10 floors · 550,000 sq ft · built 2012 · class Y2 · owner of record: Nyc Department Of Citywide Administrative Services
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Energy audit and retro-commissioning (2026) Likely applies Local Law 87 · Calendar year 2026 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 4226). Agency page | Dec 31, 2026 in 61 days | Due this year |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $114,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 113 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 550,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 426 days | Next cycle year 2027 |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-26 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY28-302.4 FOR CONTROL#917609.SUBMIT ACCEPTABLE REQUIRED TECHNICAL REPO #37023896Y | Feb 17, 2023 POP/IN-VIO | $0 |
| Feb 7, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES: FACADE IS MISSING A 4'X10' CURTAIN WALL. NORTH SIDE OF BUILDING 5TH TO 6TH FLOOR. REMEDY: REPAIR AND/OR REPLACE #35381474L | May 3, 2019 POP/IN-VIO | $0 |
| Oct 31, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES . NOTED: 4 BY 10 FEET CURTAIN WALL DISPLACED FROM FACADE MISSING AT 5TH OR 6TH LEVEL. NORTH SIDE. #35370083K | Jan 4, 2019 POP/IN-VIO | $0 |
| Sep 8, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: OBSERVED A 4' X 10' CURTAIN WALL DISPLACED FROM FACADE MISSING FROM THE BUILDING @ 5TH & 6TH FLOOR LEVELS. REM: MAINTAIN EXTERIOR WALLS. #35361302R | Nov 30, 2018 POP/IN-VIO | $0 |
| Jul 20, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED AROUND 4'X10' CURTAIN WALL DISPLACED FROM FACADE MISSING FROM THE NORTH SIDE OF BUILDING BETWEEN 5TH AND 6TH FLOOR WHICH IS EXPOS #35333381X | Oct 5, 2018 POP/IN-VIO | $0 |
| Jun 10, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED: AT EXP 3NORTHN FACADE APPRX (4'X10') 1-PIECE OF CURTAIN WALL DISPLACED AND MISSING FROM FACADE AT 5TH FLOOR. RMDY: REPAIR AND/OR REPLACE. #35335404Z | Aug 17, 2018 POP/IN-VIO | $0 |
| Mar 2, 2018 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AROUND 4'X10' CURTAIN WALL DISPLACED FROM FACADE MISS ING FROM THE NORTH SIDE OF BLDG BETWEEN THE 5TH AND 5TH FLOOR, WHICH #35304624Z | Jul 6, 2018 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #02109 | DOB VIOLATION - ACTIVE |
| Oct 26, 2020 | ELEVATOR #9027/692569 | DOB VIOLATION - ACTIVE |
| Aug 13, 2018 | FACADE SAFETY PROGRAM FTM FACADE&APPURTENANCES.ON 3/2/18 ALUMINUM FACADE PANEL FELL FROM THE 6THFL AT NORTH FACADE.REMEDY:OWN IMMED RET LIC ENG'R INSPECT 100% OF ALL FACADE BY HAND,EVAL FACADE COND INCLUD STRL STAB OF FACADE PANELS, PREP&SUB FORENSIC/STRL ENG'R RPT.RPT BE SUB TO DOB FACADES UNIT W/1 MO PROV RPT BY COB 9/ #LL21101EK | DOB VIOLATION - ACTIVE |
| Aug 10, 2018 | CONSTRUCTION NEW OFFICE BLDG USED FOR COMMUNICATING INCOMING&OUTGOING EMERG CALLS TO DIFF NYC AGENCIES.BLDG SUBSTANT COMP&OPERATING ON TEMP CERT OF OCCUP.ON 3/2/18 EXT CLADDING PANEL RECENTLY INSTALL,FELL,TO GRADE IN UNCONTROL MANNER.REMEDY:IMMED ENGAGE LIC PROF EVAL&DETERM SOURCE OF FAIL W/CALLS&PROBE ALL SIDE& #FEU211TDL01 | DOB VIOLATION - ACTIVE |
| Mar 7, 2018 | CONSTRUCTION FAILURE TO MAINT.FACADE&APPURTENANCE-ON 3/2/18 ALUMINIUM FACADE.PNLS FELL FROM THE 6TH FLR@THE NORTHERN FACADE-REMEDY:OWNER TO IMMED.RETAIN A NYS LIC ENG TO INSPECT 100% OF ALL FACADES BY HAND,EVALUATE FACADE COND.INCLUDING STRUCTURAL STABILITY OF FACADE PNLS PREPARE&SUBMIT ENG REPORT.REPORT TO BE S #LL21101EK | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 8:05 AM ET. BBL 2042260075.