAR JOINTS, HO #39082985Z | Sep 20, 2023 IN VIOLATION | $0 |
| Jun 12, 2017 | Plumbing CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER/INSTALLATION MAINTAINCE OF PLUMBING MATERIALS OR EQUIPMENT-PC 102.3;27-902. INSTALLED PROHIBITED MATERIALS PVC DRAINAGE PIPING CONNECTED TO STORM OUT. #35270769R | Dec 18, 2017 IN VIOLATION | $0 |
| Jun 12, 2017 | Plumbing CLASS - 2 FAILURE TO HAVE NEW OR ALTERED PLUMBING SYSTEMS TESTED-OBSERVED LEFT SIDE BLDG STORM PIPING FOR ROOF-INSTALLED 2"WASTE PIPING NO INSPECTION ON FILE. REMEDY: PERFORM INSPECTION. #35270768P | Dec 4, 2017 IN VIOLATION | $0 |
| Jul 2, 2012 | Unknown CLASS - 2 B201. FOUND NEW BOILER INSTALLED; GALAXY AHX 230, 231,000 BTU - WORK W/O PERMIT. #32072232K | Sep 17, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #36517 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #16368 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #17546 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #37823 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #17415 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #11016 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #13523 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #10966 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #27033 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #25163 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 19, 2012 | B | Apt 2F · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Nov 23, 2012 |
| Oct 12, 2012 | C | Apt 2 · SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, APARTMENT AT SOUTH | Oct 11, 2012 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 6:35 AM ET. BBL 3049520010.