Brooklyn · Block 1514 · Lot 16 · 11233

350 Chauncey Street

5 floors · 8 apartments · 8,000 sq ft · built 1974 · class C1 · owner of record: Dca 1 Apartments, Inc.

24open violations
$0ECB/OATH penalties owed
8HPD class C (immediately hazardous)
60dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 60 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 60 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 76 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 304 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 791 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#35255
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (23) · C 8 · B 11 · A 4
IssuedClassViolationCorrect by
Oct 26, 2026CApt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 1, 2026
Oct 26, 2026CApt 4A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 1, 2026
Oct 26, 2026AApt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTJan 29, 2027
Oct 23, 2026C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GNov 18, 2026
Oct 23, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PAVEMENT WITHIN LOT LINE AT FRONT YARDNov 27, 2026
Oct 5, 2026AApt 4A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT. OBSERVED AT CEILING IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTJan 8, 2027
Oct 5, 2026C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GOct 31, 2026
Oct 5, 2026CApt 4A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 11, 2026
Oct 5, 2026CApt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 11, 2026
Oct 5, 2026BApt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTNov 9, 2026
Sep 25, 2026BApt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 30, 2026
Sep 25, 2026BApt 4A · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE ROOF IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOct 30, 2026
Sep 25, 2026AApt 4A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MOLD LESS THAN 10SQ FEET OBSERED AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTDec 29, 2026
May 29, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 4th STORYSep 1, 2026
May 29, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT REAR YARD YARDJul 3, 2026
May 26, 2026B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CONCRETE AT BUILDING FRONT APPROXIMATELY 8SQ FT YARDJun 30, 2026
May 26, 2026C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GJun 21, 2026
Feb 23, 2026C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GMar 21, 2026
Dec 17, 2019BApt 1A · § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTELINE AT SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, APARTMENT AT EASTJan 21, 2020
Dec 17, 2019BApt 1A · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD BASE CABINET'S DOORS AT SINK IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, APARTMENT AT EASTJan 21, 2020
Dec 16, 2019BApt 1A · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD ENTRANCE DOOR IN THE 4th ROOM FROM NORTH AT EAST LOCATED AT APT 1A, 1st STORY, APARTMENT AT EASTJan 20, 2020
Dec 16, 2019BApt 1A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, APARTMENT AT EASTJan 20, 2020
Dec 16, 2019BApt 1A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THROUGH CEILING IN THE KITCHEN LOCATED AT APT 1A, 1st STORY, APARTMENT AT EASTJan 20, 2020

Issued in the last 120 days

DateSourceWhatNow
Oct 26, 2026HPD C§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 26, 2026HPD C§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 26, 2026HPD A§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 23, 2026HPD C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GOpen
Oct 23, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE PAVEMENT WITHIN LOT LINE AT FRONT YARDOpen
Oct 5, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ. FT. OBSERVED AT CEILING IN THE BATHROOM LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 5, 2026HPD C567 (C) § 27-2017, 27-2017.1, 27-2017.4, 27-2017.5, 27-2017.8, 27-2019, 27-2021 HMC: ABATE THE NUISANCE CONSISTING OF EVIDENCE OF RATS AND ALL UNDERLYING CAUSES CREATING THE PEST INFESTATIONS, BY USING INTEGRATED PEST MANAGEMENT (IPM), ELIMINATE ALL BURROW ENTRY AND PASSAGEWAYS, PEST NESTS, HOLES, GOpen
Oct 5, 2026HPD C§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 5, 2026HPD C§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Oct 5, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 25, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 25, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE ROOF IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen
Sep 25, 2026HPD A§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... MOLD LESS THAN 10SQ FEET OBSERED AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM NORTH AT EASTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 1, 2026, 4:23 PM ET. BBL 3015140016.

Look up another building