Brooklyn · Block 1330 · Lot 14 · 11225

350 Lefferts Avenue

6 floors · 65 apartments · 83,520 sq ft · built 1941 · class D1 · owner of record: 350 Lefferts Realties

114open violations
$33,925ECB/OATH penalties owed
21HPD class C (immediately hazardous)
62dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 62 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 83,520 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1330). Agency page

Dec 31, 2030
in 1523 days
Next due 2030
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-24 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (10) · $33,925 owed
IssuedViolationHearingBalance
Jun 13, 2023Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO#39077647J ISSUED ON
#35656364K
Aug 23, 2023
DEFAULT
$3,125
Jun 13, 2023Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIO#39080359M ISSUED ON
#35656365M
Aug 23, 2023
DEFAULT
$6,250
Feb 27, 2023Construction CLASS - 2
AT TIME OF INSPECTION OBSERVED CONSTRUCTION/DEMOLITION WORK AT GROUND FLOOR LOBBY WHERE CEILING HAS BEEN REMOVED. NO PERMIT ON DOB RECORD. STOP ALL WORK AT GROUND FLOOR EXCEPT HOUSEKEEPING AND SAFETY., OBTAIN A
#39080359M
May 3, 2023
DEFAULT
$3,125
Feb 27, 2023Construction CLASS - 1
FAILURE TO SAFEGUARD. AT TIME OF INSPECTION OBSERVED DURING CONSTRUCTION WORK AT LOBBY CLEAR EXIT PASSAGEWAY OBSTRUCTED BY PLASTIC COVER, CONSTRUCTION ,CONSTRUCTION DEBRIS AND MATERIAL. CONSTRUCTION WORKER WORK
#39080358K
May 3, 2023
DEFAULT
$12,500
Jan 11, 2023Construction CLASS - 1
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, OBSERVED AT APARTMENTS #2J, 6A AND 6D KITCHEN, ONGOING INSTALLATION OF PLUMBING AND GAS PIPELINES INCLUDING REPLACING SINK PIPES AND PIPELINES FOR GAS STOVES WITHOU
#39077647J
Apr 17, 2023
DEFAULT
$6,250
Mar 11, 2022Construction CLASS - 1
WORK W/O PERMITS.OBSERVED UPON INSPECTION IN ATP #3N/#6A UNAUTHORIZED UNAPPROVED ELECTRICAL WORKS BY APROX 2 WORKERS REMOVED PANEL'S BOXES AND ALL SWITCHES/PLUGS FROM WALLS & CEILINGS INSTALLED NEW ELECTRIC WIR
#35578887Z
Oct 21, 2022
IN VIOLATION
$800
Sep 13, 2021Boilers CLASS - 2
MIXING VLV LEAK/WATER PIPE LEAK ABOVE GAS TRAIN/FRESH AIR DUCT IS REDUCED IN SIZE/SAIL SWITCH DEFECT/GAS PIOLIT REGULATOR VENT DEFECT/BLR MISSING LADDER+PLATFORM/WASTE OIL IN BLR ROOM/GAS METER ROOM DOORS NOT I
#39047338Z
Jan 19, 2022
ADMIT/IN-VIO
$0
Nov 3, 2018Elevators CLASS - 2
59M15,98BB05,99BB05. 59M15-BRAKE MAINTENANCE TAG; 98BB05-CAT5 EXPIRED99BB05: CAT1 EXPIRED.
#38265824N
May 6, 2019
IN VIOLATION
$625
Jun 4, 2018Elevators CLASS - 1
97X17 THE ONLY ELEVATOR IN BUILDING OUT OF SERVICE UPON INSPECTION THE DEVICE IS FOUND TO BE OUT OF SERVICE CREATING A HAZARDOUS CONDITION AS PER 1RCNY 11-02 RESTORE TO SERVICE IMMEDIATELY AND NOTIFY NYCDOB
#38263418Z
Sep 17, 2018
IN VIOLATION
$1,250
Jan 9, 2015Construction CLASS - 2
100R07 THE OWNER SHALL HAVE A MAINTENANCE CONTRACT WITH AN APPROVED AGENCY TO PERFORM ELEVATOR REPAIR WORK AND MAINTENANCE. RMDY: PROVIDE WRITEN CONTRACTS WITH AN APPROVED AGENCY.
#38234776X
Mar 2, 2015
WRITTEN OFF
$0
DOB (13)
IssuedViolationStatus
Jun 12, 2024FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00075
DOB VIOLATION - ACTIVE
Oct 4, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#01565
DOB VIOLATION - ACTIVE
Mar 8, 2021ELEVATOR

#9028/697559
DOB VIOLATION - ACTIVE
Mar 3, 2020ELEVATOR

#9028/674110
DOB VIOLATION - ACTIVE
Apr 5, 2019ELEVATOR ANNUAL INSPECTION / TEST
VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
#01788
DOB VIOLATION - ACTIVE
Feb 16, 2019ELEVATOR

#9028/645980
DOB VIOLATION - ACTIVE
Feb 27, 2018ELEVATOR
CEASE USE
#9028H622720
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#05313
DOB VIOLATION - ACTIVE
Feb 12, 2017ELEVATOR

#9028/597699
DOB VIOLATION - ACTIVE
Nov 14, 2016(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
#06097
DOB VIOLATION - ACTIVE
Jun 1, 2016NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST
FAILURE TO PERFORM CATEGORY 5 INSPECTION
#01070
DOB VIOLATION - ACTIVE
May 30, 2014(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
#05362
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#37197
DOB VIOLATION - ACTIVE
DOB NOW Safety (18)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Jun 12, 2024AEUHAZ FTC-AEU-HAZ
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
Oct 4, 2023AEUHAZ FTC-AEU-HAZ
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Report
Active
Aug 11, 2023Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Report
Active
Apr 5, 2019Elevators EVCAT1
Active
Jan 26, 2018Elevators ACC1
Active
Nov 14, 2016Elevators ACC1
Active
Jun 1, 2016Elevators EVCAT5
Active
May 30, 2014Elevators ACC1
Active
HPD (79) · C 21 · B 43 · A 15
IssuedClassViolationCorrect by
Oct 26, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL , 6th STORY, SECTION ''WEST''Jan 29, 2027
Oct 26, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT ROOF DOOR , 6th STORY, SECTION ''EAST''Nov 9, 2026
Oct 26, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT CEILING , 6th STORY, SECTION ''EAST''Nov 30, 2026
Oct 26, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AND SOUTH WALL , 6th STORY, SECTION ''WEST''Nov 30, 2026
Oct 26, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING , 6th STORY, SECTION ''EAST''Jan 29, 2027
Oct 26, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 3rd STORY, SECTION ''EAST''Nov 9, 2026
Oct 26, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Nov 9, 2026
Oct 26, 2026C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT ALL WALLS AND CEILING AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Nov 1, 2026
Oct 26, 2026B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LIGHT FIXTURE AT CEILING AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Nov 30, 2026
Oct 26, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Jan 29, 2027
Jan 12, 2026CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHFeb 7, 2026
Jan 12, 2026CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHFeb 7, 2026
Oct 27, 2025BApt 3C · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT LESS THAN 10 SQFT CEILING IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 3rd APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' ORIGINAL VIOLATION 18055541 ISSUED 26-JUN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRADec 1, 2025
Aug 15, 2025BApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 19, 2025
Aug 15, 2025CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 10, 2025
Aug 15, 2025CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 10, 2025
Aug 15, 2025BApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 19, 2025
Aug 15, 2025BApt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 19, 2025
Aug 15, 2025BApt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 19, 2025
Jul 30, 2025BApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EASTSep 3, 2025
Jul 30, 2025CApt 2B · 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GAug 25, 2025
Jul 14, 2025BApt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQFT AT NORTH , WEST AND SOUTH WALLS IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION AT EASTAug 18, 2025
Jun 27, 2025B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GUARDRAILS, SOUTH WALL, BUILDING 'S LOBBY , AT PUBLIC HALL STAIRS, 1st STORYAug 1, 2025
Jun 27, 2025B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CORRODED AND BOWED STEEL LINTEL AT WINDOW OPENING ,4TH FROM NORTH , 1ST STORY, BUILDING FRONTAug 1, 2025
May 27, 2025BApt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT ALL WALLS IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 4th APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 17639582 ISSUED 22-JAN-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE Jul 1, 2025
Apr 14, 2025BApt 2B · 566 (B) 27-2021.4 HMC: ABATE THE NUISANCE CONSISTING OF PESTS. EVIDENCE OF WATERBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHMay 19, 2025
Apr 14, 2025CApt 2B · 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GMay 10, 2025
Mar 20, 2025CApt 2B · 567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GApr 15, 2025
Mar 20, 2025BApt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHApr 24, 2025
Mar 20, 2025BApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHApr 24, 2025
Jan 27, 2025AApt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC TILE AT WINDOW STOOL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHMay 2, 2025
Jan 27, 2025BApt 6K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC TILE AT FLOOR IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 3, 2025
Jan 27, 2025AApt 6K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC TILE AT WEST AND NORTH WALL IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMay 2, 2025
Jan 27, 2025CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHFeb 22, 2025
Jan 27, 2025BApt 6K · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 3, 2025
Jan 27, 2025BApt 6K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 3, 2025
Jan 27, 2025BApt 2B · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING LIGHT FIXTURE IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHMar 3, 2025
Jan 27, 2025AApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 4th APARTMENT FROM WEST AT NORTHMay 2, 2025
Jan 17, 2025BApt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT DOOR IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''Feb 21, 2025
Jan 16, 2025CApt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQFT AT WEST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''Feb 11, 2025
Jan 14, 2025BApt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST''Feb 18, 2025
May 24, 2024BApt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE ELECTRICAL LIGHT FIXTURE AT CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHJun 28, 2024
May 24, 2024CApt 2B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 35 SQ.FT AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 3rd APARTMENT FROM WEST AT NORTHJun 19, 2024
Feb 21, 2024C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLARFeb 27, 2024
Feb 20, 2024CApt 6K · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHFeb 20, 2024
Feb 2, 2024CApt 6K · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHFeb 28, 2024
Feb 2, 2024BApt 6K · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHMar 8, 2024
Feb 2, 2024CApt 6K · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHFeb 28, 2024
Dec 19, 2023BApt 6K · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJan 23, 2024
Dec 19, 2023BApt 6K · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS FAUCET AT BATHTUB IN THE BATHROOM LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTHJan 23, 2024
Dec 4, 2023C§ 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOMDec 10, 2023
Dec 4, 2023BApt 6L · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 15SQ AT CEILING AND 5SQ AT EAST WALL IN THE BATHROOM LOCATED AT APT 6L, 6th STORY, 2nd APARTMENT FROM WEST AT NORTHJan 8, 2024
Oct 6, 2023B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING AT PUBLIC HALL, 6th STORYNov 10, 2023
Oct 6, 2023A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND EAST WALL AT PUBLIC HALL, 6th STORYJan 9, 2024
Oct 6, 2023BApt 6K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT DOOR IN THE ENTRANCE LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''Nov 10, 2023
Oct 6, 2023B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AND EAST WALL AT PUBLIC HALL, 6th STORYNov 10, 2023
Oct 6, 2023AApt 6K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WINDOWFRAME IN THE 1st ROOM FROM EAST LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''Jan 9, 2024
Oct 6, 2023BApt 6K · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AND OR WATER PENETRATION AT THE WINDOWFRAME 2ND WINDOW FROM WEST AT NORTH IN THE 1st ROOM FROM EAST LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''Nov 10, 2023
Oct 6, 2023BApt 6K · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE FOYER LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''Nov 10, 2023
Oct 6, 2023BApt 6K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE FOYER LOCATED AT APT 6K, 6th STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''west''Nov 10, 2023

Showing 60 of 79. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Oct 26, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND SOUTH WALL , 6th STORY, SECTION ''WEST''Open
Oct 26, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT ROOF DOOR , 6th STORY, SECTION ''EAST''Open
Oct 26, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE AT CEILING , 6th STORY, SECTION ''EAST''Open
Oct 26, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AND SOUTH WALL , 6th STORY, SECTION ''WEST''Open
Oct 26, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING , 6th STORY, SECTION ''EAST''Open
Oct 26, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 3rd STORY, SECTION ''EAST''Open
Oct 26, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Open
Oct 26, 2026HPD C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT ALL WALLS AND CEILING AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Open
Oct 26, 2026HPD B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LIGHT FIXTURE AT CEILING AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Open
Oct 26, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT COMPACTOR CLOSET, 6th STORY, SECTION ''WEST''Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 7:57 PM ET. BBL 3013300014.

Look up another building