Manhattan · Block 211 · Lot 3 · 10013

350 Canal Street

2 floors · 47,237 sq ft · built 1938 · class Z3 · owner of record: United States Postal Service

2open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
168dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 47,237 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Apr 21, 2010Construction CLASS - 2
FAILED TO OBTAIN A TEMPORARY CONSTRUCTION PERMIT PRIOR TO INSTALLATION USE OF A SIDEWALK SHED A SIDEWALK SHED IS ERECTED AT EXP#3 THERE IS NO PERMIT ISSUED FOR THIS EQUIPMENT OBTAIN TEMPORARY CONSTRUCTION PERMI
#34832584X
Jun 1, 2010
DEFAULT
$0
DOB (1)
IssuedViolationStatus
Aug 28, 2015PLUMBING
BORO COMMISSIONER HAS ISSUED A FULL STOP WORK ORDER DUE TO WITHDRAWAL OF APP #121789181 REMEDY: STOP ALL WORK IMMEDIATELY; SUBMIT REQUIRED DOCUMENTS TO BORO COMMISSIONERS OFFICE FORTHWITH
#0105MM
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 1:43 PM ET. BBL 1002110003.

Look up another building